9.2.5 Minimum requirement PUCCH 1-1 (when csi-SubframeSet –r12 and EIMTA-MainConfigServCell-r12 are configured)

36.1013GPPEvolved Universal Terrestrial Radio Access (E-UTRA)Release 18TSUser Equipment (UE) radio transmission and reception

The following requirements apply to UE Category ≥2 which supports eIMTA TDD UL-DL reconfiguration for TDD serving cell(s) via monitoring PDCCH with eIMTA-RNTI and Rel-12 CSI subframe sets. For the parameters specified in table 9.2.5-1, and using the downlink physical channels specified in Tables C.3.2-1 and C.3.2-2, for each CSI subframe set, the reported CQI value shall be in the range of ±1 of the reported median more than 90% of the time. For each CSI subframe set, if the PDSCH BLER using the transport format indicated by median CQI is less than or equal to 0.1, the BLER using the transport format indicated by the (median CQI + 1) shall be greater than 0.1. If the PDSCH BLER using the transport format indicated by the median CQI is greater than 0.1, the BLER using transport format indicated by (median CQI – 1) shall be less than or equal to 0.1. The difference of the median CQI obtained by reports in CSI subframe sets CCSI,0 and the median CQI obtained by reports in CSI subframe sets CCSI,1 shall be larger than or equal to 3.

Table 9.2.5-1: PUCCH 1-1 static test (TDD)

Parameter

Unit

Test

Bandwidth

MHz

10

PDSCH transmission mode

9

Uplink downlink configuration in SIB1

0

Downlink HARQ reference configuration (eimta-HarqReferenceConfig-r12) (Note 4)

2

Set of dynamic TDD UL-DL configurations (Notes 4,5)

{0, 2}

Periodicity of monitoring the L1 reconfiguration DCI (eimta-CommandPeriodicity-r12)

ms

10

Set of subframes to monitor the L1 reconfiguration DCI (eimta-CommandSubframeSet-r12)

SF#5

CSI-MeasSubframeSet-r12

0001100011

Special subframe configuration

4

Downlink power allocation

dB

0

dB

0

dB

0

σ

dB

-3

CRS reference signals

Antenna ports 0, 1

CSI reference signals

Antenna ports 15,16

CSI-RS periodicity and subframe offset

TCSI-RS / CSI-RS

5/4

CSI reference signal configuration

4

Zero-Power CSI-RS configuration 0

ICSI-RS / ZeroPowerCSI-RS bitmap

0 /

0000010000000000

Zero-Power CSI-RS configuration 1

ICSI-RS / ZeroPowerCSI-RS bitmap

4 /

0100000000000000

Propagation condition and antenna configuration

Clause B.1 (2 x 2)

Beamforming Model

As specified in Section B.4.3

CodeBookSubsetRestriction bitmap

‘000001’

SNR in CSI subframe set 0

dB

0

1

SNR in CSI subframe set 1

dB

10

11

dB[mW/15kHz]

-98

-97

for CSI subframe set 0

dB[mW/15kHz]

-98

-98

for CSI subframe set 1

dB[mW/15kHz]

-108

-108

PDSCH scheduled subframes for CSI subframe set 0

0,5

PDSCH scheduled subframes for CSI subframe set 1

3,4,8,9

Max number of HARQ transmissions

1

Physical channel for CQI/PMI reporting

PUSCH (Note 6)

PUCCH Report Type for CQI/second PMI

2b

Physical channel for RI reporting

PUSCH

PUCCH Report Type for RI/ first PMI

5

Reporting periodicity

ms

Npd = 10 for each Rel-12 CSI subframe set

CQI delay

ms

14 for CSI subframe set 0

12 for CSI subframe set 1

cqi-pmi-ConfigurationIndex

8 for set 0

13 for set 1

ri-ConfigIndex

805 for both set 0 and set 1 (Note 7)

ACK/NACK feedback mode

Multiplexing

Note 1: Reference measurement channel RC.19 TDD according to Table A.4-1 with one sided dynamic OCNG Pattern OP.1 TDD and dynamic OCNG Pattern with multiple non-contiguous blocks OP.7 TDD as described in Annex A.5.2.1/7 for CSI subframe set 0.

Note 2: Reference measurement channel RC.20 TDD according to Table A.4-1 with one sided dynamic OCNG Pattern OP.1 TDD as described in Annex A.5.2.1 for CSI subframe set 1.

Note 3: In the test, the minimum requirements shall be fulfilled for at least one of the two SNR(s) and the respective wanted signal input level for each CSI subframe set separately.

Note 4: As specified in Table 4.2-2 in TS 36.211.

Note 5: UL/DL configuration in PDCCH with eIMTA-RNTI is cyclically selected from the given set on a per-DCI basis.

Note 6: To avoid collisions between CQI/PMI reports and HARQ-ACK it is necessary to report both on PUSCH instead of PUCCH. PDCCH DCI format 0 shall be transmitted in downlink SF#1 and #6 to allow periodic CQI/PMI to multiplex with the HARQ-ACK on PUSCH in uplink SF#7 and #2. CQI/PMI reports for CSI subframe set 0 is transmitted in SF#2 and CQI/PMI reports for CSI subframe set 1 is transmitted in SF#7.

Note 7: RI reporting interval is set to the maximum allowable length of 160ms to minimise collisions between RI, CQI/PMI and HARQ-ACK reports. In the case when all three reports collide, it is expected that CQI/PMI reports will be dropped, while RI and HARQ-ACK will be multiplexed. At eNB, CQI report collection shall be skipped every 160ms during performance verification.