11.2.4 Packet Cell Change Order
3GPP44.060General Packet Radio Service (GPRS)Mobile Station (MS) - Base Station System (BSS) interfaceRadio Link Control / Medium Access Control (RLC/MAC) protocolRelease 17TS
This message is sent on the PCCCH or PACCH by the network to the mobile station to command the mobile station to leave the current cell and change to a new cell. For a (3G) multi-RAT mobile station the new cell may be a 3G Cell. For a (E-UTRAN) multi-RAT mobile station the new cell may be an E-UTRAN cell.
Message type: PACKET CELL CHANGE ORDER
Direction: network to mobile station
Classification: non-distribution message
Table 11.2.4.1: PACKET CELL CHANGE ORDER message content
|
< Packet Cell Change Order message content > ::= < PAGE_MODE : bit (2) > { { 0 < Global TFI : < Global TFI IE > > | 10 < TLLI / G-RNTI : bit (32) > } { 0 { < IMMEDIATE_REL : bit > ! < Non-distribution part error : bit (*) = < no string > > } | 1 { 00 — Message escape { < IMMEDIATE_REL : bit > { 0 | 1 < UTRAN FDD Target cell: < UTRAN FDD Target cell IE > > } { 0 | 1 < UTRAN TDD Target cell: < UTRAN TDD Target cell IE > > } { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-5 : { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-8 { 0 | 1 < Individual Priorities : < Individual Priorities IE >> } { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-11 { 0 | 1 < E-UTRAN Target cell with extended EARFCN : < E-UTRAN Target cell with extended EARFCN IE >> } { 0 | 1 < E-UTRAN IPP with extended EARFCNs: < E-UTRAN IPP with extended EARFCNs IE >> } < padding bits > } } } ! < Non-distribution part error : bit (*) = < no string > > } ! < Message escape : { 01 | 10 | 11} bit (*) = <no string> > } } ! < Address information part error : bit (*) = < no string > > } ! < Distribution part error : bit (*) = < no string > > ; |
|
< GSM target cell struct > ::= < ARFCN : bit (10) > < BSIC : bit (6) > < NC Measurement Parameters : < NC Measurement Parameters struct > > { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in release 98 : { 0 | 1 < LSA Parameters : < LSA Parameters IE >> } { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in release 99 : < ENH Measurement parameters : < ENH Measurement parameters struct >> { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-4 : < CCN_ACTIVE : bit (1) > { 0 | 1 < CONTAINER_ID : bit (2) > } { 0 | 1 < CCN Support Description : < CCN Support Description struct >> } { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-5 : { 0 | 1 < Iu Mode Neighbour Cell Parameters : { 1 < Iu Mode Neighbour Cell params struct > } ** 0 > } –Supplementary information for dual Iu mode and A/Gb mode capable cells { 0 | 1 < NC Iu MODE ONLY CAPABLE CELL LIST : NC Iu Mode Only Cell List struct > } { 0 | 1 < GPRS 3G Additional Measurement Parameters Description 2 : < GPRS 3G Additional Measurement Parameters Description 2 struct >>} { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-6 : { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in Rel-7 : 0 | 1 < 700_REPORTING_OFFSET : bit (3) > 0 | 1 < 810_REPORTING_OFFSET : bit (3) > { null | 0 bit** = <no string > — Receiver backward compatible with earlier version | 1 — Additions for Rel-8 < E-UTRAN_CCN_ACTIVE : bit (1) > { 0 | 1 < Individual Priorities : < Individual Priorities IE >> } < padding bits > } } } } } } } ; |
|
< NC Measurement Parameters struct > ::= < NETWORK_CONTROL_ORDER : bit (2) > { 0 | 1 < NC_NON_DRX_PERIOD : bit (3) > < NC_REPORTING_PERIOD_I : bit (3) > < NC_REPORTING_PERIOD_T : bit (3) > } { 0 | 1 < NC_FREQUENCY_LIST : NC Frequency list struct > } ; |
|
< NC Frequency list struct > ::= { 0 | 1 < NR_OF_REMOVED_FREQ : bit (5) > { < REMOVED_FREQ_INDEX : bit (6) > } * (1 + val(NR_OF_REMOVED_FREQ)) } { 1 < List of added Frequency : < Add Frequency list struct > >} ** 0; |
|
< Add Frequency list struct > ::= < START_FREQUENCY : bit (10) > < BSIC : bit (6) > { 0 | 1 < Cell selection params : < Cell Selection struct > > } < NR_OF_FREQUENCIES : bit (5) > < FREQ_DIFF_LENGTH : bit (3) > { < FREQUENCY_DIFF : bit (val(FREQ_DIFF_LENGTH)) > < BSIC : bit (6) > { 0 | 1 < Cell selection params : < Cell Selection struct > > } } * (val(NR_OF_FREQUENCIES)) ; |
|
< Cell Selection struct > ::= < CELL_BAR_ACCESS_2 : bit (1) > < EXC_ACC : bit > < SAME_RA_AS_SERVING_CELL : bit (1) > { 0 | 1 < GPRS_RXLEV_ACCESS_MIN : bit (6) > < GPRS_MS_TXPWR_MAX_CCH : bit (5) > } { 0 | 1 < GPRS_TEMPORARY_OFFSET : bit (3) > < GPRS_PENALTY_TIME : bit (5) > } { 0 | 1 < GPRS_RESELECT_OFFSET : bit (5) > } { 0 | 1 < HCS params : < HCS struct > > } { 0 | 1 < SI13_PBCCH_LOCATION : < SI13_PBCCH_LOCATION struct > > } ; |
|
< SI13_PBCCH_LOCATION struct > ::= { 0 < SI13_LOCATION : bit (1) > | 1 < PBCCH_LOCATION : bit (2) > < PSI1_REPEAT_PERIOD : bit (4) > } ; |
|
< HCS struct > ::= < PRIORITY_CLASS : bit (3) > < HCS_THR : bit (5) > ; |
|
< ENH Measurement parameters struct > :: = { 0 < BA_IND : bit > < 3G_BA_IND : bit > | 1 < PSI3_CHANGE_MARK : bit(2) > } < PMO_IND : bit > < REPORTING_RATE : bit > { 0 | 1 < GPRS REP PRIORITY Description : < GPRS REP PRIORITY Description struct >> } { 0 | 1 < GPRS MEASUREMENT Parameters Description : { 0 | 1 < GPRS 3G MEASUREMENT Parameters Description : < GPRS 3G MEASUREMENT PARAMETERS Description struct >> } ; |
|
< 3G Neighbour Cell Description struct > ::= 0 | 1 < Index_Start_3G : bit (7) > } |
|
< REMOVED_3GCELL_Description struct > ::= < N1 : bit (2) > { < N2 : bit (5) > { < REMOVED_3GCELL_INDEX : bit (7) > < 3G_CELL_DIFF_LENGTH : bit (3) > < 3GCELL_DIFF : bit (val(3G_CELL_DIFF_LENGTH)) > } * (1+val(N2)) } * (1+val(N1)) ; |
|
< UTRAN FDD Description struct > ::= { 0 | 1 < Bandwidth_FDD : bit (3) > } { 1 < Repeated UTRAN FDD Neighbour Cells : < Repeated UTRAN FDD Neighbour Cells struct >> } ** 0 ; |
|
< Repeated UTRAN FDD Neighbour Cells struct > ::= 0 < FDD-ARFCN : bit (14) > — The value ‘1’ was used in an earlier — version of the protocol and shall not be used. < FDD_Indic0 : bit > < NR_OF_FDD_CELLS : bit (5) > < FDD_CELL_INFORMATION Field : bit(p(NR_OF_FDD_CELLS)) > ; — p(x) defined in table 11.2.9b.2.a/3GPP TS 44.060 |
|
< UTRAN TDD Description struct > ::= { 0 | 1 < Bandwidth_TDD : bit (3) > } { 1 < Repeated UTRAN TDD Neighbour Cells : < Repeated UTRAN TDD Neighbour Cells struct >> } ** 0 ; |
|
< Repeated UTRAN TDD Neighbour Cells struct > ::= 0 < TDD-ARFCN : bit (14) > — The value ‘1’ was used in an earlier — version of the protocol and shall not be used. < TDD_Indic0 : bit > < NR_OF_TDD_CELLS : bit (5) > < TDD_CELL_INFORMATION Field : bit(q(NR_OF_TDD_CELLS)) > ; — q(x) defined in table 11.2.9b.2.b/3GPP TS 44.060. |
|
< GPRS REP PRIORITY Description struct > ::= < Number_Cells : bit(7) > { < REP_PRIORITY : bit > } * (val(Number_Cells)) ; |
|
< GPRS MEASUREMENT PARAMETERS Description struct > ::= 0 | 1 < MULTIBAND_REPORTING : bit (2) > } 0 | 1 < 900_REPORTING_OFFSET : bit (3) > 0 | 1 < 1800_REPORTING_OFFSET : bit (3) > 0 | 1 < 400_REPORTING_OFFSET : bit (3) > 0 | 1 < 1900_REPORTING_OFFSET : bit (3) > 0 | 1 < 850_REPORTING_OFFSET : bit (3) > |
|
< GPRS 3G MEASUREMENT PARAMETERS Description struct > ::= < Qsearch_P : bit (4) > — for backward compatibility with earlier releases < FDD_MULTIRAT_REPORTING : bit (2) > } 0 | 1 < FDD_REPORTING_OFFSET : bit (3) > 0 | 1 < TDD_MULTIRAT_REPORTING : bit (2) > } — TDD Parameters |
|
< CCN Support Description struct > ::= |
|
< Iu Mode Neighbour Cell Params struct > ::= { 0 | 1 < Iu Mode Cell Selection Params : <Iu Mode Cell Selection struct > > } < NR_OF_FREQUENCIES : bit (5) > { 0 | 1 < Iu Mode Cell Selection Params : < Iu Mode Cell Selection struct > > } * (val(NR_OF_FREQUENCIES)) ; |
|
< Iu Mode Cell Selection struct > ::= < CELL BAR QUALIFY 3 : bit (2) > { 0 | 1 < SI13Alt PBCCH Location: < SI13 PBCCH Location struct > > } ; |
|
< NC Iu Mode Only Cell List struct > ::= { 1 < List of added cells : < Add Iu Mode Only Cell List struct > >} ** 0; |
|
< Add Iu Mode Only Cell List struct > ::= < START_FREQUENCY : bit (10) > < BSIC : bit (6) > { 0 | 1 < Cell selection params : < Iu Mode Only Cell Selection struct > > } < NR_OF_FREQUENCIES : bit (5) > < FREQ_DIFF_LENGTH : bit (3) > { < FREQUENCY_DIFF : bit (val(FREQ_DIFF_LENGTH)) > < BSIC : bit (6) > { 0 | 1 < Cell selection params : < Iu Mode Only Cell Selection struct > > } } * (val(NR_OF_FREQUENCIES)) ; |
|
< Iu Mode Only Cell Selection struct > ::= < CELL BAR QUALIFY 3 : bit (2) > < SAME_RA_AS_SERVING_CELL : bit (1) > { 0 | 1 < GPRS_RXLEV_ACCESS_MIN : bit (6) > < GPRS_MS_TXPWR_MAX_CCH : bit (5) > } { 0 | 1 < GPRS_TEMPORARY_OFFSET : bit (3) > < GPRS_PENALTY_TIME : bit (5) > } { 0 | 1 < GPRS_RESELECT_OFFSET : bit (5) > } { 0 | 1 < HCS params : < HCS struct > > } { 0 | 1 < SI13Alt_PBCCH_LOCATION : < SI13_PBCCH_LOCATION struct > > } ; |
|
< GPRS 3G Additional Measurement Parameters Description 2 struct > ::= { 0 | 1 < FDD_REPORTING_THRESHOLD_2 : bit (6) > } ; — FDD Parameters |
Table 11.2.4.2: PACKET CELL CHANGE ORDER information element details
|
PAGE_MODE (2 bit field) Global TFI TLLI / G-RNTI (32 bit field) |
|
IMMEDIATE_REL (1 bit field) 0 No immediate abort of operation in the old cell is required. |
|
ARFCN (10 bit field) |
|
BSIC (6 bit field) |
|
CCN_ACTIVE (1 bit field) |
|
CONTAINER_ID (2 bit field) |
|
The NC_Measurement_Parameters struct contains the NETWORK_CONTROL_ORDER and the optional parameters NC_NON_DRX_PERIOD, NC_REPORTING_PERIOD_I, NC_REPORTING_PERIOD_T and the NC_FREQUENCY LIST. These parameters shall apply in the target cell (see sub-clause 5.6.1) |
|
NETWORK_CONTROL_ORDER (2 bit field) bit |
|
NC_NON_DRX_PERIOD (3 bit field) |
|
NR_OF_REMOVED_FREQ (5 bit field) |
|
FREQ_DIFF_LENGTH (3 bit field) |
|
FREQUENCY_DIFF (val(FREQ_DIFF_LENGTH) bit field) |
|
LSA Parameters |
|
ENH Measurement Parameters: For detailed element definitions see the Packet Measurement Order message |
|
UTRAN FDD Target cell This information element contains the description of the UTRAN FDD Target cell. This information element is defined in sub-clause 12.31. |
|
UTRAN TDD Target cell This information element contains the description of the UTRAN TDD Target cell. This information element is defined in sub-clause 12.32. |
|
E-UTRAN Target cell This information element contains the description of the E-UTRAN Target cell. This information element is defined in sub-clause 12.49. If the conditions for sending the E-UTRAN Target cell with extended EARFCN information element are met (see definition of E-UTRAN Target cell with extended EARFCN IE below) then this information element shall not be included. |
|
GPRS MEASUREMENT PARAMETERS Description |
|
GPRS 3G MEASUREMENT PARAMETERS Description |
|
GPRS REP PRIORITY Description REP_PRIORITY bit: |
|
CCN Support Description CCN_SUPPORTED (1 bit field) |
|
G-RNTI extension (4 bit field) This field contains the extra 4 bits of the G-RNTI not included in the TLLI / G-RNTI field which are necessary to provide a unique identifier in Iu mode. |
|
Iu Mode Neighbour Cell Parameters The Iu mode Neighbour Cell Parameters shall only be included when the List of added Frequency struct is present. |
|
Iu Mode Neighbour Cell Params Struct This struct presents supplementary information for Iu mode capable cells. The struct assigns Iu mode parameter values to the neighbouring cells defined by the message. The Iu mode Neighbour Cell params struct values are assigned to the neighbouring cells in the same order they appear in the List of added Frequency struct. |
|
NC Iu Mode Only Capable Cell List Parameters These parameters are used to add Iu mode only capable cells to BA(GPRS) list. |
|
CELL BAR QUALIFY 3 (2 bit field) This information element is defined in 3GPP TS 44.018. |
|
GPRS 3G Additional Measurement Parameters Description 2 The fields of this Description are used for measurements, as defined in 3GPP TS 45.008. |
|
3G_CCN_ACTIVE (1 bit field) 0 The broadcast 3G_CCN_ACTIVE parameter shall apply if available. Otherwise, CCN towards 3G cells is disabled in the cell. 1 CCN towards 3G cells is enabled in the cell. |
|
700_REPORTING_OFFSET (3 bit field) |
|
810_REPORTING_OFFSET (3 bit field) |
|
E-UTRAN_CCN_ACTIVE (1 bit field) |
|
Individual Priorities |
|
E-UTRAN Target cell with extended EARFCN |
|
E-UTRAN IPP with extended EARFCNs |