51.5 EGPRS Dual transfer mode

3GPP51.010-1Mobile Station (MS) conformance specificationPart 1: Conformance specificationTS

To bring the MS into active state U10, macro 40.4.3.22 shall be used.

51.5.1 PS establishment whilst in dedicated mode

51.5.1.1 Uplink TBF establishment

51.5.1.1.1 Uplink TBF establishment with no reallocation of CS resources
51.5.1.1.1.1 Uplink TBF establishment with no reallocation of CS resources / Successful case / Uplink resources assigned

51.5.1.1.1.1.1 Conformance requirements

While in dedicated mode, the establishment of an uplink packet resource may be initiated by the RR entity of the mobile station using the packet request procedure. The procedure is triggered by a request from upper layers to transfer an LLC PDU; see 3GPP TS 24.007.

On receipt of a DTM REQUEST message the network may allocate an uplink packet resource. The packet uplink resource is assigned to the mobile station in one of the DTM assignment messages:

– DTM ASSIGNMENT COMMAND or

– PACKET ASSIGNMENT.

The PACKET ASSIGNMENT message is only used when the packet resource is a PDCH and no reallocation of the RR connection is needed.

On receipt of:

– DTM ASSIGNMENT COMMAND message or

– PACKET ASSIGNMENT message,

the mobile station shall stop T3148.

– when the network sends a PACKET ASSIGNMENT message, the packet request procedure is completed for the network when assignment message is sent and for the mobile station when it is received.

When the packet request procedure is completed, the mobile station has entered the dual transfer mode.

References

3GPP TS 04.18/44.018 sub-clause 3.4.22.1.1

51.5.1.1.1.1.2 Test purpose

To verify that the MS:

– decodes correctly the Cell’s System information, understanding that DTM access is allowed;

– requests an uplink TBF when it has something to send;

– acts upon the PACKET ASSIGNMENT message and then transmitting on the PDCH allocated.

51.5.1.1.1.1.3 Method of test

Initial Conditions

System Simulator:

1 cell, DTM supported

Mobile Station:

The MS is in the active state (U10) of a call.
The MS is in packet idle mode with a P-TMSI allocated and PDP context 1 activated.

Specific PICS Statements

PIXIT Statements

Test Procedure

The MS, whilst in dedicated mode, is triggered to initiate packet uplink transfer data in RLC unacknowledged mode and sends a DTM REQUEST message. On receipt of the DTM REQUEST message, requesting uplink resources, the SS assigns the MS PS resource. The SS accomplishes the resource assignment by passing a PACKET ASSIGNMENT message to the MS. On receipt of the PACKET ASSIGNMENT message, the MS starts to send RLC DATA BLOCKS to the SS on the assigned PDTCH.

The codec to be used in this test is chosen dependent on the capabilities of the MS.

MS supporting DTM/EGPRS shall complete testing for k=1and MSs indicating support of single slot DTM/EGPRS shall additionally complete testing for k=2.

Maximum Duration of Test

5 minutes

Expected Sequence

The test sequence is repeated for k = 1,2.

Step

Direction

Message

Comments

1

SS

MS in the active state (U10) of a call on Timeslot N. When:

k=1, Channel Type=TCH/F;

k=2, Channel Type=TCH/H.

2

MS

Trigger the MS to initiate an uplink packet transfer containing 1000 octets.

3

MS->SS

DTM REQUEST

4

SS->MS

PACKET ASSIGNMENT

SS sends this message such that it is received before Timer T3148 expiry. Includes information on the Radio resources provided to the MS. See specific message contents.

5

MS<->SS

{ Uplink data transfer }

Macro – Completion of the 1000 Octets of Data.

Specific Message Contents

PACKET ASSIGNMENT (Step 4):

k=1;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

– TIMESLOT_ALLOCATION

(N  1) MOD 8

Additions for R99:

EGPRS_MCS_MODE

MCS-1

RESEGMENT

0 Retransmitted RLC data blocks shall not be re-segmented

EGPRS Window Size

64

RR Packet Downlink Assignment IE

Not included

k=2;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

– TIMESLOT_ALLOCATION

N

Additions for R99:

EGPRS_MCS_MODE

MCS-1

RESEGMENT

0 Retransmitted RLC data blocks shall not be re-segmented

EGPRS Window Size

64

RR Packet Downlink Assignment IE

Not included

51.5.1.1.1.2 Uplink TBF establishment with no reallocation of CS resources / Successful case / Downlink resources assigned

51.5.1.1.1.2.1 Conformance requirements

While in dedicated mode, the establishment of an uplink packet resource may be initiated by the RR entity of the mobile station using the packet request procedure. The procedure is triggered by a request from upper layers to transfer an LLC PDU; see 3GPP TS 24.007.

On receipt of a DTM REQUEST message the network may allocate an uplink packet resource. The packet uplink resource is assigned to the mobile station in one of the DTM assignment messages:

– DTM ASSIGNMENT COMMAND or

– PACKET ASSIGNMENT.

The PACKET ASSIGNMENT message is only used when the packet resource is a PDCH and no reallocation of the RR connection is needed.

On receipt of:

– DTM ASSIGNMENT COMMAND message or

– PACKET ASSIGNMENT message,

the mobile station shall stop T3148.

If the received DTM ASSIGNMENT COMMAND or PACKET ASSIGNMENT message includes uplink packet resources, the mobile station shall proceed with the packet access. If the received message includes downlink packet resources and no uplink packet resources, the mobile station shall abort the packet access procedure and proceed with the procedure specified in clause 3.4.22.3, and then attempt an establishment of uplink TBF, using the applicable procedure specified in 3GPP TS 04.60.

– when the network sends a PACKET ASSIGNMENT message, the packet request procedure is completed for the network when assignment message is sent and for the mobile station when it is received.

When the packet request procedure is completed, the mobile station has entered the dual transfer mode.

If the received PACKET ASSIGNMENT message includes downlink packet resources and no uplink packet resources, the mobile station shall abort the packet access procedure and proceed with the downlink TBF establishment, and then attempt an establishment of uplink TBF.

References

3GPP TS 04.18/44.018 sub-clauses 3.4.22.1.1, 3.4.22.3
3GPP TS 04.60/44.060 sub-clause 8.1.2.5

51.5.1.1.1.2.2 Test purpose

To verify that the MS:

– decodes correctly the Cell’s System information, understanding that DTM access is allowed;

– requests an uplink TBF;

– acts upon the PACKET ASSIGNMENT message containing downlink resources.

– attempts uplink TBF establishment, once the downlink TBF establishment is complete.

51.5.1.1.1.2.3 Method of test

Initial Conditions

System Simulator:

1 cell, DTM supported

Mobile Station:

The MS is in the active state (U10) of a call on cell A.
The MS is in packet idle mode with a P-TMSI allocated and PDP context 1 activated.

Specific PICS Statements

PIXIT Statements

Test Procedure

The MS, whilst in dedicated mode, is triggered to initiate packet uplink transfer data in RLC unacknowledged mode and sends a DTM REQUEST message. On receipt of the DTM REQUEST message, requesting uplink resources, the SS assigns the MS downlink PS resources using the PACKET ASSIGNMENT message. The MS, upon receipt of the assignment message, aborts the packet access procedure and proceeds with the downlink assignment. When possible the MS requests the uplink TBF establishment. The SS upon receipt of the resource request allocates the MS uplink resources using the PACKET UPLINK ASSIGNMENT message. The MS then starts to send RLC DATA BLOCKS to the SS on the assigned PDTCH.

The codec to be used in this test is chosen dependent on the capabilities of the MS.

MS supporting DTM/EGPRS shall complete testing for k=1 and MSs indicating support of single slot DTM/EGPRS shall additionally complete testing for k=2.

Maximum Duration of Test

5 minutes

Expected Sequence

The test sequence is repeated for k = 1,2.

Step

Direction

Message

Comments

1

SS

MS in the active state (U10) of a call on Timeslot N of cell A. When:

k=1, Channel Type=TCH/F;

k=2, Channel Type=TCH/H.

2

MS

Trigger the MS to initiate an uplink packet transfer containing 1000 octets.

3

MS->SS

DTM REQUEST

4

SS->MS

PACKET ASSIGNMENT

SS sends this message such that it is received before Timer T3148 expiry. See specific message contents.

5

SS<->MS

{ Downlink data }

Macro

6

MS->SS

EGPRS PACKET DOWNLINK ACK/NACK

Channel Request Description IE indicating that uplink resources are required.

7

SS->MS

PACKET UPLINK ASSIGNMENT

When:

k=1, Timeslot = T;

k=2, Timeslot = N.

8

MS<->SS

{ Uplink data transfer }

Macro – Completion of the 10kB of Data.

Specific Message Contents

PACKET ASSIGNMENT (Step 4):

k=1;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

Not included

RR Packet Downlink Assignment IE

– TIMESLOT_ALLOCATION

T = (N  1) MOD 8

Additions for R99:

EGPRS Window Size

64

LINK_QUALITY_MEASUREMENT_MODE 

00

k=2;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

Not included

RR Packet Downlink Assignment IE

– TIMESLOT_ALLOCATION

N

Additions for R99:

EGPRS Window Size

64

LINK_QUALITY_MEASUREMENT_MODE 

00

51.5.1.1.2 Uplink TBF establishment with reallocation of CS resources
51.5.1.1.2.1 Uplink TBF establishment with reallocation of CS resources / Successful case

51.5.1.1.2.1.1 Conformance requirements

Upon receipt of the DTM ASSIGNMENT COMMAND message, the mobile station initiates a local end release of link layer connections, disconnects the physical channels, commands the switching to the assigned channel and initiates the establishment of lower layer connection (this includes the activation of the channel, their connection and the establishment of the main signalling link).

References

3GPP TS 04.18/44.018 sub-clause 3.4.22.1.1.3.1

51.5.1.1.2.1.2 Test purpose

To verify that the MS allows reallocation of its CS resources during the request for PS resources. The resources can either be reallocated to a new timeslot within the same frequency or a new frequency.

51.5.1.1.2.1.3 Method of test

Initial Conditions

System Simulator:

1 cell, DTM supported.

Mobile Station:

The MS is in the active state (U10) of a call.
The MS is in packet idle mode, with a P-TMSI allocated and PDP context 1 activated.

Specific PICS Statements

PIXIT Statements

Test Procedure

The MS, whilst in dedicated mode, is triggered to initiate packet uplink data transfer and sends a DTM REQUEST message. On receipt of the DTM REQUEST message, requesting uplink resources, the SS reallocates the MS’s CS resources and assigns PS resources to the MS. The SS accomplishes the resource assignment by passing a DTM ASSIGNMENT COMMAND message to the MS. Once the MS has received the assignment message, it moves to the new allocation, reconnects the CS resources, passes the ASSIGNMENT COMPLETE message to the SS on the main DCCH and starts to send RLC DATA BLOCKS to the SS on the assigned TBF.

The codec to be used in this test is chosen dependent on the capabilities of the MS.

MS supporting DTM/EGPRS shall complete testing for k=1 and MSs indicating support of single slot DTM/EGPRS shall additionally complete testing for k=2.

Maximum Duration of Test

5 minutes

Expected Sequence

The test sequence is repeated for k = 1,2.

Step

Direction

Message

Comments

1

SS

MS in the active state (U10) of a call on Timeslot N. When:

k=1, Channel Type=TCH/F;

k=2, Channel Type=TCH/H.

2

MS

Trigger the MS to initiate an uplink packet transfer containing 1000 octets.

3

MS->SS

DTM REQUEST

Sent on main DCCH

4

SS->MS

DTM ASSIGNMENT COMMAND

This message is sent such that it is received before expiry of timer T3148. See specific message contents.

5

MS->SS

ASSIGNMENT COMPLETE

Sent on new main DCCH.

6

MS->SS

{ Uplink Data Transfer }

Macro – Completion of the 1000 octets of Data.

Specific Message Contents

DTM ASSIGNMENT COMMAND (Step 4):

k=1;

As default message contents as defined in section 40.2.4.28 except:

Channel Description IE

– Timeslot Number

N’, chosen arbitrarily.

– Channel Type

TCH/F

RR Packet Uplink Assignment IE

– TIMESLOT_ALLOCATION

(N’  1) MOD 8

Additions for R99:

EGPRS_MCS_MODE

MCS-1

RESEGMENT

0 Retransmitted RLC data blocks shall not be re-segmented

EGPRS Window Size

64

RR Packet Downlink Assignment IE

Not included

k=2;

As default message contents as defined in section 40.2.4.28 except:

Channel Description IE

– Timeslot Number

N’, chosen arbitrarily.

– Channel Type

TCH/H

RR Packet Uplink Assignment IE

– TIMESLOT_ALLOCATION

N’

Additions for R99:

EGPRS_MCS_MODE

MCS-1

RESEGMENT

0 Retransmitted RLC data blocks shall not be re-segmented

EGPRS Window Size

64

RR Packet Downlink Assignment IE

Not included

51.5.1.2 Downlink TBF establishment

51.5.1.2.1 Whilst in Ready State
51.5.1.2.1.1 Downlink TBF establishment in Ready State / Successful case

51.5.1.2.1.1.1 Conformance requirements

This procedure is only applicable to a mobile station in dedicated mode and with no TBF allocated. If the mobile station already has an ongoing TBF, the establishment of the downlink packet resource is performed on the PACCH; see 3GPP TS 04.60.

The establishment of a downlink packet resource is initiated by the RR entity on the network side using the packet downlink assignment procedure in dedicated mode. The procedure is triggered by a request from upper layers to transfer an LLC PDU; see 3GPP TS 24.007. The request from upper layers specifies a QoS profile, an RLC mode, DRX parameters and an MS classmark associated with the packet transfer.

The network initiates the packet downlink assignment procedure in dedicated mode by sending a DTM assignment message (i.e. DTM ASSIGNMENT COMMAND or a PACKET ASSIGNMENT) in acknowledged mode on the main DCCH.

The completion of the packet downlink assignment procedure while in dedicated mode depends on the actual assignment message used by the network:

– when the network sends a PACKET ASSIGNMENT message, the packet downlink assignment procedure is completed for the network when assignment message is sent and for the mobile station when it is received.

References

3GPP TS 04.18/44.018 sub-clause 3.4.22.3

51.5.1.2.1.1.2 Test purpose

To test that while in dedicated mode and in ready state, the MS can decode and act upon the allocation of downlink packet resources and enter dual transfer mode.

51.5.1.2.1.1.3 Method of test

Initial Conditions

System Simulator:

1 cell, DTM supported.

Mobile Station:

The MS is in the active state (U10) of a call.
The MS is in the GMM READY state, with a P-TMSI allocated and PDP context 1 activated.

Specific PICS Statements

PIXIT Statements

Test Procedure

Whilst in an active call on timeslot N, the MS receives a PACKET ASSIGNMENT message on the main DCCH, instructing the MS to switch to the designated timeslot. The SS waits a specified time and then starts to transmit to the newly allocated resources. The test procedure is complete when the MS successfully acknowledges the downlink RLC data blocks.

MS supporting DTM/EGPRS shall complete testing for k=1 and MSs indicating support of single slot DTM/EGPRS shall additionally complete testing for k=2.

Maximum Duration of Test

5 minutes

Expected Sequence

The test sequence is repeated for k = 1,2.

Step

Direction

Message

Comments

1

SS

MS in the active state (U10) of a call on Timeslot N of cell A. When:

K=1, Channel Type = TCH/F

K=2, Channel Type = TCH/H

2

SS->MS

PACKET ASSIGNMENT

See specific message contents.

3

SS

SS Waits T3190 – 50% (2.5s)

4

SS<->MS

{ Downlink data transfer }

Macro – Transmitting 10kB of Data

Specific Message Contents

PACKET ASSIGNMENT (Step 2):

k=1;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

Not included

RR Packet Downlink Assignment IE

– TIMESLOT_ALLOCATION

(N  1) MOD 8

Additions for R99:

EGPRS Window Size

64

LINK_QUALITY_MEASUREMENT_MODE 

00

k=2;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

Not included

RR Packet Downlink Assignment IE

– TIMESLOT_ALLOCATION

N

Additions for R99:

EGPRS Window Size

64

LINK_QUALITY_MEASUREMENT_MODE 

00

51.5.2 Void

51.5.3 PS establishment whilst in dual transfer mode

51.5.3.1 Uplink TBF establishment with a downlink TBF established

51.5.3.1.1 Uplink TBF establishment with a downlink TBF established and no PS downlink reallocation

51.5.3.1.1.1 Conformance requirements

The mobile station may request establishment of one or more uplink TBFs when there are one or more ongoing downlink TBFs by including a Channel Request Description or the Extended Channel Request Description information element in the (EGPRS) PACKET DOWNLINK ACK/NACK message. Initiation is triggered by a request from upper layers to transfer an upper layer PDU.

When multiple TBF procedures are not supported, the mobile station initiates the packet access procedure by sending the Channel Request Description information element in the (EGPRS) PACKET DOWNLINK ACK/NACK message on the PACCH and starting timer T3168.

On receipt of an (Extended) Channel Request Description information element in the (EGPRS)PACKET DOWNLINK ACK/NACK message, the network may assign radio resources to the mobile station on one or more PDCHs by transmitting an uplink assignment message (e.g. PACKET UPLINK ASSIGNMENT, MULTIPLE TBF UPLINK ASSIGNMENT, PACKET TIMESLOT RECONFIGURE or MULTIPLE TBF TIMESLOT RECONFIGURE message) on the PACCH, or may reject one or more of the requests by sending a PACKET ACCESS REJECT message on the PACCH. If the PACKET TIMESLOT RECONFIGURE message is sent, then the message shall contain the UPLINK_TFI_ASSIGNMENT field.

On receipt of a PACKET UPLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE message the mobile station shall stop timer T3168 and switch to the assigned PDCHs.

References

3GPP TS 04.60/44.060 sub-clause 8.1..2.5

51.5.3.1.1.2 Test purpose

To verify that the MS can be assigned uplink PS resources, when no reallocation of the existing CS and downlink PS resources is required.

51.5.3.1.1.3 Method of test

Initial Conditions

System Simulator:

1 cell, DTM supported.

Mobile Station:

The MS is in the state "idle, updated, GMM-registered, GPRS attached" with a TMSI, P-TMSI allocated and PDP context 1 has been established. The MS is also in the active state (U10) of a call on the cell.

Specific PICS Statements

PIXIT Statements

Test Procedure

Whilst in an active call on timeslot N, the MS receives a PACKET ASSIGNMENT message on the main DCCH, instructing the MS to switch to a designated timeslot and receive data. The SS then starts to transmit to the newly allocated resources. Before the SS completes transmission of the 1000 octets of data, the MS is triggered to initiate an uplink packet transfer. The SS then sends another RLC Downlink Data block to the MS with the S/P bit set to 1. The MS responds by sending a EGPRS PACKET DOWNLINK ACK/NACK message to the SS including the Channel Request Description IE. The SS allocates uplink resources to the MS with the PACKET UPLINK ASSIGNMENT message. The test procedure is complete when the SS successfully verifies both uplink and downlink transmission are working in parallel.

MS supporting DTM/EGPRS shall complete testing for k=1 and MSs indicating support of single slot DTM/EGPRS shall additionally complete testing for k=2.

Maximum Duration of Test

5 minutes

Expected Sequence

The test sequence is repeated for k = 1,2.

Step

Direction

Message

Comments

1

SS

MS in the active state (U10) of a call on Timeslot N of cell A. When:

k=1, Channel Type = TCH/F;

k=2, Channel Type = TCH/H.

2

SS->MS

PACKET ASSIGNMENT

See specific message contents.

3

SS<->MS

{ Downlink data transfer }

Macro – Transmission of 10k octets of data

4

MS

Before the completion of the downlink transmission, the MS is triggered to initiate an uplink packet transfer containing 1000 octets.

5

SS<->MS

{ Downlink data transfer }

RLC Downlink Data – S/P Bit = 1

Continue the { Downlink data transfer } until the MS include the Channel Request Description IE in the EGPRS PACKET DOWNLINK ACK/NACK.

6

SS->MS

PACKET UPLINK ASSIGNMENT

When:

k=1, Timeslot=T; and

k=2, Timeslot=N.

7

SS

Verify both uplink and downlink data transmission is functioning correctly.

Specific Message Contents

PACKET ASSIGNMENT (Step 2):

k=1;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

Not included

RR Packet Downlink Assignment IE

– TIMESLOT_ALLOCATION

T = (N  1) MOD 8

Additions for R99:

EGPRS Window Size

64

LINK_QUALITY_MEASUREMENT_MODE 

00

k=2;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

Not included

RR Packet Downlink Assignment IE

– TIMESLOT_ALLOCATION

N

Additions for R99:

EGPRS Window Size

64

LINK_QUALITY_MEASUREMENT_MODE 

00

51.5.3.2 Downlink TBF establishment with a uplink established

51.5.3.2.1 Downlink TBF establishment with a uplink TBF established and no PS uplink reallocation

51.5.3.2.1.1 Conformance requirements

During uplink transfer, the network may initiate a downlink TBF by sending a PACKET DOWNLINK ASSIGNMENT message, or a PACKET TIMESLOT RECONFIGURE, to the mobile station on the PACCH. If a PACKET TIMESLOT RECONFIGURE message is sent, then the message shall contain the DOWNLINK_TFI_ASSIGNMENT field. The multislot restrictions of the mobile station shall be observed.

References

3GPP TS 04.60/44.060 sub-clause 8.1.1.1.3

51.5.3.2.1.2 Test purpose

To verify that a downlink TBF can be established without reallocation of uplink PS resources, whilst maintaining DTM.

51.5.3.2.1.3 Method of test

Initial Conditions

System Simulator:

1 cell, DTM supported

Mobile Station:

The MS is in the active state (U10) of a call.
The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated.

Specific PICS Statements

PIXIT Statements

Test Procedure

The MS, whilst in dedicated mode, is triggered to initiate packet uplink transfer of 1000 octets of data in RLC unacknowledged mode and sends a DTM REQUEST message. On receiving the DTM REQUEST message, requesting uplink resources, the SS assigns the MS an uplink TBF. The SS accomplishes the resource assignment by passing a PACKET ASSIGNMENT message to the MS. On receiving the PACKET ASSIGNMENT message, the MS starts to send RLC DATA BLOCKS to the SS on the assigned PDTCH. Once the MS has sent correctly approximately 500 octets, the SS transmits a PACKET DOWNLINK ASSIGNMENT message allocating the MS downlink packet resources. The test procedure is complete when the SS successfully verifies both uplink and downlink transmission are working in parallel.

MS supporting DTM/EGPRS shall complete testing for k=1 and MSs indicating support of single slot DTM/EGPRS shall additionally complete testing for k=2.

Maximum Duration of Test

5 minutes

Expected Sequence

The test sequence is repeated for k = 1,2.

Step

Direction

Message

Comments

1

SS

MS in the active state (U10) of a call on Timeslot N. When:

k=1, Channel Type=TCH/F;

k=2, Channel Type=TCH/H.

2

MS

Trigger the MS to initiate an uplink packet transfer containing 1000 octets.

3

MS->SS

DTM REQUEST

4

SS->MS

PACKET ASSIGNMENT

Includes information on the Radio resources provided to the MS. See specific message contents.

5

MS<->SS

{ Uplink data }

Macro – Approximately 500 Octets

6

SS->MS

PACKET DOWNLINK ASSIGNMENT

When:

k=1, Timeslot = (N  1) MOD 8;

k=2, Timeslot =N.

7

SS

Verify both uplink and downlink data transmission is functioning correctly.

Specific Message Contents

PACKET ASSIGNMENT (Step 4):

k=1;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

– TIMESLOT_ALLOCATION

(N  1) MOD 8

Additions for R99:

EGPRS_MCS_MODE

MCS-1

RESEGMENT

0 Retransmitted RLC data blocks shall not be re-segmented

EGPRS Window Size

64

RR Packet Downlink Assignment IE

Not included

k=2;

As default message contents as defined in section 40.2.4.31 except:

RR Packet Uplink Assignment IE

– TIMESLOT_ALLOCATION

N

Additions for R99:

EGPRS_MCS_MODE

MCS-1

RESEGMENT

0 Retransmitted RLC data blocks shall not be re-segmented

EGPRS Window Size

64

RR Packet Downlink Assignment IE

Not included