8.7.22 EN-DC Resource Status Reporting

36.4233GPPEvolved Universal Terrestrial Radio Access Network (E-UTRAN)Release 17TSX2 Application Protocol (X2AP)

8.7.22.1 General

This procedure is initiated by the en-gNB or by the eNB to report the result of measurements admitted by the en-gNB or by the eNB following a successful EN-DC Resource Status Reporting Initiation procedure.

The procedure uses non UE-associated signalling.

8.7.22.2 Successful Operation

Figure 8.7.22.2-1: EN-DC Resource Status Reporting, successful operation – en-gNB-initiated

Figure 8.7.22.2-2: EN-DC Resource Status Reporting, successful operation – eNB-initiated

The en-gNB or the eNB shall report the results of the admitted measurements in the EN-DC RESOURCE STATUS UPDATE message. The admitted measurements are the measurements that were successfully initiated during the preceding EN-DC Resource Status Reporting Initiation procedure.

8.7.22.3 Unsuccessful Operation

Not applicable.

8.7.22.4 Abnormal Conditions

Void.