4.9.4 Test procedure to check that UE is in state 5GC RRC_IDLE on a certain NR/NGC cell
38.508-13GPP5GSPart 1: Common test environmentRelease 17TSUser Equipment (UE) conformance specification
4.9.4.1 Scope
This procedure aims at checking whether the UE is in state 5GC RRC_IDLE on a certain cell (as specified in the test case).
4.9.4.2 Procedure description
4.9.4.2.1 Initial conditions
As specified in the TC which calls the procedure in its entirety or refers to parts of it.
4.9.4.2.2 Procedure
Table 4.9.4.2.2-1: Test procedure sequence
St |
Procedure |
Message Sequence |
TP |
Verdict |
|
U – S |
Message/PDU/SDU |
||||
1 |
Step 1 of Generic procedure for bringing the UE in RRC_CONNECTED state with connectivity NR as specified in Table 4.5.4.2-3 is performed. |
– |
– |
– |
– |
2 |
Check: Does the UE transmit an RRCSetupRequest message on the cell specified in the test case? |
–> |
NR RRC: RRCSetupRequest |
– |
P |
3-8 |
Steps 3-8 of Generic procedure for bringing the UE in RRC_CONNECTED state with connectivity NR as specified in Table 4.5.4.2-3 are performed. |
– |
– |
– |
– |
– |
EXCEPTION: Step 9a1 describes a step sequence depending on procedure parameters; the "lower case letter" identifies a step sequence that take place if a procedure parameter has a particular value |
– |
– |
– |
– |
9a1 |
IF ‘connected without release‘ is not present THEN the SS transmits an RRCRelease message to release RRC connection and move the UE to RRC_IDLE. |
<– |
NR RRC: RRCRelease |
– |
– |
4.9.4.2.3 Specific Message content
As specified in the TC which calls the procedure in its entirety or refers to parts of it.