A.5.8 Serving HS-DSCH cell change

25.1333GPPRelease 17Requirements for support of radio resource management (FDD)TS

A.5.8.1 Test Purpose and Environment

The purpose of this test is to verify the requirement for the delay when performing the serving HS-DSCH cell change in CELL_DCH state specified in section 5.10.

The test parameters are given in Table A.5.13 and A.5.14 below. The test consists of 4 successive time periods, with a time duration of T1, T2, T3 and T4 respectively. At the start of time duration T1 the UE have cell 1 and cell 2 in active set and cell 1 as the serving HS-DSCH cell.

Data shall be transmitted continuously to the UE on the HS-DSCH channel.

Table A.5.13: General test parameters for serving HS-DSCH cell change

Parameter

Unit

Value

Comment

DCH parameters

DL Reference Measurement Channel 12.2 kbps

As specified in TS 25.101 section A.3.1

Power Control

On

Target quality value on DTCH

BLER

0.001

HSDPA parameters

Fixed Reference Channel Definition H-Set 1, with QPSK modulation only

As specified in TS 25.101 section A.7.1.1

Initial conditions

Active cells

Cell 1 and Cell 2

Serving HS-DSCH cell

Cell 1

Final condition

Active cell

Cell 1 and Cell 2

Serving HS-DSCH cell

Cell 2

Hysteresis

dB

0

Time to Trigger

ms

0

Filter coefficient

0

CQI Feedback cycle, k

ms

2

CQI repetition factor

1

T1

s

5

T2

s

3

T3

s

0.5

T4

ms

100

Table A.5.14: Cell specific test parameters for serving HS-DSCH cell change

Parameter

Unit

Cell 1

Cell 2

T1

T2

T3

T4

T1

T2

T3

T4

UTRA RF Channel Number

Channel 1

Channel 1

CPICH_Ec/Ior

dB

-10

-10

PCCPCH_Ec/Ior

dB

-12

-12

SCH_Ec/Ior

dB

-12

-12

PICH_Ec/Ior

dB

-15

-15

DPCH_Ec/Ior

dB

Note 1

Note 1

Note 1

N/A

N/A

N/A

Note 3

Note 1

HS-PDSCH_Ec/Ior

dB

-10

-inf

-inf

-10

HS-SCCH-1_ Ec/Ior

dB

-13

-inf

-inf

-13

OCNS

Note 2

Note 2

Note 2

Note 2

Note 2

Note 2

Note 2

Note 2

dB

3.64

1.14

1.14

3.64

dBm/
3,84 MHz

-70

CPICH_Ec/Io

dB

-13

-15.5

-15.5

-13

Propagation Condition

AWGN

Relative delay of paths received from cell 2 with respect to cell 1

Chips

{-148 … 148}

Note 4

Note 1: The DPCH level is controlled by the power control loop

Note 2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior

Note 3: The DPCH level is controlled by the power control loop. The initial power shall be set equal to the DPCH_Ec/Ior of Cell 1 at the end of T2.

Note 4: The relative delay of the path from cell 2 with respect to cell 1 shall always be within ±148 chip.

A.5.8.1.1 Test procedure

1) The test is started at the beginning of T1.

2) During time period T2 an Event 1D triggered measurement report shall be sent by the UE.

3) During time period T3 UTRAN shall send a Physical Channel Configuration command with activation time now changing serving HS-DSCH from cell 1 to cell 2. The Physical Channel Configuration message shall be sent to the UE so that the whole message is available at the UE at the beginning of T4.

A.5.8.2 Test Requirements

The UE shall start to transmit the CQI to cell 2 less than 74 ms from the beginning of time period T4.

The UE shall also start to receive the first HS-SCCH message from cell 2 less than 74 ms from the beginning of time period T4 and transmit the ACK or NAK which corresponds to the HS-SCCH message.

NOTE: The delay Dcell_change equals the RRC procedure delay defined in TS25.331 Section 13.5.2 plus the interruption time of receiving HS-DSCH data stated in section 5.10.2.2.
The RRC procedure delay is 50 ms and the interruption time is given by Tinterrupt1=TIU+22 ms=24 ms.

The total delay Dcell_change=50 + 24 ms = 74 ms.