H.2 Statistical testing of receiver characteristics

38.521-23GPPNRPart 2: Range 2 StandaloneRadio transmission and receptionRelease 17TSUser Equipment (UE) conformance specification

H.2.1 General

The test of receiver characteristics is twofold.

1. A signal or a combination of signals is offered to the RX port(s) of the receiver.

2. The ability of the receiver to demodulate /decode this signal is verified by measuring the throughput.

In (2) is the statistical aspect of the test and is treated here.

The minimum requirement for all receiver tests is >95% of the maximum throughput.

All receiver tests are performed in static propagation conditions. No fading conditions are applied.

H.2.2 Mapping throughput to error ratio

a) The measured information bit throughput R is defined as the sum (in kilobits) of the information bit payloads successfully received during the test interval, divided by the duration of the test interval (in seconds).

b) In measurement practice the UE indicates successfully received information bit payload by signalling an ACK to the SS.
If payload is received, but damaged and cannot be decoded, the UE signals a NACK.

c) Only the ACK and NACK signals, not the data bits received, are accessible to the SS.
The number of bits is known in the SS from knowledge of what payload was sent.

d) For the reference measurement channel, applied for testing, the number of bits is different in different slots, however in a radio frame it is fixed during one test.

e) The time in the measurement interval is composed of successfully received slots (ACK), unsuccessfully received slots (NACK) and no reception at all (DTX-slots).

f) DTX-slots may occur regularly according the applicable reference measurement channel (regDTX).
In real live networks this is the time when other UEs are served. In TDD these are the UL and special slots.
regDTX vary from test to test but are fixed within the test.

g) Additional DTX-slots occur statistically when the UE is not responding ACK or NACK where it should. (statDTX)
This may happen when the UE was not expecting data or decided that the data were not intended for it.

The pass / fail decision is done by observing the:

– number of NACKs

– number of ACKs and

– number of statDTXs (regDTX is implicitly known to the SS)

The ratio (NACK + statDTX)/(NACK+ statDTX + ACK)is the Error Ratio (ER). Taking into account the time consumed by the ACK, NACK, and DTX-TTIs (regular and statistical), ER can be mapped unambiguously to throughput for any single reference measurement channel test.

H.2.3 Design of the test

The test is defined by the following design principles (see clause H.x, Theory….):

1. The early decision concept is applied.

2. A second limit is introduced: Bad DUT factor M>1

3. To decide the test pass:

Supplier risk is applied based on the Bad DUT quality

To decide the test fail

Customer Risk is applied based on the specified DUT quality

The test is defined by the following parameters:

1. Limit ER = 0.05 (Throughput limit = 95%)

2. Bad DUT factor M=1.5 (selectivity)

3. Confidence level CL = 95% (for specified DUT and Bad DUT-quality)

H.2.4 Numerical definition of the pass fail limits

Table H.2.4-1: pass fail limits

ne

nsp

nsf

ne

nsp

nsf

ne

nsp

nsf

ne

nsp

nsf

0

67

NA

39

763

500

78

1366

1148

117

1951

1828

1

95

NA

40

778

516

79

1381

1166

118

1965

1845

2

119

NA

41

794

532

80

1396

1183

119

1980

1863

3

141

NA

42

810

548

81

1412

1200

120

1995

1881

4

162

NA

43

826

564

82

1427

1217

121

2010

1899

5

183

NA

44

842

580

83

1442

1234

122

2025

1916

6

202

NA

45

858

596

84

1457

1252

123

2039

1934

7

222

NA

46

873

612

85

1472

1269

124

2054

1952

8

241

NA

47

889

629

86

1487

1286

125

2069

1969

9

259

NA

48

905

645

87

1502

1303

126

2084

1987

10

278

76

49

920

661

88

1517

1321

127

2099

2005

11

296

88

50

936

678

89

1532

1338

128

2113

2023

12

314

100

51

952

694

90

1547

1355

129

2128

2040

13

332

113

52

967

711

91

1562

1373

130

2143

2058

14

349

126

53

983

727

92

1577

1390

131

2158

2076

15

367

140

54

998

744

93

1592

1407

132

2172

2094

16

384

153

55

1014

760

94

1607

1425

133

2187

2111

17

401

167

56

1029

777

95

1623

1442

134

2202

2129

18

418

181

57

1045

793

96

1637

1459

135

2217

2147

19

435

195

58

1060

810

97

1652

1477

136

2231

2165

20

452

209

59

1076

827

98

1667

1494

137

2246

2183

21

469

224

60

1091

844

99

1682

1512

138

2261

2201

22

486

238

61

1106

860

100

1697

1529

139

2275

2218

23

503

253

62

1122

877

101

1712

1547

140

2290

2236

24

519

268

63

1137

894

102

1727

1564

141

2305

2254

25

536

283

64

1153

911

103

1742

1582

142

2320

2272

26

552

298

65

1168

928

104

1757

1599

143

2334

2290

27

569

313

66

1183

944

105

1772

1617

144

2349

2308

28

585

328

67

1199

961

106

1787

1634

145

2364

2326

29

602

343

68

1214

978

107

1802

1652

146

2378

2344

30

618

359

69

1229

995

108

1817

1669

147

2393

2361

31

634

374

70

1244

1012

109

1832

1687

148

2408

2379

32

650

389

71

1260

1029

110

1847

1704

149

2422

2397

33

667

405

72

1275

1046

111

1861

1722

150

2437

2415

34

683

421

73

1290

1063

112

1876

1740

151

2452

2433

35

699

436

74

1305

1080

113

1891

1757

152

2466

2451

36

715

452

75

1321

1097

114

1906

1775

153*)

NA

2469

37

731

468

76

1336

1114

115

1921

1793

 

 

 

38

747

484

77

1351

1131

116

1936

1810

*) note 2 in H.2.5

NOTE 1: The first column is the number of errors (ne = number of NACK + statDTX)

NOTE 2: The second column is the number of samples for the pass limit (nsp, ns=Number of Samples= number of NACK + statDTX + ACK)

NOTE 3: The third column is the number of samples for the fail limit (nsf)

H.2.5 Pass fail decision rules

The pass fail decision rules apply for a single test, comprising one component in the test vector. The overall Pass /Fail conditions are defined in clause H.2.6and H.2A.6

Having observed 0 errors, pass the test at 67+ samples, otherwise continue

Having observed 1 error, pass the test at 95+ otherwise continue

Having observed 2 errors, pass the test at 119+ samples, fail the test at 2- samples, otherwise continue

Etc. etc.

Having observed 151 errors, pass the test at 2452+ samples, fail the test at 2433- samples, otherwise continue

Having observed 152 errors, pass the test at 2466+ samples, fail the test at 2451- samples.

Where x+ means: x or more, x- means x or less

NOTE 1: an ideal DUT passes after 67 samples. The maximum test time is 2466 samples.

NOTE 2: It is allowed to deviate from the early decision concept by postponing the decision (pass/fail or continue). Postponing the decision to or beyond the end of Table H.2.4-1 requires a pass fail decision against the test limit: pass the DUT for ER<0.0618, otherwise fail.

Annex I:Void

Annex J (normative):
Test applicability per permitted test method

This annex describes, per test requirement, the permitted test methodologies as a function of DUT antenna configuration.

Table J-1: Test metric applicability per permitted test method

Test Metric

No DUT antenna configuration declaration

DUT antenna configuration declaration

Configuration 1

(one antenna panel with D ≤ 5 cm active at any one time)

Configuration 2

(More than one antenna panel D ≤ 5 cm without phase coherency between panels active at any one time)

Configuration 3

(Any phase coherent antenna panel of any size)

EIRP, TRP

IFF, Enhanced IFF, DFF+IFF (Note 1)

DFF, DFF simplification, IFF, Enhanced IFF, DFF+IFF (Note 2), NFTF

DFF, DFF simplification, IFF, Enhanced IFF, DFF+IFF (Note 2), NFTF

IFF, Enhanced IFF, DFF+IFF (Note 1)

EIS, Frequency Error, EVM, Carrier Leakage, In-Band Emission, EVM SF, OBW

IFF, Enhanced IFF, DFF+IFF (Note 1)

DFF, DFF simplification, IFF, Enhanced IFF, DFF+IFF (Note 2)

DFF, DFF simplification, IFF, Enhanced IFF, DFF+IFF (Note 2)

IFF, Enhanced IFF, DFF+IFF (Note 1)

NOTE: D = DUT radiating aperture declared by UE vendor.

Note 1: Only the IFF probe(s) are applicable

Note 2: Either DFF or IFF probe(s) are applicable

Annex K (normative):
EIRP, TRP, and EIS measurement procedures

Annex K defines the EIRP, TRP, and EIS measurement procedures which includes Tx and Rx beam peak direction search, spherical coverage procedures and TRP procedures for the permitted testing methodologies defined in [5].

The default value for BEAM_SELECT_WAIT_TIME = 3 sec for all applicable Tx and Rx test cases. The BEAM_SELECT_WAIT_TIME represents a default minimum wait time period required to complete beam selection process at a single position before start of measurement. For a particular EUT, if it is known/determined that a lower wait time than default value is enough to complete beam selection process, then such a lower value may be used by the Test system to achieve test time optimization.