8.5 Power control in downlink

25.1023GPPRelease 17TSUser Equipment (UE) radio transmission and reception (TDD)

Power control in the downlink is the ability of the UE receiver to converge to the required link quality set by the network while using minimum downlink power.

8.5.1 Power control in downlink, constant BLER target

8.5.1.1 Minimum requirements 3.84 Mcps TDD option

For the parameters specified in Table 8.12 the downlink averaged over one timeslot shall be below the specified value in Table 8.13 more than 90% of the time. BLER shall be as shown in Table 8.13. Downlink power control is ON during the test.

Table 8.12: Test parameters for downlink power control – constant BLER Target (3.84 Mcps TDD option)

Parameter

Unit

Test 1

dB

0

dBm/3.84 MHz

-60

Information Data Rate

kbps

12.2

Target quality value on DTCH

BLER

0.01

Propagation condition

Case 1

DL Power Control step size, TPC

dB

1

Maximum_DL_power *

dB

0

Minimum_DL_power *

dB

-27

*Note: Refer to TS 25.224 for description and definition

Table 8.13: Requirements for downlink power control – constant BLER Target (3.84 Mcps TDD option)

Parameter

Unit

Test 1

dB

8.5

Measured quality on DTCH

BLER

0.01±30%

8.5.1.2 Minimum requirements 1.28 Mcps TDD option

For the parameters specified in Table 8.13A the downlink averaged over one timeslot, shall be below the specified value in Table 8.13B more than 90% of the time. BLER shall be as shown in table 8.13B. Downlink power control is ON during the test.

Table 8.13A: Test parameters for downlink power control – constant BLER Target (1.28 Mcps TDD option)

Parameter

Unit

Test 1

Test 2

Test 3

Test 4

Test 5

Test 6

dB

0

0

0

0

0

0

dBm/1.28 Mhz

-60

-60

-60

-60

-60

-60

Information data rate

kbps

12.2

12.2

64

64

64

64

Target quality on DTCH

BLER

0.01

0.01

0.1

0.1

0.001

0.001

Propagation condition

Case 1

Case 3

Case 1

Case 3

Case 1

Case 3

DL Power Control step size, TPC

dB

1

1

1

1

1

1

Maximum_DL_power *

dB

0

0

0

0

0

0

Minimum_DL_power *

dB

-27

-27

-27

-27

-27

-27

NOTE: Power is compared to P-CCPCH power

Table 8.13B: Requirements for downlink power control – constant BLER Target (1,28 Mcps TDD option)

Parameter

Unit

Test 1

Test 2

Test 3

Test 4

Test 5

Test 6

dB

7.5

4.8

9.1

8.9

17.9

13.1

Measured quality on DTCH

BLER

0.01±30%

0.01±30%

0.1±30%

0.1±30%

0.001±30%

0.001±30%

8.5.2 Power control in downlink, wind up effects

8.5.2.1 Minimum requirements 3.84 Mcps TDD option

Void

8.5.2.2 Minimum requirements 1.28 Mcps TDD option

This test is run in three stages where stage 1 is for convergence of the power control loop. In stage two the maximum downlink power for the dedicated channel is limited not to be higher than the value specified in Table 8.13C. All parameters used in the three stages are specified in Table 8.13C. The downlinkI Ior/Ioc power ratio measured values, which are averaged over one timeslot, during stage 3 shall be lower than the value specified in Table 8.13D more than 90% of the time.

Power control of the UE is ON during the test.

Table 8.13C: Test parameter for downlink power control, wind-up effects

Parameter

Unit

Test 1

Stage 1

Stage 2

Stage 3

Time in each stage

s

5

40

5

dBm/1.28 MHz

-60

Information Data Rate

kbps

12.2

Quality target on DTCH

BLER

0.01

Propagation condition

Case 1

Maximum_DL_Power

dB

0

P( Note 1)

0

Minimum_DL_Power

dB

-27

DL Power Control step size, TPC

dB

1

Note 1: P is the level corresponding to the average Ior/Ioc power ratio – 3 dB compared to the P-CCPCH level. The average Ioc/Ioc power ratio is measured during the initialisation stage after the power control loop has converged before the actual test starts.

Table 8.13D: Requirements in downlink power control, wind-up effects

Parameter

Unit

Test 1, stage 3

Ior/Ioc

dB

9.1

8.5.3 Power control in the downlink, initial convergence

This requirement verifies that DL power control works properly during the first seconds after DPCH connection is established

8.5.3.1 Minimum requirements 3.84 Mcps TDD option

Void

8.5.3.2 Minimum requirements 1.28 Mcps TDD option

For the parameters specified in Table 8.13E the downlink power ratio measured values, which are averaged over 50 ms, shall be within the range specified in Table 8.13F more than 90% of the time. T1 equals to 5 s and it starts 100 ms after the DPCH physical channel is considered established and the first uplink frame is transmitted. T2 equals to 5 s and it starts when T1 has expired. Power control is ON during the test.

The first 100 ms shall not be used for averaging, ie the first sample to be input to the averaging filter is at the beginning of T1. The averaging shall be performed with a sliding rectangular window averaging filter. The window size of the averaging filter is linearly increased from 0 up to 50 ms during the first 50 ms of T1, and then kept equal to 50ms.

Table 8.13E: Test parameters for downlink power control, initial convergence

Parameter

Unit

Test 1

Test 2

Test 3

Test 4

Target quality value on DTCH

BLER

0.01

0.01

0.1

0.1

Initial

dB

5

-15

9.4

-10.6

Information Data Rate

kbps

12.2

12.2

64

64

dBm/1.28 MHz

-60

Propagation condition

Static

Maximum_DL_Power

dB

0

Minimum_DL_Power

dB

-27

DL Power Control step size, TPC

dB

1

Table 8.13F: Requirements in downlink power control, initial convergence

Parameter

Unit

Test 1 and Test 2

Test 3 and Test 4

during T1

dB

-8.5   0

-4.1   4.4

during T2

dB

-8.5   -3

-4.1   1.4