42.4.2 Cell change order procedures
3GPP51.010-1Mobile Station (MS) conformance specificationPart 1: Conformance specificationTS
42.4.2.1 Cell change order procedure / Uplink transfer
42.4.2.1.1 Cell change order procedure / Uplink transfer / Normal case
42.4.2.1.1.1 Conformance requirement
The cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message to the mobile station on the PCCCH or PACCH. Upon receipt of the PACKET CELL CHANGE ORDER message the mobile station shall start timer T3174.
When a cell reselection is made controlled by the network, the mobile station shall act upon the IMMEDIATE_REL value which has been received in the Packet Cell Change Order: if required, the mobile station shall abort any TBF in progress by immediately ceasing to decode the downlink, ceasing to transmit on the uplink, stopping all RLC/MAC timers except for timers related to measurement reporting. The mobile station shall then switch to the identified specified new cell and shall obey the relevant RLC/MAC procedures on this new cell.
42.4.2.1.1.2 Test Purpose
To verify the when NC2 is commanded, the MS sends PACKET MEASUREMENT REPORT messages, in which both the serving and non-serving cells are reported.
To verify that when the cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message with the IMMEDIATE_REL value set to 1, the MS shall abort any TBF in progress and stop transmitting.
To verify that the MS shall switch to the new cell.
Reference
3GPP TS 04.60, subclauses 8.4 and 5.5.1.1.
42.4.2.1.1.3 Method of test
Initial conditions
System Simulator:
2 cells (cell A and cell B), activated at power-on, GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context 2 established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in transfer mode.
Test procedure
MS is brought into uplink packet transfer mode. SS commands MS to NC2 with PACKET MEASUREMENT ORDER. SS waits for a PACKET MEASUREMENT REPORT to contain measurement results for both cell A and cell B. SS sends a PACKET CELL CHANGE ORDER message. SS checks that there is no traffic on the old cell. MS switches to the new cell and re-establishes the uplink TBF.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
{ Uplink dynamic allocation one phase access with contention resolution } or {Uplink dynamic allocation two phase access} |
Macro parameters: 400: the number of RLC data block to be transferred, USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
1a |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS in step 1 |
|
|
2 |
MS -> SS |
RLC data blocks |
MS sends data |
|
3 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
4 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH, 3 block periods from the PACKET UPLINK ACK/NACK in step 3. USF assigned to the MS. |
|
5a |
MS->SS |
RLC data block |
|
|
5b |
MS->SS |
PACKET MEASUREMENT REPORT |
|
|
6 |
SS |
Repeat step 5 (periodically assign USF to the MS) until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message. |
|
|
7 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. IMMEDIATE_REL bit is set to "1" Contains -BSIC + BCCH frequency of cell B. -The network control order, NC2 – USF assigned to the MS in step 1 See specific message contents |
|
8 |
SS |
Check that no more than six data blocks are transmitted from the MS on the old channel. |
|
|
9 |
{ Uplink dynamic allocation one phase access with contention resolution } or {Uplink dynamic allocation two phase access} |
USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 These macros are to be used from the step 1 onwards. This Macro is to be performed on the cell B. |
|
|
10 |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS in step 9. |
|
11 |
MS -> SS |
RLC data blocks |
MS sends data |
|
12 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
Note: in step 5x, the MS shall perform either the ‘a’ branch or the ‘b’ branch.
Specific message contents
PACKET MEASUREMENT ORDER in step 4:
|
Global TFI |
TFI of the uplink TBF |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
010 (1.92 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in step 7:
|
Global TFI |
TFI of the uplink TBF |
|
IMMEDIATE_REL |
1 |
|
ARFCN, BSIC |
specified for cell B |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
100 (7.68 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
42.4.2.1.2 Void
42.4.2.1.3 Cell change order procedure / Uplink transfer / Failure cases / REJECT from the new cell
42.4.2.1.3.1 Conformance requirement
42.4.2.1.3.1.1 Conformance requirement for Rel-5 and earlier
If a PACKET ACCESS REJECT message is received from the new cell, the mobile station shall start timer T3176, return to the old cell and send a PACKET CELL CHANGE FAILURE message to the network.
If the mobile station was in uplink packet transfer before the cell change, the mobile station shall establish a new uplink TBF and send the PACKET CELL CHANGE FAILURE message on this TBF. The mobile station shall then resume its uplink transfer on this TBF.
Reference
3GPP TS 04.60/44.060, subclause 8.4.1.
42.4.2.1.3.1.2 Conformance requirement for Rel-6 and later
In the following cases, the mobile station shall determine that the network controlled cell reselection procedure has failed:
- Access is denied in the new cell (i.e., the mobile station receives an IMMEDIATE ASSIGNMENT REJECT, a PACKET ASSIGNMENT REJECT or, in a UTRAN cell, an RRC CONNECTION REJECT message). Cause: “Immediate Assign Reject or Packet Access Reject on target cell”.
The mobile station shall send a PACKET CELL CHANGE FAILURE message with the appropriate cause value to the network in the old cell and stop timer T3176. The PACKET CELL CHANGE FAILURE message may be sent on PACCH when the mobile station is in packet transfer mode or MAC-Shared state. Alternatively, the mobile station may initiate random access with access type “single block without TBF establishment” (PCCCH) / “single block packet access” (CCCH) and send the PACKET CELL CHANGE FAILURE message using an allocated single uplink block.
Reference
3GPP TS 44.060, subclause 8.4.2.
42.4.2.1.3.2 Test Purpose
To verify that the mobile station sends a PACKET CELL CHANGE FAILURE message to the network from the old cell, if a PACKET ACCESS REJECT message is received from the new cell.
42.4.2.1.3.3 Method of test
Initial conditions
System Simulator:
2 cells (cell A, cell B), activated at power-on, GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context 2 established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in Transfer mode.
Test procedure
MS is brought into uplink packet transfer mode. SS sends the PACKET CELL CHANGE ORDER message to the MS. MS sends the CHANNEL REQUEST. SS sends IMMEDIATE ASSIGNMENT REJECT message. MS returns to the old cell and sends PACKET CELL CHANGE FAILURE message to the network.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
{Uplink dynamic allocation two phase access} |
Macro parameters: USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
2 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH, 3 block periods after contention resolution in step 1 has been completed. See specific message contents |
|
3 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
4a |
MS -> SS |
RLC data blocks |
MS sends data |
|
4b |
MS -> SS |
PACKET MEASUREMENT REPORT |
|
|
5 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
6 |
SS |
Repeat steps 3-5 until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message. |
|
|
7 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. Contains -BSIC + BCCH frequency -The network control order See specific message contents |
|
8 |
MS -> SS |
CHANNEL REQUEST |
To the new cell. ‘One Phase Access Request’ or ‘Two Phase Access Request’ |
|
9 |
SS -> MS |
IMMEDIATE ASSIGNMENT REJECT |
Received from the new cell |
|
10 |
MS -> SS |
CHANNEL REQUEST |
Received on RACH To the old cell. Sent within 15 seconds from the IMMEDIATE ASSIGNMENT REJECT in step 9. |
|
11 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH. Single block assignment. |
|
12 |
MS -> SS |
PACKET CELL CHANGE FAILURE or PACKET RESOURCE REQUEST |
Error cause in PACKET CELL CHANGE FAILURE: "Packet Access Reject on target cell" See specific message content. Branch ‘b’ will be performed when PACKET RESOURCE REQUEST is received. |
|
13a |
MS -> SS |
CHANNEL REQUEST |
To the old cell. |
|
14a |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on the AGCH. Single block assignment |
|
15a |
MS -> SS |
PACKET RESSOURCE REQUEST |
Send on the assigned block. |
|
16a |
SS -> MS |
PACKET UPLINK ASSIGNMENT |
Sent on PACCH. Dynamic allocation |
|
13b |
SS -> MS |
PACKET UPLINK ASSIGNMENT |
Sent on PACCH. Dynamic allocation. |
|
14b |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
15b |
MS -> SS |
PACKET CELL CHANGE FAILURE |
Error cause:" Packet Access Reject on target cell " See specific message content |
|
17 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
If the first received RLC Data Block in current TBF contains an empty LLC PDU, the SS shall accept Packet Resource Request from MS and respond with Packet Uplink Assignment. The USF shall be assigned once more to the MS. NOTE: The empty LLC PDU may be accompanied by another low priority RLC data block (with Packet Resource Request and Packet Uplink Assignment as required), in order to ensure that the radio resources are used efficiently. |
|||
|
18a |
MS -> SS |
RLC data blocks |
MS sends data |
|
18b |
MS -> SS |
PACKET MEASUREMENT REPORT |
|
|
19 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH if step 18a was executed. |
|
Note: In steps 4x, steps 12x-16x and 18x the MS shall perform either the ‘a’ branch or the ‘b’ branch. |
|||
Specific message contents
PACKET MEASUREMENT ORDER in step 2:
|
Global TFI |
TFI of the uplink TBF |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
010 (1.92 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in step 7:
|
Global TFI |
TFI of the uplink TBF |
|
IMMEDIATE_REL |
1 |
|
ARFCN, BSIC |
specified for cell B |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
100 (7.68 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE FAILURE in step 12/15b:
|
Packet Cell Change Failure message content: |
|
|
CAUSE |
0010 |
42.4.2.1.4 Cell change order procedure / Uplink transfer / Failure cases / Contention resolution failure
42.4.2.1.4.1 Conformance requirement
42.4.2.1.4.1.1 Conformance requirement for Rel-5 and earlier
If the contention resolution procedure fails on the new cell, then the mobile station shall start timer T3176 and return to the old cell. The mobile station shall send a PACKET CELL CHANGE FAILURE message to the network.
If the mobile station was in uplink packet transfer before the cell change, the mobile station shall establish a new uplink TBF and send the PACKET CELL CHANGE FAILURE message on this TBF. The mobile station shall then resume its uplink transfer on this TBF.
References
3GPP TS 04.60/44.060, subclause 8.4.1
42.4.2.1.4.1.2 Conformance requirement for Rel-6 and later
The mobile station shall regard the network controlled cell reselection procedure as successfully completed when it has performed access and successfully completed contention resolution in the new cell.
In the following cases, the mobile station shall determine that the network controlled cell reselection procedure has failed:
– The mobile station is unable to synchronise to the new cell (see 3GPP TS 45.008) or the timer T3174 expires before a successful completion of the network controlled cell reselection procedure. Cause: ‘No response on target cell’.
If the mobile station determines that the network controlled cell reselection procedure has failed, the mobile station shall stop timer T3174 (if it is still running) and start timer T3176. The mobile station shall return to the old cell, where it may trigger a cell update or other GMM specific procedure. In case the mobile station synchronised and attempted to access the new cell before returning to the old cell, the mobile station shall trigger a cell update or other GMM specific procedure, as appropriate according to the GMM requirements (see 3GPP TS 24.008).
The mobile station shall send a PACKET CELL CHANGE FAILURE message with the appropriate cause value to the network in the old cell and stop timer T3176. The PACKET CELL CHANGE FAILURE message may be sent on PACCH when the mobile station is in packet transfer mode or MAC-Shared state. Alternatively, the mobile station may initiate random access with access type ‘single block without TBF establishment’ (PCCCH) / ‘single block packet access’ (CCCH) and send the PACKET CELL CHANGE FAILURE message using an allocated single uplink block.
References
3GPP TS 44.060, subclauses 8.4.1 and 8.4.2
42.4.2.1.4.2 Test Purpose
To verify that the mobile station initiates a random access to the old cell, if the contention resolution procedure fails on the new cell.
42.4.2.1.4.3 Method of test
Initial conditions
System Simulator:
2 cells (cell A, cell B), activated at power-on , GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached. Ready timer is set to 44 seconds
PDP context established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in Transfer mode.
Test procedure
MS is brought into uplink packet transfer mode. SS sends the PACKET CELL CHANGE ORDER message to the MS. MS sends the CHANNEL REQUEST to the new cell. Contention resolution procedure fails in the new cell. While timer T3174 is running the MS may re-initiate the packet access procedure on the new cell. MS initiates a random access to the old cell and sends PACKET CELL CHANGE FAILURE message to the network.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
{Uplink dynamic allocation two phase access} |
MS is brought into uplink packet transfer mode and contention resolution is completed. Macro parameters: USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
2 |
SS -> MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH, 3 block periods after contention resolution in step 1 has been completed. See specific message contents |
|
3 |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
4a |
MS -> SS |
RLC data blocks |
MS sends data |
|
4b |
MS -> SS |
PACKET MEASUREMENT REPORT |
|
|
5 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
6 |
SS |
Repeat steps 3-5 until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message. |
|
|
7 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Sent on PACCH. Contains -BSIC + BCCH frequency -The network control order See specific message contents. |
|
8 |
MS -> SS |
CHANNEL REQUEST |
Received on RACH To the new cell. ‘One Phase Packet Access’ or ‘Single Block Packet Access’ If MS request ‘One Phase Access Request’ branch A applies, otherwise branch B applies. |
|
9A |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on the AGCH. |
|
10A |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS. Sent at earliest 3 block periods from the IMMEDIATE ASSIGNMENT in step 9A. |
|
11A |
MS -> SS |
RLC data block |
The data block contains the TLLI. The TLLI should be the same in each RLC data block header. Or The RLC data serves as cell update. |
|
12A |
SS -> MS |
PACKET UPLINK ACK/NACK |
Contention resolution procedure fails in the new cell. Message has wrong TLLI. Sequence continues on step 13 |
|
9B |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on the AGCH. Single block allocation. |
|
10B |
MS -> SS |
PACKET RESSOURCE REQUEST |
Send on the assigned block. |
|
11B |
SS -> MS |
PACKET UPLINK ASSIGNMENT |
Sent on the PACCH. Dynamic allocation, Message has wrong TLLI. |
|
While timer T3174 is running the MS may re-initiate the packet access procedure on the new cell using one of the access types specified in step 8. In this case steps 9A to 12A or 9B to 11B are repeated. The SS verifies that no CHANNEL REQUEST is received on cell B after expiry of timer T3174. |
|||
|
13 |
MS -> SS |
CHANNEL REQUEST |
To the old cell. Within 15 seconds from PACKET UPLINK ACK/NACK in step 12A or the PACKET UPLINK ASSIGNMENT in step 11B. Received on RACH ‘One Phase Packet Access’ or ‘Single Block Packet Access’ If MS requests ‘Single Block Packet Access’ branch A shall apply, otherwise branch B applies. |
|
14A |
SS -> MS |
ÍMMEDIATE ASSIGNMENT |
Sent on AGCH. Single block assignment. |
|
15A |
MS -> SS |
PACKET CELL CHANGE FAILURE |
Presence of error code should be checked, value should be ‘0001’ (No response on target cell) |
|
16A |
MS -> SS |
CHANNEL REQUEST |
To the old cell. ‘One Phase Access Request’ or ‘Single Block Packet Access’. |
|
17A |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on the AGCH. Single block assignment. (forcing two phase access). |
|
18A |
MS -> SS |
PACKET RESSOURCE REQUEST |
Send on the assigned block. |
|
19A |
SS -> MS |
PACKET UPLINK ASSIGNMENT |
Sent on the PACCH. Dynamic allocation. Sequence continues in step 20. |
|
14B |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on the AGCH. Single block assignment. |
|
15B |
MS -> SS |
PACKET RESSOURCE REQUEST |
Send on the assigned block. |
|
16B |
SS -> MS |
PACKET UPLINK ASSIGNMENT |
Sent on the PACCH. Dynamic allocation, |
|
17B |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
18B |
MS -> SS |
PACKET CELL CHANGE FAILURE |
Presence of error code should be checked, value should be ‘0001’ (No response on target cell) |
|
20 |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
21 |
MS -> SS |
RLC data block |
MS sends data |
|
22 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
Specific message contents
PACKET MEASUREMENT ORDER in step 2:
|
Global TFI |
TFI of the uplink TBF |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
010 (1.92 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in step 7:
|
Global TFI |
TFI of the uplink TBF |
|
IMMEDIATE_REL |
1 |
|
ARFCN, BSIC |
specified for cell B |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
110 (30.72 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
42.4.2.1.5 Void
42.4.2.1.6 Cell change order procedure / Uplink transfer / Failure cases / Frequency not implemented
42.4.2.1.6.1 Conformance requirement
If the network message instructs the mobile station to use a frequency that it is not capable of using, the mobile station shall send a PACKET CELL CHANGE FAILURE message with cause "frequency not implemented" and remain on the current PDCH(s).
42.4.2.1.6.2 Test Purpose
To verify that the mobile station returns a PACKET CELL CHANGE FAILURE message, if the ordered frequency cannot be used.
Reference
3GPP TS 04.60, subclause 8.4.2.
42.4.2.1.6.3 Method of test
System Simulator:
1 cell, GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in Transfer mode.
Test procedure
MS is brought into uplink packet transfer mode. SS sends the PACKET CELL CHANGE ORDER message. MS is not capable of using the ordered frequency and sends a PACKET CELL CHANGE FAILURE message to the network. MS shall remain on the current PDCH(s).
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
{Uplink dynamic allocation two phase access} |
MS is brought into uplink packet transfer mode. Macro parameters: USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
2 |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
3 |
MS -> SS |
RLC data blocks |
MS sends data |
|
4 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
5 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Contains -BSIC + BCCH frequency -The network control order MS is not capable of using the ordered frequency. |
|
6 |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
7 |
MS -> SS |
PACKET CELL CHANGE FAILURE |
Sent on the PACCH. Error cause "frequency not implemented". See specific message content. |
|
8 |
MS |
MS shall remain on the current PDCH(s). |
|
|
9 |
SS -> MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
10 |
MS -> SS |
RLC data blocks |
MS sends data |
|
11 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
Specific message contents
PACKET CELL CHANGE FAILURE in step 7:
|
Packet Cell Change Failure message content: |
|
|
CAUSE |
0000 |
42.4.2.2 Cell change order procedure / Downlink transfer
42.4.2.2.1 Cell change order procedure / Downlink transfer / Normal case
42.4.2.2.1.1 Conformance requirement
The cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message to the mobile station on the PCCCH or PACCH. Upon receipt of the PACKET CELL CHANGE ORDER message the mobile station shall start timer T3174.
When a cell reselection is made controlled by the network, the mobile station shall act upon the IMMEDIATE_REL value which has been received in the Packet Cell Change Order: if required, the mobile station shall abort any TBF in progress by immediately ceasing to decode the downlink, ceasing to transmit on the uplink, stopping all RLC/MAC timers except for timers related to measurement reporting. The mobile station shall then switch to the identified specified new cell and shall obey the relevant RLC/MAC procedures on this new cell.
42.4.2.2.1.2 Test Purpose
To verify that when NC2 is commanded, the MS sends PACKET MEASUREMENT REPORT messages, in which both the serving and non-serving cells are reported.
To verify that the cell change order procedure is started when the MS receives a PACKET CELL CHANGE ORDER message.
To verify that the MS switches to the new cell.
To verify that the MS correctly performs a cell update.
To verify that the MS uses the established downlink TBF on the new cell.
Reference
3GPP TS 04.60, subclauses 8.4 and 5.5.1.1.
42.4.2.2.1.3 Method of test
Initial conditions
System Simulator:
2 cells (cell A, cell B), activated at power-on, GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in Transfer mode.
Test procedure
MS is brought into downlink packet transfer mode. SS sends a PACKET CELL CHANGE ORDER message. MS switches to the new cell and SS establishes a new downlink TBF.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
SS->MS |
IMMEDIATE ASSIGNMENT |
SS establish a Downlink TBF. |
|
2 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH, 3 block periods from the IMMEDIATE ASSIGNMENT in step 1. See specific message contents |
|
3 |
SS->MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
4a |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
4b |
MS->SS |
PACKET MEASUREMENT REPORT |
Sent on PACCH. |
|
5 |
SS |
Repeat steps 3-4 until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message. The SS verifies that for the first 2 polls, PACKET DOWNLINK ACK/NACK messages are sent by the MS. |
|
|
6 |
SS->MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. IMMEDIATE_REL bit is set to "1" Contains -BSIC + BCCH frequency of cell B -The network control order, NC2 See specific message contents |
|
7 |
MS->SS |
CHANNEL REQUEST |
To the new cell. Received on RACH |
|
8 |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH. |
|
9 |
MS->SS |
RLC data block |
Sent on the PDCH. The RLC data also serves as cell update. |
|
10 |
SS->MS |
PACKET UPLINK ACK/NACK |
Sent on the PACCH with valid RRBP. |
|
11 |
MS->SS |
PACKET CONTROL ACK |
|
|
12 |
SS |
The SS waits 2 sec for expiring timer T3158 which was set in PACKET MEASUREMENT ORDER message in step 2; If the MS does not send a CHANNEL REQUEST for sending a PACKET MEASUREMENT REPORT continue with step 14 |
|
|
13a |
MS->SS |
CHANNEL REQUEST |
Single Block without TBF establishment |
|
13b |
SS->MS |
IMMEDIATE ASSIGNMENT |
|
|
13c |
MS->SS |
PACKET MEASUREMENT REPORT |
|
|
14 |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCCH. On the new cell. Addressing the MS with TLLI. |
|
15 |
SS->MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
16 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
Note 1: in step 4x, the MS shall perform either the ‘a’ branch or the ‘b’ branch.
Note 2: steps 13a-c are performed only when MS tries to send a PACKET MEASUREMENT REPORT after expiring of T3158 in step 12
Specific message contents
PACKET MEASUREMENT ORDER in step 2:
|
Global TFI |
TFI of the downlink TBF |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
010 (1.92 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in step 6:
|
Global TFI |
TFI of the downlink TBF |
|
IMMEDIATE_REL |
1 |
|
ARFCN, BSIC |
specified for cell B |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
100 (7.68 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
42.4.2.2.2 Cell change order procedure / Downlink transfer / Failure cases / REJECT from the new cell
42.4.2.2.2.1 Conformance requirement
If a PACKET ACCESS REJECT message is received from the new cell, the mobile station shall start timer T3176, return to the old cell and send a PACKET CELL CHANGE FAILURE message to the network.
If the mobile station was in downlink packet transfer mode before the cell change, the mobile station shall initiate a random access to the old cell, with access type "single block without TBF establishment", and then transmit the PACKET CELL CHANGE FAILURE message on the single block.
42.4.2.2.2.2 Test Purpose
To verify that the mobile station sends a PACKET CELL CHANGE FAILURE message to the network in the old cell, if a IMMEDIATE ASSIGNMENT REJECT message is received from the new cell.
Reference
3GPP TS 04.60, subclause 8.4.1.
42.4.2.2.2.3 Method of test
Initial conditions
System Simulator:
2 cells (cell A, cell B), activated at power-on GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached. Ready Timer is deactivated.
PDP context 2 established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in idle mode.
Test procedure
MS is brought into downlink packet transfer mode. SS sends the PACKET CELL CHANGE ORDER message to the MS. MS sends the CHANNEL REQUEST. SS sends IMMEDIATE ASSIGNMENT REJECT message. MS returns to the old cell and sends PACKET CELL CHANGE FAILURE message to the network.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on the PCH. |
|
2 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH, 3 block periods from the IMMEDIATE ASSIGNMENT in step 1. See specific message contents |
|
3 |
SS -> MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
4a |
MS -> SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
4b |
MS->SS |
PACKET MEASUREMENT REPORT |
Sent on PACCH. |
|
5 |
SS |
Repeat steps 3-4 until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message. The SS verifies that for the first 2 polls, PACKET DOWNLINK ACK/NACK messages are sent by the MS. |
|
|
6 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. IMMEDIATE_REL bit is set to "1" Contains -BSIC + BCCH frequency of cell B. -The network control order, NC2 See specific message contents |
|
7 |
MS -> SS |
CHANNEL REQUEST |
To the new cell. |
|
8 |
SS -> MS |
IMMEDIATE ASSIGNMENT REJECT |
Received from the new cell |
|
9a |
MS -> SS |
CHANNEL REQUEST |
To the old cell within 15 seconds from the IMMEDIATE ASSIGNMENT REJECT in step 8. |
|
10a |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH, single block allocation |
|
11a |
MS -> SS |
PACKET CELL CHANGE FAILURE |
Single block. Error cause:" Packet Access Reject on target cell " See specific message content |
|
9b |
MS -> SS |
CHANNEL REQUEST |
To the old cell within 15 seconds from the IMMEDIATE ASSIGNMENT REJECT in step 8. |
|
10b |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH, dynamic allocation |
|
11b |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
Sent on PACCH, at earlier 3 block periods for the PACKET UPLINK ASSIGNMENT in step 10b. Assigns USF allocated to the MS |
|
12b |
MS -> SS |
PACKET CELL CHANGE FAILURE |
Error cause:" Packet Access Reject on target cell " See specific message content |
|
13b |
SS->SS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
Sent on PACCH Assigns an USF allocated to the MS |
|
14b |
MS->SS |
RLC data block |
empty LLC PDU serving as cell update, CV=0 |
|
15b |
SS->MS |
PACKET UPLINK ACK/NACK |
FAI =1, S/P=1. Including the TLLI of the MS. |
|
16b |
MS->SS |
PACKET CONTROL ACKNOWLEDGEMENT |
Note: in step 4x and 9x to 11x/16x, the MS shall perform either the ‘a’ branch or the ‘b’ branch.
Specific message contents
PACKET MEASUREMENT ORDER in step 2:
|
Global TFI |
TFI of the downlink TBF |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
010 (1.92 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in step 6:
|
Global TFI |
TFI of the downlink TBF |
|
IMMEDIATE_REL |
1 |
|
ARFCN, BSIC |
specified for cell B |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
100 (7.68 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE FAILURE in step 11a or 12b:
|
Packet Cell Change Failure message content: |
|
|
CAUSE |
0010 (Packet Access Reject on target cell) |
42.4.2.2.3 Cell change order procedure / Downlink transfer / Failure cases / Frequency not implemented
42.4.2.2.3.1 Conformance requirement
If the network message instructs the mobile station to use a frequency that it is not capable of using, the mobile station shall send a PACKET CELL CHANGE FAILURE message and remain on the current PDCH(s).
42.4.2.2.3.2 Test Purpose
To verify that the mobile station returns a PACKET CELL CHANGE FAILURE message if it is not capable of using the ordered frequency.
Reference
3GPP TS 04.60, subclause 8.4.2.
42.4.2.2.3.3 Method of test
Initial conditions
System Simulator:
1 cell, GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in idle mode.
Test procedure
MS is brought into downlink packet transfer mode. SS sends the PACKET CELL CHANGE ORDER message. The ordered frequency is not capable of using. The MS sends a PACKET CELL CHANGE FAILURE message to the network.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on the PCH, downlink TBF. |
|
2 |
SS->MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
3 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
4 |
SS->MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. Contains -BSIC + BCCH frequency -The network control order The frequency is not capable of using. |
|
5 |
SS->MS |
RLC data block |
Data block with polling. |
|
A6 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. Channel Request Description to establish UL-TBF in order to send Cell Update |
|
A7 |
SS->MS |
PACKET UPLINK ASSIGNMENT |
Sent on PACCH. |
|
A8 |
MS->SS |
PACKET CELL CHANGE FAILURE |
Sent on PACCH. Error cause: "Frequency not implemented". See specific message content. |
|
A9 |
MS->SS |
RLC data block |
LLC PDU implicitly indicating Cell Update |
|
A10 |
SS->MS |
PACKET UPLINK ACK/NACK |
Acknowledge the received RLC data block, Final Ack Indicator = ‘1 ‘, a valid RRBP. Send on PACCH. |
|
B6 |
MS->SS |
PACKET CELL CHANGE FAILURE |
Sent on PACCH. Error cause: "Frequency not implemented". See specific message content. |
Note: Branch A is performed only in case MS wants to do a Cell Update. Branch B is performed if MS does not do a Cell Update.
Specific message contents
PACKET CELL CHANGE FAILURE in step A8 and B6:
|
Packet Cell Change Failure message content: |
|
|
CAUSE |
0000 (Frequency not implemented) |
42.4.2.3 Cell change order procedure / Simultaneous uplink and downlink transfer
42.4.2.3.1 Cell change order procedure / Simultaneous uplink and downlink transfer / Normal case
42.4.2.3.1.1 Conformance requirement
The cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message to the mobile station on the PCCCH or PACCH. Upon receipt of the PACKET CELL CHANGE ORDER message the mobile station shall start timer T3174.
When a cell reselection is made controlled by the network, the mobile station shall act upon the IMMEDIATE_REL value which has been received in the Packet Cell Change Order: if required, the mobile station shall abort any TBF in progress by immediately ceasing to decode the downlink, ceasing to transmit on the uplink, stopping all RLC/MAC timers except for timers related to measurement reporting. The mobile station shall then switch to the identified specified new cell and shall obey the relevant RLC/MAC procedures on this new cell.
When cell reselection is controlled by the network, the mobile station in packet transfer mode shall act upon the IMMEDIATE_REL value: it may continue its operation in the old serving cell, as in mobile steered cell reselection, or it shall immediately abort its TBF if it is indicated by the IMMEDIATE_REL value.
Under no circumstances, operations in the old cell shall be continued more than 5 s after a cell reselection has been determined.
42.4.2.3.1.2 Test Purpose
To verify that when the cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message, the MS shall abort any TBF in progress and stop transmitting.
To verify that the MS shall switch to the new cell.
To verify that the MS shall act upon the IMMEDIATE_REL value.
Reference
3GPP TS 04.60, subclauses 5.5.1.1, 8.4 and 8.4.1.
42.4.2.3.1.3 Method of test
Initial conditions
System Simulator:
2 cells (cell A, cell B), activated at power-on, GPRS supported.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context 2 established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in simultaneous uplink and downlink packet transfer mode.
Test procedure
MS is brought into simultaneous uplink and downlink packet transfer mode. SS sends a PACKET CELL CHANGE ORDER message with IMMEDIATE_REL value set to 1 to force the mobile to release all ongoing TBFs. MS switches to the new cell and simultaneous uplink and downlink TBF is re-established.
SS sends a PACKET CELL CHANGE ORDER message with IMMEDIATE_REL value set to 0. The MS continues its operation in the old serving cell.
Maximum duration of the test
–
Expected sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
{ Uplink dynamic allocation one phase access with contention resolution } or {Uplink dynamic allocation two phase access} |
Macro parameters: 400: the number of RLC data block to be transferred, USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
2 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH, at earliest 3 block periods after contention resolution for the uplink TBF is completed. See specific message contents |
|
3 |
SS -> MS |
PACKET DOWNLINK ASSIGNMENT |
Sent on the PACCH. USF assigned to the MS in step 1 |
|
4 |
MS -> SS |
RLC data block |
MS sends data. |
|
5 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
Sent on PACCH, USF assigned to the MS in step 1 |
|
6a |
MS -> SS |
RLC data block |
MS sends data. |
|
6b |
MS->SS |
PACKET MEASUREMENT REPORT |
|
|
7 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
8 |
SS -> MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
9a |
MS -> SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
9b |
MS -> SS |
PACKET MEASUREMENT REPORT |
|
|
10 |
SS |
Repeat steps 5-9 until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message |
|
|
11 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. Contains –BSIC + BCCH frequency -The network control order-NC2 -USF IMMEDIATE_REL bit is set to 1. See specific message content. USF assigned to the MS in step 1 |
|
12 |
SS |
Check that no more than six data blocks are transmitted from the MS on old channel SS assigns USFs to the MS in PACKET DOWNLINK DUMMY CONTROL BLOCKS |
|
|
13 |
{ Uplink dynamic allocation one phase access with contention resolution } or {Uplink dynamic allocation two phase access} |
Macro parameters: USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
14 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS in step 13 |
|
15 |
MS->SS |
RLC data block |
MS sends data. The RLC data also serves as cell update. |
|
16 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
If the first received RLC Data Block in current TBF contain an empty LLC PDU, The SS shall accept Packet Resource Request from MS and respond with Packet Uplink Assignment. The USF shall be assigned once more to the MS.NOTE: The empty LLC PDU may be accompanied by another low priority RLC data block (with Packet Resource Request and Packet Uplink Assignment or Packet Timeslot Reconfigure as required), in order to ensure that the radio resources are used efficiently. |
|||
|
17 |
SS -> MS |
PACKET DOWNLINK ASSIGNMENT |
Sent on PACCH. On the new cell. |
|
18 |
SS -> MS |
10 RLC data block |
SS sends data, last block is polling. |
|
19a |
MS -> SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
19b |
MS -> SS |
PACKET MEASUREMENT REPORT |
|
|
20 |
SS->MS |
PACKET UPLINK ACK/NACK |
USF assigned to the MS in step 13 |
|
21a |
MS -> SS |
RLC data block |
MS sends data. |
|
21b |
MS->SS |
PACKET MEASUREMENT REPORT |
|
|
22 |
SS |
Repeat steps 18-21 until measurement results for cell A are included in the PACKET MEASUREMENT REPORT message |
|
|
23 |
SS -> MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. Contains –BSIC + BCCH frequency -The network control order – NC2 -USF IMMEDIATE_REL bit is not set. See specific message contents. USF assigned to the MS in step 13 |
|
24a |
MS -> SS |
RLC data block |
MS sends data. |
|
24b |
MS->SS |
PACKET MEASUREMENT REPORT |
|
|
25 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. USF assigned to the MS in step 13 |
|
26 |
Steps 24 and 25 are optional and can be repeated, but not more than 5 seconds. |
||
|
27 |
{ Uplink dynamic allocation one phase access with contention resolution } or {Uplink dynamic allocation two phase access} |
Macro parameters: USF_GRANULARITY: 1 RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 |
|
|
28 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS in step 27 |
|
The SS shall accept here or later in the sequence a Measurement Report sent by the MS due to expiry of T3158. The USF shall be assigned once more to the MS. |
|||
|
29 |
MS -> SS |
RLC data block |
MS sends data. The RLC data also serves as cell update. |
|
30 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
|
31 |
SS -> MS |
PACKET DOWNLINK ASSIGNMENT |
Sent on PACCH. On the new cell. |
|
32 |
SS -> MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
33 |
MS -> SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
34 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS in step 27 |
|
If the first received RLC Data Block in current TBF contain an empty LLC PDU, The SS shall accept Packet Resource Request from MS and respond with Packet Uplink Assignment or Packet Timeslot Reconfigure. The USF shall be assigned once more to the MS. NOTE: The empty LLC PDU may be accompanied by another low priority RLC data block (with Packet Resource Request and Packet Uplink Assignment or Packet Timeslot Reconfigure as required), in order to ensure that the radio resources are used efficiently. |
|||
|
35a |
MS -> SS |
RLC data block |
MS sends data. |
|
35b |
MS -> SS |
PACKET MEASUREMENT REPORT |
|
|
36 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH. |
Note: in step 6x, 9x, 19x, 21x, 24x and 35x, the MS shall perform either the ‘a’ branch or the ‘b’ branch.
Specific message contents
PACKET MEASUREMENT ORDER in step 2:
|
Global TFI |
TFI of the uplink TBF |
|
NC Measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
010 (1.92 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in Step 11:
|
Global TFI |
TFI of the uplink TBF |
|
IMMEDIATE_REL |
1 (Immediate abort of operation in the old cell is required.) |
|
ARFCN, BSIC |
Specified for cell B |
|
NC measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
011 (3.84 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
PACKET CELL CHANGE ORDER in Step 23:
|
Global TFI |
TFI of the uplink TBF |
|
IMMEDIATE_REL |
0 (No immediate abort of operation in the old cell is required) |
|
ARFCN, BSIC |
Specified for cell A |
|
NC measurement parameters |
|
|
NETWORK_CONTROL_ORDER |
10 (NC2) |
|
NC_REPORTING_PERIOD_I |
111 (61.44 sec) |
|
NC_REPORTING_PERIOD_T |
100 (7.68 sec) |
|
NC_FREQUENCY_LIST |
0 (not present) |
42.4.2.3.2 Void
42.4.2.3.3 Void
42.4.2.3.4 Packet Measurement order procedure / Downlink transfer / Normal case/ Routing Area Update/ NMO II
42.4.2.3.4.1 Conformance requirement
The cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message to the mobile station on the PCCCH or PACCH. Upon receipt of the PACKET CELL CHANGE ORDER message the mobile station shall start timer T3174.
When a cell reselection is made controlled by the network, the mobile station shall act upon the IMMEDIATE_REL value which has been received in the Packet Cell Change Order: if required, the mobile station shall abort any TBF in progress by immediately ceasing to decode the downlink, ceasing to transmit on the uplink, stopping all RLC/MAC timers except for timers related to measurement reporting. The mobile station shall then switch to the identified specified new cell and shall obey the relevant RLC/MAC procedures on this new cell.
To initiate the normal routing area updating procedure, the MS sends the message ROUTING AREA UPDATE REQUEST to the network, starts timer T3330 and changes to state GMM-ROUTING-AREA-UPDATING-INITIATED. The message ROUTING AREA UPDATE REQUEST shall contain the P-TMSI signature when received within a previous ATTACH ACCEPT or ROUTING AREA UPDATE ACCEPT message.
If the routing area updating request has been accepted by the network, a ROUTING AREA UPDATE ACCEPT message shall be sent to the MS. The network may assign a new P-TMSI and/or a new P-TMSI signature for the MS. If a new P-TMSI and/or P-TMSI signature have been assigned to the MS, it/they shall be included in the ROUTING AREA UPDATE ACCEPT message together with the routing area identification.
References
3GPP TS 04.60, subclauses 8.4 and 5.5.1.1.
3GPP TS 04.08 / 3GPP TS 24.008 subclause 4.7.5.1.
42.4.2.3.4.2 Test Purpose
To test the behaviour of the MS when the network triggers a Packet Cell Change Order to a cell belonging to another routing area, whereas the network mode of operation II is active, i.e.:
– To verify that the cell change order procedure is started when the MS receives a PACKET CELL CHANGE ORDER message.
– To verify that the MS switches to the new cell.
– To verify that the MS uses the established downlink TBF on the new cell.
– To verify that the MS performs the Normal Routing Area Update procedure.
42.4.2.3.4.3 Method of test
Initial conditions
System simulator:
2 cells, GPRS supported, Carrier 1 is active, at –60dBm. Carrier 2 is on, at low level –70dBm (in order to prevent sync reading suspension due to unsuccessful synchronization attempts). PBCCH is not present on Cell A (Carrier 1), and not present on Cell B (Carrier 2). NETWORK_CONTROL_ORDER is set to NC0, and Network Mode of Operation is set to NMO 2, on both Carrier 1 and Carrier 2. Cell A in MCC1/MNC1/LAC1/RAC1, cell B in MCC1/MNC1/LAC1/RAC2.
Mobile Station:
MS is in Packet Idle mode and GPRS attached.
PDP context established.
Specific PICS Statements
–
PIXIT Statements
–
Foreseen final state of the MS
– MS is in Transfer mode on carrier 2.
Test procedure
The MS is brought into downlink packet transfer mode on carrier 1 in Cell A. The SS sends a PACKET MEASUREMENT ORDER message, setting NETWORK_CONTROL_ORDER to NC2. The SS raises carrier 2 (Cell B) with higher RF signal strength than carrier 1. The MS shall stay camping in the cell A.
During the transfer, the SS sends a PACKET CELL CHANGE ORDER message. The MS shall reselect carrier 2, MS will send a ROUTING AREA UPDATE REQUEST message and SS establishes a new downlink TBF
The SS accepts the P-TMSI and returns ROUTING AREA UPDATE ACCEPT message without any P-TMSI. Further communication MS – SS is performed by the P-TMSI.
NOTE: After ROUTING AREA UPDATE COMPLTE on carrier 2 and during the UL TBF, T3158 may expire and thus PACKET MEASUREMENT REPORT is sent there. The SS shall be prepared for this.
Maximum duration of the test
4 minutes
Expected Sequence
|
Step |
Direction |
Message |
Comments |
|---|---|---|---|
|
1 |
MS |
The MS is GPRS attached and has activated a PDP context (see PICS) on carrier 1. |
|
|
2 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
sent on a PCH block corresponding to the MS’s paging group, including a packet downlink assignment Triggers the MS to monitor the assigned PDCH. |
|
3 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH of carrier 1 PMO message contains Network Control Order set to NC2 and NC_REPORTING_PERIOD_T set to 0.48s. |
|
The SS shall accept PACKET MEASUREMENT REPORT messages during the TBF, while the MS is in NC2 mode. |
|||
|
4 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
5 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
6 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
7 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
8 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
9a |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
9b |
MS->SS |
PACKET MEASUREMENT REPORT |
At NC_REPORTING_PERIOD_T expiry instead of PACKET DOWNLINK ACK/NACK, the MS sends the PACKET MEASUREMENT REPORT, which contains the "NC measurement report struct", on the PACCH. |
|
10 |
Repetition of steps 8 and 9 until Measurement for Cell B are included in PACKET MEASUREMENT REPORT message. |
||
|
11 |
SS |
Raise the carrier 2 level to -50dBm |
|
|
12 |
The MS still camps on carrier 1 and remains in Packet Transfer Check that no CHANNEL REQUEST is received on cell B. |
||
|
13 |
SS->MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. Contains –BSIC + BCCH frequency Network control order = NC2 |
|
14 |
MS->SS |
CHANNEL REQUEST |
To the new cell. |
|
15 |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH. Assigning a uplink TBF. |
|
16 |
MS -> SS |
ROUTING AREA UPDATE REQUEST |
Update type = ‘RA updating’ Routing area identity = RAI-1 |
|
17 |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on CCCH. On the new cell. Assigns a Downlink TBF. Addressing the MS with TLLI. |
|
18 |
SS -> MS |
ROUTING AREA UPDATE ACCEPT |
Update result = ‘RA updated’ Routing area identity = RAI-2 |
|
19a |
MS->SS |
CHANNEL REQUEST |
Received on RACH. |
|
19b |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH. Assigning a uplink TBF. |
|
20 |
MS -> SS |
ROUTING AREA UPDATE COMPLETE |
|
|
21a |
MS->SS |
CHANNEL REQUEST |
Received on RACH |
|
21b |
SS->MS |
IMMEDIATE ASSIGNMENT |
Sent on AGCH. Assigning a uplink TBF. |
|
21c |
MS->SS |
PACKET MEASUREMENT REPORT |
|
|
22 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on PCH. Addressing the MS with TLLI. |
|
23 |
SS->MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
24 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
NOTE: 9b is chosen depending at NC_REPORTING_PERIOD_T expiry, otherwise 9a is chosen.
Specific message contents
PACKET MEASUREMENT ORDER in step 3:
|
PACKET MEASUREMENT ORDER message content: |
|
|
NETWORK_CONTROL_ORDER |
0010 (NC2) |
|
NC_REPORTING_PERIOD_T |
000 (0.48s) |
42.4.2.3.5 Packet Measurement order procedure / Downlink transfer / Normal case/ Routing Area Update/ NMO I
42.4.2.3.5.1 Conformance requirement
The cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message to the mobile station on the PCCCH or PACCH. Upon receipt of the PACKET CELL CHANGE ORDER message the mobile station shall start timer T3174.
When a cell reselection is made controlled by the network, the mobile station shall act upon the IMMEDIATE_REL value which has been received in the Packet Cell Change Order: if required, the mobile station shall abort any TBF in progress by immediately ceasing to decode the downlink, ceasing to transmit on the uplink, stopping all RLC/MAC timers except for timers related to measurement reporting. The mobile station shall then switch to the identified specified new cell and shall obey the relevant RLC/MAC procedures on this new cell.
To initiate a combined routing area updating procedure the MS sends the message ROUTING AREA UPDATE REQUEST to the network, starts timer T3330 and changes to state GMM-ROUTING-UPDATING-INITIATED and MM LOCATION UPDATING PENDING. The value of the update type IE in the message shall indicate "combined RA/LA updating". If for the last attempt to update the registration of the location area a MM specific procedure was performed, the value of the update type IE in the ROUTING AREA UPDATE REQUEST message shall indicate "combined RA/LA updating with IMSI attach". Furthermore the MS shall include the TMSI status IE if no valid TMSI is available.
References
3GPP TS 04.60, subclauses 8.4 and 5.5.1.1.
3GPP TS 04.08 / 3GPP TS 24.008 subclause 4.7.5.2.
42.4.2.3.5.2 Test Purpose
To test the behaviour of the MS when the network triggers a Packet Cell Change Order to a cell belonging to another routing area, whereas the network mode of operation 1 is active, i.e.:
To verify that the cell change order procedure is started when the MS receives a PACKET CELL CHANGE ORDER message.
To verify that the MS switches to the new cell.
To verify that the MS uses the established downlink TBF on the new cell.
To verify that the MS performs the Combined Routing Area Update procedure.
42.4.2.3.5.3 Method of test
Initial conditions
System simulator:
2 cells, GPRS supported, Carrier 1 is active, at –60dBm. Carrier 2 is on, at low level –70dBm (in order to prevent sync reading suspension due to unsuccessful synchronization attempts). NETWORK_CONTROL_ORDER is set to NC0, and Network Mode of Operation is set to NMO I, on both Carrier 1 and Carrier 2. Cell A in MCC1/MNC1/LAC1/RAC1, cell B in MCC1/MNC1/LAC1/RAC2.
Mobile Station:
MS is in Packet Idle mode and GPRS attached (P-TMSI 1, P-TMSI signature 1). Ready timer deactivated.
PDP context established.
Specific PICS Statements
– MS operation mode A (TSPC_operation_mode_A)
– MS operation mode B (TSPC_operation_mode_B)
– MS operation mode C (TSPC_operation_mode_C)
PIXIT Statements
–
Foreseen final state of the MS
– MS is in Transfer mode on carrier 2.
Test procedure
The MS is brought into downlink packet transfer mode on carrier 1 in Cell A. The SS sends a PACKET MEASUREMENT ORDER message, setting NETWORK_CONTROL_ORDER to NC2. The SS raises carrier 2 (Cell B) with higher RF signal strength than carrier 1. The MS shall stay camping in the cell A.
During the transfer, the SS sends a PACKET CELL CHANGE ORDER message. The MS shall reselect carrier 2.
In Cell B, the MS sends a ROUTING AREA UPDATE REQUEST message. The SS accepts the P-TMSI signature and returns ROUTING AREA UPDATE ACCEPT message without any P-TMSI nor any new TMSI but Force to Standby set. Further communication MS-SS is performed by the old P-TMSI.
NOTE: during the UL TBF, T3158 may expire and thus PACKET MEASUREMENT REPORT is sent there. The SS shall be prepared for this.
Maximum duration of the test
4 minutes
Expected Sequence
|
Step |
Direction |
Message |
Comments |
|---|---|---|---|
|
1 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Triggers the MS to monitor the assigned PDCH, establish a downlink TBF. |
|
2 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH of carrier 1 PMO message contains Network Control Order set to NC2 and NC_REPORTING_PERIOD_T set to 0.96s. |
|
The SS shall accept PACKET MEASUREMENT REPORT messages during the TBF, while the MS is in NC2 mode. |
|||
|
3 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
4 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
5 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
6 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
7 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
8a |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
8b |
MS->SS |
PACKET MEASUREMENT REPORT |
At NC_REPORTING_PERIOD_T expiry instead of PACKET DOWNLINK ACK/NACK, the MS sends the PACKET MEASUREMENT REPORT, which contains the "NC measurement report struct", on the PACCH. |
|
9 |
Repeat steps 7 and 8 until measurement results for cell B are included in the PACKET MEASUREMENT REPORT message. |
||
|
10 |
SS |
Raise the carrier 2 level to -50dBm |
|
|
11 |
The MS still camps on carrier 1 and remains in Packet Transfer Check that no CHANNEL REQUEST is received on cell B. |
||
|
12 |
SS->MS |
PACKET CELL CHANGE ORDER |
Sent on the PACCH. Contains -BSIC + BCCH frequency Network control order = NC2 |
|
The following messages are to be sent and received in Cell B. |
|||
|
13 |
MS -> SS |
ROUTING AREA UPDATE REQUEST |
Update type = ‘Combined RA/LA updating’ (for operation mode A or operation mode B) Update type = ‘RA updating’ (for operation mode C) P-TMSI-1 signature Routing area identity = RAI1 |
|
14 |
SS -> MS |
ROUTING AREA UPDATE ACCEPT |
Update result = ‘Combined RA/LA updated’ (for operation mode A or operation mode B) Update result = ‘RA updated’ (for operation mode C) No P-TMSI No TMSI Routing area identity = RAI-2 Negotiated Ready Timer not included Force to standby IE set |
|
15 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Sent on PCH establish downlink TBF. On the new cell. Addressing the MS with TLLI derived from P-TMSI-1. Triggers the MS to monitor the assigned PDCH. |
|
16 |
SS->MS |
10 RLC data blocks |
SS sends data, last block is polling. |
|
17 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
Note: 8b is chosen depending on NC_REPORTING_PERIOD_T expiry, otherwise 8a is chosen.
Specific message contents
PACKET MEASUREMENT ORDER in step 2:
|
PACKET MEASUREMENT ORDER message content: |
|
|
NETWORK_CONTROL_ORDER |
0010 (NC2) |
|
NC_REPORTING_PERIOD_T |
001 (0.96s) |
42.4.2.3.6 MT CS establishment whilst in NC2 with a downlink TBF established
42.4.2.3.6.1 Conformance requirements
The behaviour of the mobile station is controlled by the NETWORK_CONTROL_ORDER parameter in a PACKET MEASUREMENT ORDER message. The reporting periods are indicated in the NC_REPORTING_PERIOD_T field of the PACKET MEASUREMENT ORDER message. The mobile station shall apply to the timer T3158 the NC_REPORTING_PERIOD_T when in packet transfer mode.
The procedure for NC measurement report sending shall be initiated by the mobile station at the expiry of the NC measurement report interval timer T3158. At expiry of the timer T3158 the mobile station shall restart the timer T3158, perform the measurements and send the PACKET MEASUREMENT REPORT message containing the ‘NC measurement report struct’ on PACCH.
Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. This kind of paging co-ordination shall be provided in network mode of operation I (see 3G TS 23.060). This kind of paging co-ordination may be provided also in network mode of operation II or III. This kind of paging co-ordination shall be provided if the network supports DTM.
When the mobile station responds to a paging request for RR connection establishment, it shall follow the paging response procedures as specified in 3GPP TS 04.18. For that purpose, a mobile station in packet transfer mode or a mobile station that has initiated a packet access procedure may abort any ongoing TBF or the packet access procedure in the following two cases:
– The mobile station requires that the BSS co-ordinates the allocation of radio resources for an RR connection and a simultaneous TBF (GPRS class A mode of operation by means of DTM).
References
3GPP TS 04.60/44.060, sub-clauses 6.1.3, 6.1.4.
3GPP TS 04.60, subclauses 5.6.1 and 8.3.
42.4.2.3.6.2 Test purpose
To verify that the MS sends the measurement report of the NC measurements according to the indicated reporting periods, when the T3158 expires. To verify that the MS reacts to CS paging on the PACCH, whilst the MS was in packet transfer mode and NC2, by releasing the downlink TBF and then establishing an RR connection.
42.4.2.3.6.3 Method of test
Initial Conditions
System Simulator:
2 cells, GPRS supported, NMO I activated, CTRL_ACK_TYPE=0 in SI13.
Mobile Station:
The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
– GPRS Release Supported (TSPC_MS_GPRS_RELEASE)
– Support of Immediate Connect (TSPC_AddInfo_ImmConn)
PIXIT Statements
–
Test Procedure
The MS is brought into packet transfer mode. SS sends a PACKET MEASUREMENT ORDER message. SS sends continuously data blocks and regularly polls so that PACKET MEASUREMENT REPORT messages are sent by the MS according to the indicated reporting period, before being paged on the PACCH. Upon receipt of the PACKET PAGING REQUEST message, the MS returns to packet idle mode and initiate the establishment of CS connection.
NOTE: carrier 2 is activated in order to prevent synchronisation reading suspension due to unsuccessful synchronization attempts.
Maximum Duration of Test
5 minutes
Expected Sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
MS |
The MS is GPRS attached and has activated a PDP context (see PICS) on carrier 1. |
|
|
2 |
SS -> MS |
IMMEDIATE ASSIGNMENT |
Triggers the MS to monitor the assigned PDCH with a valid RRBP. |
|
3 |
MS -> SS |
PACKET CONTROL ACK |
Sent in the block specified by RRBP field in step 2 as four access bursts |
|
4 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH of carrier 1 PMO message contains Network Control Order set to NC2 and NC_REPORTING_PERIOD_T set to 0.48s. |
|
5 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
6 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
7 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
8 |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
9 |
SS->MS |
12 RLC data blocks |
SS sends data, the last block contains a valid RRBP. |
|
10a |
MS->SS |
PACKET DOWNLINK ACK/NACK |
Sent on PACCH. |
|
10b |
MS->SS |
PACKET MEASUREMENT REPORT |
At NC_REPORTING_PERIOD_T expiry instead of PACKET DOWNLINK ACK/NACK, the MS sends the PACKET MEASUREMENT REPORT, which contains the "NC measurement report struct", on the PACCH. |
|
11 |
Repetition of steps 9 and 10 during 5s |
||
|
12 |
Raise carrier 2 changing the carrier level to –70dBm |
||
|
13 |
SS->MS |
PACKET PAGING REQUEST |
1st Repeated Page info contains IMSI of the MS, PAGE_MODE = " same as before ", sent on downlink PACCH. |
|
14 |
MS->SS |
CHANNEL REQUEST |
|
|
15 |
SS->MS |
IMMEDIATE ASSIGNMENT |
|
|
16 |
MS->SS |
PAGING RESPONSE |
|
|
17 |
MS -> SS |
CLASSMARK CHANGE |
This step may be optionally performed by a R97 or R98 MS; this step shall be mandatorily performed by R99 and later MS. |
|
18 |
MS -> SS |
GRPS SUSPENSION REQUEST |
|
|
19 |
SS -> MS |
AUTHENTICATION REQUEST |
|
|
20 |
MS -> SS |
AUTHENTICATION RESPONSE |
|
|
21 |
SS -> MS |
CIPHERING MODE COMMAND |
|
|
22 |
MS -> SS |
CIPHERING MODE COMPLETE |
|
|
23 |
SS->MS |
SETUP |
|
|
24 |
MS->SS |
CALL CONFIRMED |
|
|
If the MS supports immediate connect then branch A applies. If the MS does not support immediate connect then branch B applies |
|||
|
A25 |
MS->SS |
CONNECT |
Sent on the old channel |
|
A26 |
SS->MS |
ASSIGNMENT COMMAND |
Timeslot N (chosen arbitrarily) |
|
A27 |
MS->SS |
ASSIGNMENT COMPLETE |
Continues at step 31 |
|
B25 |
SS->MS |
ASSIGNMENT COMMAND |
Timeslot N (chosen arbitrarily) |
|
B26 |
MS->SS |
ASSIGNMENT COMPLETE |
Sent on the new channel |
|
B27 |
MS->SS |
ALERTING |
|
|
B28 |
MS |
An alerting indication is given by the MS |
|
|
B29 |
MS |
The MS is made to accept the call |
|
|
B30 |
MS->SS |
CONNECT |
|
|
31 |
SS->MS |
CONNECT ACKNOWLEDGE |
|
|
32 |
MS |
The appropriate bearer channel is through connected in both directions |
Specific Message Contents
None.
42.4.2.3.7 MT CS establishment whilst in NC2 with a uplink TBF established
42.4.2.3.7.1 Conformance requirements
The behaviour of the mobile station is controlled by the NETWORK_CONTROL_ORDER parameter in a PACKET MEASUREMENT ORDER message. The reporting periods are indicated in the NC_REPORTING_PERIOD_T field of the PACKET MEASUREMENT ORDER message. The mobile station shall apply to the timer T3158 the NC_REPORTING_PERIOD_T when in packet transfer mode.
The procedure for NC measurement report sending shall be initiated by the mobile station at the expiry of the NC measurement report interval timer T3158. At expiry of the timer T3158 the mobile station shall restart the timer T3158, perform the measurements and send the PACKET MEASUREMENT REPORT message containing the ‘NC measurement report struct’ on PACCH.
Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. This kind of paging co-ordination shall be provided in network mode of operation I (see 3G TS 23.060). This kind of paging co-ordination may be provided also in network mode of operation II or III. This kind of paging co-ordination shall be provided if the network supports DTM.
When the mobile station responds to a paging request for RR connection establishment, it shall follow the paging response procedures as specified in 3GPP TS 04.18. For that purpose, a mobile station in packet transfer mode or a mobile station that has initiated a packet access procedure may abort any ongoing TBF or the packet access procedure in the following two cases:
– The mobile station requires that the BSS co-ordinates the allocation of radio resources for an RR connection and a simultaneous TBF (GPRS class A mode of operation by means of DTM).
References
3GPP TS 04.60/44.060, sub-clauses 6.1.3, 6.1.4
3GPP TS 04.60, subclauses 5.6.1 and 8.3.
42.4.2.3.7.2 Test purpose
To verify that the MS sends packet measurement reports of the NC measurements according to the indicated reporting periods when T3158 expires. To verify that the MS reacts to CS paging on the PACCH, whilst the MS was in packet transfer mode and NC2, by releasing the uplink TBF and then establishing the RR connection.
42.4.2.3.7.3 Method of test
Initial Conditions
System Simulator:
2 cells, GPRS supported, NMO I activated.
Mobile Station:
The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 2activated.
NOTE: carrier 2 is activated in order to prevent synchronisation reading suspension due to unsuccessful synchronization attempts.
Specific PICS Statements
– GPRS Release Supported (TSPC_MS_GPRS_RELEASE)
– Support of Immediate Connect (TSPC_AddInfo_ImmConn)
Foreseen final state of the MS
– MS is in RR dedicated mode.
Test Procedure
The MS is brought into packet transfer mode. SS sends a PACKET MEASUREMENT ORDER message. MS sends continuously data blocks and PACKET MEASUREMENT REPORT messages according to the indicated reporting period, before being paged on the PACCH. Upon receipt of the PACKET PAGING REQUEST message, the MS returns to packet idle mode and initiates the establishment of a CS connection.
Maximum Duration of Test
10 minutes
Expected Sequence
|
Step |
Direction |
Message |
Comments |
|
1 |
{Uplink dynamic allocation two phase access} |
Macro parameters: n: 1000 octets USF_GRANULARITY: 1 block RLC_DATA_BLOCKS_GRANTED: absent (open-end) CHANNEL_CODING_COMMAND: CS-1 TLLI_BLOCK_CHANNEL_CODING: CS-1 TBF_STARTING_TIME: Without |
|
|
2 |
SS->MS |
PACKET MEASUREMENT ORDER |
Sent on PACCH of carrier 1 PMO message contains Network Control Order set to NC2 and NC_REPORTING_PERIOD_T set to 1.92s. |
|
3 |
SS->MS |
PACKET DOWNLINK DUMMY CONTROL BLOCK |
USF assigned to the MS |
|
4a |
MS -> SS |
RLC data block |
MS sends data |
|
4b |
MS -> SS |
PACKET MEASUREMENT REPORT |
– Sent on PACCH. – Contains the "NC measurement report struct" on PACCH |
|
5 |
SS -> MS |
PACKET UPLINK ACK/NACK |
Sent on PACCH |
|
6 |
Steps 4 to 6 are repeated until at least two PACKET MEASUREMENT REPORTs are received.. SS verifies that the time interval between two consecutive PACKET MEASUREMENT REPORTS is as per NC_REPORTING_PERIOD_T of PMO sent in Step 2. |
||
|
7 |
SS->MS |
PACKET PAGING REQUEST |
1st Repeated Page info contains IMSI of the MS PAGE_MODE = " same as before ", sent on downlink PACCH |
|
8 |
MS->SS |
CHANNEL REQUEST |
|
|
9 |
SS->MS |
IMMEDIATE ASSIGNMENT |
|
|
10 |
MS->SS |
PAGING RESPONSE |
|
|
11 |
MS -> SS |
CLASSMARK CHANGE |
This step may be optionally performed by a R97 or R98 MS; this step shall be mandatorily performed by a R99 or later MS |
|
12 |
MS -> SS |
GRPS SUSPENSION REQUEST |
|
|
13 |
SS -> MS |
AUTHENTICATION REQUEST |
|
|
14 |
MS -> SS |
AUTHENTICATION RESPONSE |
|
|
15 |
SS -> MS |
CIPHERING MODE COMMAND |
|
|
16 |
MS -> SS |
CIPHERING MODE COMPLETE |
|
|
17 |
SS->MS |
SETUP |
|
|
18 |
MS->SS |
CALL CONFIRMED |
|
|
If the MS supports immediate connect then branch c applies. If the MS does not support immediate connect then branch d applies |
|||
|
19c |
MS->SS |
CONNECT |
Sent on the old channel |
|
20c |
SS->MS |
ASSIGNMENT COMMAND |
Timeslot N (chosen arbitrarily). |
|
21c |
MS->SS |
ASSIGNMENT COMPLETE |
Sequence continues on step 25 |
|
19d |
SS->MS |
ASSIGNMENT COMMAND |
Timeslot N (chosen arbitrarily). |
|
20d |
MS->SS |
ASSIGNMENT COMPLETE |
Sent on the new channel |
|
21d |
MS->SS |
ALERTING |
|
|
22d |
MS |
An alerting indication as defined in a PICS/PIXIT statement is given by the MS |
|
|
23d |
MS |
The MS is made to accept the call in the way described in a PICS/PIXIT statement |
|
|
24d |
MS->SS |
CONNECT |
|
|
25 |
SS->MS |
CONNECT ACKNOWLEDGE |
|
|
26 |
MS |
The appropriate bearer channel is through connected in both directions. |
|
|
Note: in step 4x, the MS shall perform either the ‘a’ branch or the ‘b’ branch. |
|||
Specific Message Contents
None.