F.2 Multi-carrier BS of different E-UTRA channel bandwidths
36.1043GPPBase Station (BS) radio transmission and receptionEvolved Universal Terrestrial Radio Access (E-UTRA)Release 18TS
For a multi-carrier E-UTRA BS transmitting a group of carriers of different channel bandwidths, the channel bandwidth of the outermost carriers (≥5 MHz) should be considered for ACLR and Operating band unwanted emission requirements. That is, the corresponding requirements for the channel bandwidth of each of the outermost carriers should be applied at the respective side of the group of transmitted carriers.