6.2.3B Maximum Power Reduction (MPR) for UL-MIMO

36.521-13GPPEvolved Universal Terrestrial Radio Access (E-UTRA)Part 1: Conformance testingRadio transmission and receptionRelease 17TSUser Equipment (UE) conformance specification

6.2.3B.1 Test purpose

The number of RB identified in Table 6.2.3B.3-1 is based on meeting the requirements for adjacent channel leakage ratio for UL-MIMO and the maximum power reduction (MPR) for UL-MIMO due to Cubic Metric (CM).

6.2.3B.2 Test applicability

The requirements of this test apply in test cases 6.6.2.3B Adjacent Channel Leakage power Ratio to all types of E-UTRA UE release 10 and forward that support UL-MIMO.

NOTE: As a result TC 6.2.3B has not been included in the test case applicability table 4.1-1, TS 36.521-2. This does not preclude the test from being used for R&D or other purposes if deemed useful.

6.2.3B.3 Minimum conformance requirements

For UE with two transmit antenna connectors in closed-loop spatial multiplexing scheme, the maximum output power is measured as the sum of the maximum output power at each UE antenna connector. For UE Power Class 3, the allowed Maximum Power Reduction (MPR) for the maximum output power in Table 6.2.2B.3-1 due to higher order modulation and transmit bandwidth configuration (resource blocks) is specified in Table 6.2.3B.3-1 with UL-MIMO configurations defined in Table 6.2.2B.3-2.

Table 6.2.3B.3-1: Maximum Power Reduction (MPR) for Power Class 3

Modulation

Channel bandwidth / Transmission bandwidth configuration [RB]

MPR (dB)

1.4

MHz

3.0

MHz

5

MHz

10

MHz

15

MHz

20

MHz

QPSK

> 5

> 4

> 8

> 12

> 16

> 18

≤ 1

16 QAM

≤ 5

≤ 4

≤ 8

≤ 12

≤ 16

≤ 18

≤ 1

16 QAM

> 5

> 4

> 8

> 12

> 16

> 18

≤ 2

For the UE maximum output power modified by MPR, the power limits specified in clause 6.2.5B.3 apply.

The normative reference for this requirement is TS 36.101 clause 6.2.3B.

6.2.3B.4 Test description

6.2.3B.4.1 Initial condition

Initial conditions are a set of test configurations the UE needs to be tested in and the steps for the SS to take with the UE to reach the correct measurement state.

The initial test configurations consist of environmental conditions, test frequencies, and channel bandwidths based on E-UTRA operating bands specified in clause 5.4.2B.1. All of these configurations shall be tested with applicable test parameters for each channel bandwidth, and are shown in table 6.2.3B.4.1-1. The details of the uplink reference measurement channels (RMCs) are specified in Annexes A.2. Configurations of PDSCH and PDCCH before measurement are specified in Annex C.2.

Table 6.2.3B.4.1-1: Test Configuration Table

Initial Conditions

Test Environment as specified in

TS 36.508 [7] clause 4.1

Normal, TL/VL, TL/VH, TH/VL, TH/VH

Test Frequencies as specified in

TS 36.508 [7] clause 4.3.1

Low range, Mid range, High range

Test Channel Bandwidths as specified in

TS 36.508 [7] clause 4.3.1

Lowest, 5MHz, 10MHz, Highest

Test Parameters for Channel Bandwidths

Downlink Configuration

Uplink Configuration

Ch BW

N/A for Maximum Power Reduction (MPR) test case

Mod’n

RB allocation

FDD

TDD

1.4MHz

QPSK

5

5

1.4MHz

QPSK

6

6

1.4MHz

16QAM

5

5

1.4MHz

16QAM

6

6

3.0MHz

QPSK

4

4

3.0MHz

QPSK

15

15

3.0MHz

16QAM

4

4

3.0MHz

16QAM

15

15

5MHz

QPSK

8

8

5MHz

QPSK

25

25

5MHz

16QAM

8

8

5MHz

16QAM

25

25

10MHz

QPSK

12

12

10MHz

QPSK

50

50

10MHz

16QAM

12

12

10MHz

16QAM

50

(Note 3)

50

(Note 3)

15MHz

QPSK

16

16

15MHz

QPSK

75

75

15MHz

16QAM

16

16

15MHz

16QAM

75

(Note 3)

75

(Note 3)

20MHz

QPSK

18

18

20MHz

QPSK

100

100

20MHz

16QAM

18

18

20MHz

16QAM

100

(Note 3)

100

(Note 3)

Note 1: Test Channel Bandwidths are checked separately for each E-UTRA band, the applicable channel bandwidths are specified in Table 5.4.2.1-1.

Note 2: The RBstart of partial RB allocation shall be RB#0 and RB# (max + 1 – RB allocation) of the channel bandwidth.

Note 3: Applies only for UE-Categories ≥2.

1. Connect the SS and interfering sources to the UE antenna connectors as shown in TS 36.508 [7] Annex A Figure A.28.

2. The parameter settings for the cell are set up according to TS 36.508 [7] clause 4.4.3.

3. Downlink signals are initially set up according to Annex C.0, C.1, and C.3.0, and uplink signals according to Annex H.1 and H.3.0.

4. The UL Reference Measurement channels are set according to Table 6.2.3B.4.1-1.

5. Ensure the UE is in State 3A-RF according to TS 36.508 [7] clause 5.2A.2. Message contents are defined in clause 6.2.3B.4.3.

6.2.3B.4.2 Test procedure

1. SS sends uplink scheduling information for each UL HARQ process via PDCCH DCI format 4 for C_RNTI to schedule the UL RMC according to Table 6.2.3B.4.1-1. Since the UE has no payload and no loopback data to send the UE sends uplink MAC padding bits on the UL RMC.

2. Send continuously uplink power control "up" commands in the uplink scheduling information to the UE to ensure that the UE transmits at PUMAX level.

3. Measure the sum of mean power of the UE at each transmit antenna connector in the channel bandwidth of the radio access mode. The period of measurement shall be at least the continuous duration one sub-frame (1ms). For TDD slots with transient periods are not under test.

6.2.3B.4.3 Message contents

Message contents are according to TS 36.508 [7] subclause 4.6.

6.2.3B.5 Test requirements

The maximum output power, derived in step 2 shall be within the range prescribed by the nominal maximum output power and tolerance in Table 6.2.3B.5-1.

Table 6.2.3B.5-1: UE Power Class test requirements

E-UTRA Band

Class 1 (dBm)

Tol. (Db)

Class 2 (dBm)

Tol. (dB)

Class 3 (dBm)

QPSK partial RB allocation Tol. (dB))

QPSK full RB allocation Tol. (dB))

16QAM partial RB allocation Tol. (dB)

16QAM full RB allocation Tol. (dB)

1

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

2

23

+2.7/-3.71

+2.7/-4.71,2

+2.7/-4.71,2

+2.7/-5.71,2

3

23

+2.7/-3.71

+2.7/-4.71,2

+2.7/-4.71,2

+2.7/-5.71,2

4

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

5

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

6

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

7

23

+2.7/-3.71

+2.7/-4.71,2

+2.7/-4.71,2

+2.7/-5.71,2

8

23

+2.7/-3.71

+2.7/-4.71,2

+2.7/-4.71,2

+2.7/-5.71,2

9

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

10

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

11

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

12

23

+2.7/-3.71

+2.7/-4.71,2

+2.7/-4.71,2

+2.7/-5.71,2

13

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

14

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

17

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

18

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

19

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

20

23

+2.7/-3.71

+2.7/-4.71,2

+2.7/-4.71,2

+2.7/-5.71,2

21

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

22

23

+3.0/-5.5

+3.0/-6.5

+3.0/-6.5

+3.0/-7.5

23

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

24

23

+2.7/-3.7

+2.7/-5.71,2

+2.7/-5.71,2

+2.7/-6.71,2

25

23

+2.7/-3.71

+2.7/-[4.7]1,2

+2.7/-[4.7]1,2

+2.7/-[5.7]1,2

26

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

27

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

28

23

+2.7/[-3.7]

+2.7/[-4.7]

+2.7/[-4.7]

+2.7/[-5.7]

30

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

31

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

33

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

34

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

35

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

36

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

37

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

38

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

39

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

40

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

41

23

+2.7/-3.71

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

42

23

+3.0/-5.0

+3.0/-6.01,2

+3.0/-6.01,2

+3.0/-7.01,2

43

23

+3.0/-5.0

+3.0/-6.0

+3.0/-6.0

+3.0/-7.01,2

44

23

+2.7/[-3.7]

+2.7/[-4.7]

+2.7/[-4.7]

+2.7/[-5.7]

45

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

65

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

66

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

68

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

70

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

72

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

74

23

+2.7/-3.7

+2.7/-4.7

+2.7/-4.7

+2.7/-5.7

Note 1: For transmission configurations (Figure 5.4.2-1) confined within FUL_low and FUL_low + 4 MHz or FUL_high – 4 MHz and FUL_high, the maximum output power requirement is relaxed by reducing the lower tolerance limit by 1.5 dB.

Note 2: For the UE maximum output power modified by MPR, the power limits specified in Table 6.2.5B.3-1 apply