10.2.16b HANDOVER TO UTRAN COMPLETE
25.3313GPPProtocol specificationRadio Resource Control (RRC)Release 17TS
This message is sent by the UE when a handover to UTRAN has been completed.
RLC-SAP: AM
Logical channel: DCCH
Direction: UE UTRAN
|
Information Element/Group name |
Need |
Multi |
Type and reference |
Semantics description |
Version |
|---|---|---|---|---|---|
|
Message Type |
MP |
Message Type |
|||
|
UE Information elements |
|||||
|
START list |
CH |
1 to <maxCNdomains> |
START [40] values for all CN domains. |
||
|
>CN domain identity |
MP |
CN domain identity 10.3.1.1 |
|||
|
>START |
MP |
START 10.3.3.38 |
|||
|
RB Information elements |
|||||
|
COUNT-C activation time |
OP |
Activation time 10.3.3.1 |
Used for radio bearers mapped on RLC-TM. |
||
|
Other Information elements |
REL-10 |
||||
|
Logged Meas Available |
OP |
Enumerated (TRUE) |
Indicates the UE has logged measurements to report to the network |
REL-10 |
|
|
Connection Establishment Failure Info Available |
OP |
Enumerated (TRUE) |
True indicates the UE has logged measurements from a RRC connection establishment failure to report to the network |
REL-11 |