A.2 IR_G ATS

3GPP51.010-5Mobile Station (MS) conformance specificationPart 5: Inter-Radio-Access-Technology (RAT) (GERAN / UTRAN) interaction Abstract Test Suite (ATS)Release 10TS

The approved test cases are listed below.

Number of TC Executions

This column indicates the recommended number of TC executions. In case this recommended number is less than the number of TC executions imposed by the individual TC applicability, this column also indicates the preferred domain for testing. The different entries shall be read as follows:

CS – TC is recommended to execute in CS domain

CS+PS – TC is recommended to execute CS+PS with pc_CS and pc_PS set to TRUE

PS – TC is recommended to execute in PS domain

Note: This definition is taken from 34.123-2, clause 4.

Table A.2: IR_G TTCN test cases

Test case

Description

Number of TC Executions

(informative)

20.22.29

Packet Measurement order procedure / Downlink transfer / Normal case/ 3G cell reselection dedicated parameters

1 Execution: PS

20.22.29a

Packet Measurement order procedure / Downlink transfer / Normal case/ 3G cell reselection dedicated parameters with GEA2 and UEA2 ciphering

1 Execution: PS

20.22.29b

Packet Measurement order procedure / Downlink transfer / Normal case/ 3G cell reselection dedicated parameters with GEA3 and UEA2 ciphering

1 Execution: PS

20.22.29c

Packet Measurement order procedure / Downlink transfer / Normal case/ 3G cell reselection dedicated parameters with GEA4 and UEA2 ciphering

1 Execution: PS

20.25.2

Intersystem Cell Reselection/Idle Mode/FDD_Qmin

1 Execution: CS

20.25.3

Intersystem Cell Reselection/Idle Mode/FDD_Qoffset

1 Execution: CS

20.25.4

Intersystem Cell Reselection/Idle Mode/Qsearch_I

1 Execution: CS

26.6.11.3

Classmark interrogation / UTRAN Classmark Change

1 Execution: CS

26.6.11.4

Early UTRAN Classmark Sending

1 Execution: CS

41.5.1.1.1.4

Uplink TBF establishment with no reallocation of CS resources / Abnormal cases / Inter System to UTRAN Handover Command

1 Execution: CS + PS

47.3.4.1

Handover to UTRAN while in DTM / Downlink TBF

1 Execution: CS + PS

47.3.4.2

Handover to UTRAN while in DTM / Uplink TBF

1 Execution: CS + PS

60.1

Inter system handover to UTRAN/From GSM/Speech/Success

1 Execution: CS

60.1a

Inter system handover to UTRAN/From GSM/Speech/Success with A5/3 and UEA2/UIA2 ciphering

1 Execution: CS

60.1b

Inter system handover to UTRAN/From GSM/Speech/Success with A5/4 and UEA2/UIA2 ciphering

1 Execution: CS

60.2a

Inter system handover to UTRAN/From GSM/Data/Same data rate/Success

1 Execution: CS

60.3a

Inter system handover to UTRAN/From GSM/Data/Data rate upgrading/Success

1 Execution: CS

60.4

Inter system handover to UTRAN/From GSM/SDCCH/CC Establishment/Success

1 Execution: CS

60.5

Inter system handover to UTRAN/From GSM/Speech/Blind HO/Success

1 Execution: CS

60.6

Inter system handover to UTRAN/From GSM/Speech/Failure

1 Execution: CS

60.10

Inter system handover to UTRAN/From GSM/Integrity Protection Activation

1 Execution: CS

A.2.1 Void

A.2.2 The TTCN Machine Processable form (TTCN.MP)

The TTCN.MP representation corresponding to this ATS is contained in an ASCII file (IR_G.MP) which accompanies the present document.

Annex B (normative):
Partial IXIT proforma

Notwithstanding the provisions of the copyright clause related to the text of the present document, 3GPP Organizational Partners grant that users of the present document may freely reproduce the partial IXIT proforma in this annex so that it can be used for its intended purposes and may further publish the completed partial IXIT.