10.2.25 PHYSICAL SHARED CHANNEL ALLOCATION

25.3313GPPProtocol specificationRadio Resource Control (RRC)Release 17TS

NOTE: Only for TDD.

This message is used by UTRAN to assign physical resources to USCH/DSCH transport channels in TDD, for temporary usage by the UE.

RLC-SAP: UM on SHCCH, UM on DCCH

Logical channel: SHCCH or DCCH

Direction: UTRAN  UE

Information Element/Group name

Need

Multi

Type and reference

Semantics description

Message Type

MP

Message type

DSCH-RNTI

OP

DSCH-RNTI 10.3.3.9a

RRC transaction identifier

MP

RRC transaction identifier 10.3.3.36

Uplink timing advance Control

MD

Uplink Timing Advance Control 10.3.6.96

Default value is the existing value for uplink timing advance

PUSCH capacity allocation info

OP

PUSCH Capacity Allocation info 10.3.6.64

PDSCH capacity allocation info

OP

PDSCH Capacity Allocation info 10.3.6.42

Confirm request

MD

Enumerated(No Confirm, Confirm PDSCH, Confirm PUSCH)

Default value is No Confirm

Traffic volume report request

OP

Integer (0 .. 255)

Indicates the number of frames between start of the allocation period and sending measurement report. The value should be less than the value for Allocation Duration.

ISCP Timeslot list

OP

1 to maxTS

>Timeslot number

MP

Timeslot number 10.3.6.84

Timeslot numbers, for which the UE shall report the timeslot ISCP in PUSCH CAPACITY REQUEST message.

Request P-CCPCH RSCP

MP

Boolean

TRUE indicates that a Primary CCPCH RSCP measurement shall be reported by the UE in PUSCH CAPACITY REQUEST message.