6.1 Requirements of test equipment

36.5083GPPCommon test environments for User Equipment (UE) conformance testingEvolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC)Release 17TS

The requirements of test equipment specified in this subclause apply to Signalling test cases defined in TS 36.523-1 [18], in addition to the common requirements of test equipment specified in cause 4.2 of this specification.

Test equipment shall be able to simulate cells of Radio Access Technology (RAT) E-UTRA, UTRA, GSM or HRPD / 1xRTT. Regardless of respective RAT, the overall number and configuration of cells to be simulated simultaneously by test equipment shall not exceed the resources specified in the following Table 6.1-1:

Table 6.1-1: Maximum resources in terms of number / configuration of cells to be simulated simultaneously in a test setup

Simulation of

Max. number / configuration of cells
(SISO / SIMO)

Max. number / configuration of cells
(MIMO)

E-UTRA single-mode networks (FDD or TDD)

3x cells

n/a

E-UTRA dual-mode networks (FDD and TDD)

3x cells

n/a

E-UTRA networks involving Carrier Aggregation

4x cells

n/a

Mixed E-UTRA / UTRA networks

3x cells

n/a

Mixed E-UTRA / GSM networks

3x cells

n/a

Mixed E-UTRA / HRPD or 1xRTT networks

3x cells

n/a

Mixed E-UTRA / UTRA / GSM networks

3x cells

n/a

Note 1: No differentiation between cell configuration types (as defined in clause 6.3.3) here, because these types are relevant to specific test cases and their TTCN-3 implementation only.

Note 2: Only network scenarios specified in clause 4.4.1 and 6.3.2.1 have been covered.

Note 3: In case of Carrier Aggregation, each cell can act as a PCell, an SCell, or a standalone cell (not used as a CA component carrier). In Release 10 a maximum of 1 SCell can be aggregated with a PCell.

Note 4: Virtual Cells are not included in the maximum cell number as they do not require resources in the SS.

Exceptions to the requirements outlined above are possible but need special evidence to be provided explicitly in the test case prose and should be allowed only if the test case purpose cannot be met otherwise.

Test equipment shall be able to simulate one or more UEs with PC5 interface for sidelink direct communication and/or sidelink direct discovery or V2X sidelink communication.