A.8.1 FDD intra frequency measurements

25.1333GPPRelease 17Requirements for support of radio resource management (FDD)TS

A.8.1.1 Event triggered reporting in AWGN propagation conditions

A.8.1.1.1 Test Purpose and Environment

The purpose of this test is to verify that the UE makes correct reporting of an event. This test will partly verify the requirements in section 8.1.2 and 9.1.

The test parameters are given in Table A.8.1 and A.8.2 below. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A and 1B shall be used. The test consists of three successive time periods, with a time duration of T1, T2 and T3 respectively. During time duration T1, the UE shall not have any timing information of cell 2.

Table A.8.1: General test parameters for Event triggered reporting in AWGN propagation conditions

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cell

Cell 1

Reporting range

dB

3

Applicable for event 1A and 1B

Hysteresis

dB

0

W

1

Applicable for event 1A and 1B

Reporting deactivation threshold

0

Applicable for event 1A

Time to Trigger

ms

0

Filter coefficient

0

Monitored cell list size

24

T1

s

5

T2

s

5

T3

s

5

Table A.8.2: Cell specific test parameters for Event triggered reporting in AWGN propagation conditions

Parameter

Unit

Cell 1

Cell 2

T1

T2

T3

T1

T2

T3

CPICH_Ec/Ior

dB

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

SCH_Ec/Ior

dB

-12

-12

PICH_Ec/Ior

dB

-15

-15

DPCH_Ec/Ior

dB

Note 1

N/A

OCNS

Note 2

-0.941

dB

0

6.97

0

-Infinity

5.97

-Infinity

dBm/3,84 MHz

-70

CPICH_Ec/Io

dB

-13

-13

-13

-Infinity

-14

-Infinity

Propagation Condition

AWGN

NOTE 1: The DPCH level is controlled by the power control loop

NOTE 2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior .

A.8.1.1.2 Test Requirements

The UE shall send one Event 1A triggered measurement report, with a measurement reporting delay less than 800 ms from the beginning of time period T2.

The UE shall send one Event 1B triggered measurement report, with a measurement reporting delay less than 200 ms from the beginning of time period T3.

The UE shall not send event triggered measurement reports, as long as the reporting criteria are not fulfilled.

The rate of correct events observed during repeated tests shall be at least 90%.

NOTE: The actual overall delays measured in the test may be up to 2 x TTIUL DCCH higher than the measurement reporting delays above because of TTI insertion uncertainty of the measurement report in the UL DCCH.

A.8.1.2 Event triggered reporting of multiple neighbours in AWGN propagation condition

A.8.1.2.1 Test Purpose and Environment

The purpose of this test is to verify that the UE makes correct reporting of events. This test will partly verify the requirements in section 8.1.2 and 9.1.

The test parameters are given in Table A.8.3 and A.8.4. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A, 1C and 1B shall be used and the periodical reporting of the events is not applied. The test consists of four successive time periods, with a time duration of T1, T2, T3 and T4 respectively. In the initial condition before the time T1 only Cell1 is active.

Table A.8.3: General test parameters for Event triggered reporting of multiple neighbours in AWGN propagation conditions

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cell

Cell 1

Reporting range

dB

3

Applicable for event 1A and 1B

Hysteresis

dB

0

W

1

Applicable for event 1A and 1B

Replacement activation threshold

0

Applicable for event 1C

Reporting deactivation threshold

0

Applicable for event 1A

Time to Trigger

ms

0

Filter coefficient

0

Monitored cell list size

32

T1

S

10

T2

S

10

T3

S

5

T4

S

10

Table A.8.4: Cell specific test parameters for Event triggered reporting of multiple neighbours in AWGN propagation condition

Parameter

Unit

Cell 1

Cell 2

Cell3

T1

T2

T3

T4

T1

T2

T3

T4

T1

T2

T3

T4

CPICH_Ec/Ior

dB

-10

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

-12

SCH_Ec/Ior

dB

-12

-12

-12

PICH_Ec/Ior

dB

-15

-15

-15

DPCH_Ec/Ior

dB

Note 1

N/A

N/A

OCNS_Ec/Ior

dB

Note 2

-0.941

-0.941

dB

6.97

6.93

5.97

6.12

-Inf

9.43

6.97

7.62

5.97

6.93

-Inf

5.62

dBm/3,84 MHz

-85

CPICH_Ec/Io

dB

-13

-16

-14

-15.5

-Inf

-13.5

-13

-14

-14

-16

-Inf

-16

Propagation Condition

AWGN

NOTE 1: The DPCH level is controlled by the power control loop

NOTE 2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior .

A.8.1.2.2 Test Requirements

a) The UE shall send one Event 1A triggered measurement report for Cell3, with a measurement reporting delay less than 800 ms from the beginning of time period T1.

b) The UE may send one Event 1C triggered measurement report for Cell3 after the beginning of the time period T1.

c) The UE shall send one Event 1C triggered measurement report for Cell2, with a measurement reporting delay less than 800 ms from the beginning of time period T2.

d) The UE shall send one Event 1A triggered measurement report for Cell2, with a measurement reporting delay less than 800 ms from the beginning of time period T2.

e) The UE shall send one Event 1B triggered measurement report for Cell3, with a measurement reporting delay less than 200 ms from the beginning of time period T3.

f) The UE shall send one Event 1A triggered measurement report for Cell3, with a measurement reporting delay less than 200 ms from the beginning of time period T4.

g) The UE may send one Event 1C triggered measurement report for Cell2 after the beginning of the time period T4.

h) The UE may send one Event 1C triggered measurement report for Cell3 after the beginning of the time period T4.

i) The UE shall not send event triggered measurement reports, as long as the reporting criteria are not fulfilled.

The rate of correct events observed during repeated tests shall be at least 90%.

NOTE: The actual overall delays measured in the test may be up to 2 x TTIUL DCCH higher than the measurement reporting delays above because of TTI insertion uncertainty of the measurement report in the UL DCCH.

A.8.1.3 Event triggered reporting of two detectable neighbours in AWGN propagation condition

A.8.1.3.1 Test Purpose and Environment

The purpose of this test is to verify that the UE makes correct reporting of events. This test will partly verify the requirements in section 8.1.2 and 9.1.

The test parameters are given in Table A.8.5 and A.8.6. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A and 1B shall be used and the periodical reporting of the events is not applied. The test consists of four successive time periods, with a time duration of T1, T2, T3 and T4 respectively. In the initial condition before the time T1 only Cell1 is active.

Table A.8.5: General test parameters for Event triggered reporting of two detectable neighbours in AWGN propagation condition

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cell

Cell 1

Reporting range

dB

3

Applicable for event 1A and 1B

Hysteresis

dB

0

W

1

Applicable for event 1A and 1B

Reporting deactivation threshold

0

Applicable for event 1A

Time to Trigger

ms

0

Filter coefficient

0

Monitored cell list size

32

T1

s

10

T2

s

10

T3

s

10

T4

s

10

Table A.8.6: Cell specific test parameters for Event triggered reporting of two detectable neighbours in AWGN propagation condition

Parameter

Unit

Cell 1

Cell 2

Cell3

T1

T2

T3

T4

T1

T2

T3

T4

T1

T2

T3

T4

CPICH_Ec/Ior

dB

-10

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

-12

SCH_Ec/Ior

dB

-12

-12

-12

PICH_Ec/Ior

dB

-15

-15

-15

DPCH_Ec/Ior

dB

Note 1

N/A

N/A

OCNS_Ec/Ior

dB

Note 2

-0.941

-0.941

dB

14.55

28.51

14.45

28.51

-Inf

27.51

13.95

21.51

8.05

21.51

13.95

27.51

dBm/3,84 MHz

-85

CPICH_Ec/Io

dB

-11

-13

-14.5

-13

-Inf

-14.0

-15

-20

-17.5

-20

-15

-14

Propagation Condition

AWGN

NOTE 1: The DPCH level is controlled by the power control loop

NOTE 2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior

A.8.1.3.2 Test Requirements

a) The UE shall send one Event 1A triggered measurement report for Cell2, with a measurement reporting delay less than 800 ms from the beginning of time period T2.

b) The UE shall send one Event 1A triggered measurement report for Cell3, with a measurement reporting delay less than 200 ms from the beginning of time period T3.

c) The UE shall send one Event 1B triggered measurement report for Cell2, with a measurement reporting delay less than 200 ms from the beginning of time period T4.

d) The UE shall not send event triggered measurement reports, as long as the reporting criteria are not fulfilled.

The rate of correct events observed during repeated tests shall be at least 90%.

NOTE: The actual overall delays measured in the test may be up to 2 x TTIUL DCCH higher than the measurement reporting delays above because of TTI insertion uncertainty of the measurement report in the UL DCCH.

A.8.1.4 Correct reporting of neighbours in fading propagation condition

A.8.1.4.1 Test Purpose and Environment

The purpose of this test is to verify that the UE performs sufficient layer 1 filtering of the measurements, see section 9.1, which are the base for the event evaluation. The test is performed in fading propagation conditions. This test will partly verify the requirements in section 8.1.2.

The test parameters are given in Table A.8.7 and A.8.8.In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A and Event 1B shall be used. The test consists of two successive time periods, each with a time duration of T1 and T2 respectively.

The TTI of the uplink DCCH shall be 20ms.

Table A.8.7: General test parameters for correct reporting of neighbours in fading propagation condition

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cell

Cell 1

Reporting range

dB

0

Applicable for event 1A and 1B

Hysteresis

dB

0

W

1

Applicable for event 1A and 1B

Reporting deactivation threshold

0

Applicable for event 1A

Time to Trigger

ms

120

Filter coefficient

0

Monitored cell list size

24

Signalled before time T1.

T1

s

200

T2

s

201

Table A.8.8: Cell specific test parameters for correct reporting of neighbours in fading propagation condition

Parameter

Unit

Cell 1

Cell 2

T1

T2

T1

T2

CPICH_Ec/Ior

dB

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

SCH_Ec/Ior

dB

-12

-12

PICH_Ec/Ior

dB

-15

-15

DPCH_Ec/Ior

dB

Note 1

N/A

OCNS

Note 2

-0.941

dB

7.29

3.29

3.29

7.29

dBm/3,84 MHz

-70

CPICH_Ec/Io

dB

-12

-16

-16

-12

Propagation Condition

Case 5 as specified in Annex B of TS25.101

NOTE 1: The DPCH level is controlled by the power control loop

NOTE 2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior

A.8.1.4.2 Test Requirements

a) The number of received event 1A reports for Cell 2 during time period T1 shall be less than 60.

b) During the first 1 s of time period T2 no event reports shall be counted.

c) The number of received event 1B reports counted from 1s after the beginning of time period T2 until the end of time period T2 shall be less than 60.

A.8.1.5 Event triggered reporting of multiple neighbour cells in Case 1 fading condition

A.8.1.5.1 Test Purpose and Environment

The purpose of this test is to verify that the UE makes correct reporting of an event in Case1 fading propagation condition. This test will partly verify the requirements in section 8.1.2.

The test parameters are given in Table A.8.8A and A.8.8B below. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A shall be used and "CFN-SFN-Observed Time Difference" shall be reported. The test consists of two successive time periods, with time duration of T1 and T2, respectively. During time duration T1, the UE shall not have any timing information of invisible cells.

Table A.8.8A: General test parameters for event triggered reporting in multi-cell pedestrian environment

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cells

Cell2, Cell3, Cell4

Hysteresis

dB

0

Applicable for event 1A

Time to Trigger

ms

0

Applicable for event 1A

Filter coefficient

0

Applicable for event 1A

Reporting range R1a

dB

9

Applicable for event 1A

W

0

Applicable for event 1A

TriggeringCondition

activeSetAndMonitoredSetCells

Applicable for event 1A

Monitored cell list size

32

T1

s

5

T2

s

5

Table 8.8B: Cell specific test parameters for event triggered reporting in multi-cell pedestrian environment

Parameter

Unit

Cell 1

Cell 2

Cell 3

Cell 4

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

Channel 1

CPICH_Ec/Ior

dB

-10

-10

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

-12

-12

SCH_Ec/Ior

dB

-12

-12

-12

-12

PICH_Ec/Ior

dB

-15

-15

-15

-15

DPCH_Ec/Ior

dB

n.a.

Note 1

Note 1

Note 1

OCNS_Ec/Ior

dB

-0.941

Note 2

Note 2

Note 2

dB

-∞

1.3

4.3

1.3

4.3

1.3

1.3

4.3

dBm/3,84 MHz

‑70

Propagation Condition

Case 1 (3km/h)

CPICH_Ec/Io

dB

-∞

-17.6

-14.6

-17.6

-14.6

-17.6

-17.6

-14.6

dB

-∞

-20.0

-17.0

-20.0

-17.0

-20.0

-20.0

-17.0

NOTE 1: The DPCH level is controlled by the power control loop.

NOTE 2: The power of the OCNS channel that is added shall make the total power equal to Ior.

NOTE 3: CPICH_Ec/Io and SCH_Ec_maxpath/Io levels have been calculated from other parameters for information purposes. They are not settable themselves.

A.8.1.5.2 Test Requirements

The UE shall send one Event 1A triggered measurement report for Cell 1 with a measurement reporting delay less than 800 ms from the beginning of time period T2.

The rate of correct events observed during repeated tests shall be at least 90%.

NOTE: The actual overall delays measured in the test may be up to 2 x TTIUL DCCH higher than the measurement reporting delays above because of TTI insertion uncertainty of the measurement report in the UL DCCH.

A.8.1.6 Event triggered reporting of multiple neighbour cells in Case 3 fading condition

A.8.1.6.1 Test Purpose and Environment

The purpose of this test is to verify that the UE makes correct reporting of an event in Case3 fading propagation condition. This test will partly verify the requirements in section 8.1.2.

The test parameters are given in Table A.8.8C and A.8.8D below. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A and 1F shall be used and "CFN-SFN-Observed Time Difference" shall be reported. The test consists of two successive time periods, with time duration of T1 and T2 respectively. During time duration T1, the UE shall not have any timing information of invisible cells.

Table A.8.8C: General test parameters for event triggered reporting in multi-cell vehicular environment

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cells

Cell2, Cell3, Cell4

Hysteresis

dB

0

Applicable for event 1A

Time to Trigger

ms

0

Applicable for event 1A

Filter coefficient

0

Applicable for event 1A and event 1F

Reporting range R1a

dB

8

Applicable for event 1A

W

0

Applicable for event 1A

TriggeringCondition

activeSetAndMonitoredSetCells

Applicable for event 1A

Absolute threshold T1f

dB

20

Applicable for event 1F

Time to Trigger

ms

0

Applicable for event 1F

TriggeringCondition

activeSet

Applicable for event 1F

Monitored cell list size

32

T1

s

5

T2

s

5

Table 8.8D: Cell specific test parameters for event triggered reporting in multi-cell vehicular environment

Parameter

Unit

Cell 1

Cell 2

Cell 3

Cell 4

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

Channel 1

CPICH_Ec/Ior

dB

-10

-10

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

-12

-12

SCH_Ec/Ior

dB

-9.3

-9.3

-9.3

-9.3

PICH_Ec/Ior

dB

-15

-15

-15

-15

DPCH_Ec/Ior

dB

n.a.

Note 1

Note 1

Note 1

OCNS_Ec/Ior

dB

Note 2

Note 2

Note 2

Note 2

dB

-∞

1.1

3.6

4.6

3.6

4.6

6.6

-∞

dBm/3,84 MHz

-70

Propagation Condition

Case 3 (120km/h)

CPICH_Ec/Io

dB

-∞

-18.0

-16.5

-14.5

-16.5

-14.5

-13.5

-∞

dB

-∞

-20.0

-18.5

-16.5

18.5

-16.5

-15.5

-∞

NOTE 1: The DPCH level is controlled by the power control loop.

NOTE 2: The power of the OCNS channel that is added shall make the total power equal to Ior.

NOTE 3: CPICH_Ec/Io, SCH_Ec_maxpath/Io, and levels have been calculated from other parameters for information purposes. They are not settable themselves.

A.8.1.6.2 Test Requirements

The UE shall send an Event 1A triggered measurement report for Cell 1, with a measurement reporting delay less than 800 ms from the beginning of time period T2. The UE shall send an Event 1F triggered measurement report for Cell 4, with a measurement reporting delay less than 200 ms from the beginning of time period T2.

The rate of correct events 1A for Cell1 observed during repeated tests shall be at least 90%.

NOTE: The actual overall delays measured in the test may be up to 2 x TTIUL DCCH higher than the measurement reporting delays above because of TTI insertion uncertainty of the measurement report in the UL DCCH.

A.8.1.7 Event triggered reporting in AWGN propagation conditions

A.8.1.7.1 Test Purpose and Environment

The purpose of this test is to verify that the UE makes correct reporting of an event when UE DRX is active. This test will partly verify the requirements in section 8.1.2 and 9.1, and is applicable to all UE that support DRX in cell DCH state.

The test parameters are given in Table A.8.8A and A.8.8B below. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1A shall be used. The test consists of two successive time periods, with a time duration of T1and T2 respectively. During time duration T1, the UE shall not have any timing information of cell 2.

Table A.8.8A: General test parameters for Event triggered reporting in AWGN propagation conditions when UE DRX is active

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Active cell

Cell 1

Reporting range

dB

3

Applicable for event 1A

Hysteresis

dB

0

W

1

Applicable for event 1A

Reporting deactivation threshold

0

Applicable for event 1A

Time to Trigger

ms

0

Filter coefficient

0

Monitored cell list size

24

UE DRX cycle

sub-frames

20

Length of the UE DRX cycle.

Note: UE DRX cycle 1 is used.

Inactivity Threshold for UE DRX cycle 1

sub-frames

1

UE DRX Grant Monitoring

Boolean

FALSE

E-DCH TTI

ms

2

UE DTX cycle 1

sub-frames

20

UE DTX cycle 2

sub-frames

20

CQI DTX Timer

sub-frames

4

UE DPCCH burst 1

sub-frames

2

UE DPCCH burst 2

sub-frames

2

Inactivity Threshold for UE DTX cycle 2

Number of E-DCH TTIs

1

UE DTX long preamble length

Number of slots

2

Note: Mandatory Default value is used.

MAC Inactivity Threshold

Number of E-DCH TTIs

Infinity

Uplink DPCCH slot format

1

T1

s

5

T2

s

5

Table A.8.8B: Cell specific test parameters for Event triggered reporting in AWGN propagation conditions when UE DRX is active.

Parameter

Unit

Cell 1

Cell 2

T1

T2

T1

T2

CPICH_Ec/Ior

dB

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

SCH_Ec/Ior

dB

-12

-12

PICH_Ec/Ior

dB

-15

-15

DPCH_Ec/Ior

dB

Note 1

N/A

HS-PDSCH_Ec/Ior

dB

-10

N/A

HS-SCCH-1_Ec/Ior

dB

-13

N/A

OCNS

Note 2

-0.941

dB

0

6.97

-Infinity

5.97

dBm/3,84 MHz

-70

CPICH_Ec/Io

dB

-13

-13

-Infinity

-14

Propagation Condition

AWGN

NOTE 1: The DPCH level is controlled by the power control loop

NOTE 2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior .

NOTE 3: The UE under test is not continuously scheduled, and shall not be configured to continuously transmit data, to enable it to use DRX and DTX.

A.8.1.7.2 Test Requirements

The UE shall send one Event 1A triggered measurement report, with a measurement reporting delay less than 1.5 s from the beginning of time period T2.

The UE shall not send event triggered measurement reports, as long as the reporting criteria are not fulfilled.

The rate of correct events observed during repeated tests shall be at least 90%.

NOTE: The actual overall delays measured in the test may be up to 2 x TTIUL DCCH higher than the measurement reporting delays above because of TTI insertion uncertainty of the measurement report in the UL DCCH.