10.2.6 CELL CHANGE ORDER FROM UTRAN FAILURE

25.3313GPPProtocol specificationRadio Resource Control (RRC)Release 17TS

This message is sent on the RRC connection used before the Cell change order from UTRAN was executed. The message indicates that the UE has failed to seize the new channel in the other radio access technology.

RLC-SAP: AM

Logical channel: DCCH

Direction: UEUTRAN

Information Element/Group name

Need

Multi

Type and reference

Semantics description

Message Type

MP

Message Type

UE information elements

RRC transaction identifier

MP

RRC transaction identifier 10.3.3.36

Integrity check info

CH

Integrity check info 10.3.3.16

Other information elements

Inter-RAT change failure

MP

Inter-RAT change failure 10.3.8.5