17.4.3a Handover to inter-band cell to start MBMS service reception
36.523-13GPPEvolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC)Part 1: Protocol conformance specificationRelease 17TSUser Equipment (UE) conformance specification
17.4.3a.1 Test Purpose (TP)
(1)
with { UE in E-UTRA RRC_Connected state AND on a cell broadcasting SIB15 and interested to receive a MBMS service }
ensure that {
when { SIB15 indicates that the MBMS service is available on a frequency of a neighbour cell on a different frequency band }
then { UE transmits a MBMSInterestIndication message indicating interest in MBMS reception on the frequency }
}
(2)
with { UE in E-UTRA RRC_Connected state AND having transmitted a MBMSInterestIndication message indicating interest in MBMS reception on a frequency of a neighbour cell on a different frequency band }
ensure that {
when { UE receives RRCConnectionReconfiguration message including a mobilityControlInfo indicating a the E-UTRA frequency of the inter-frequency neighbour cell }
then { UE performs inter-band handover and starts MBMS reception }
}
17.4.3a.2 Conformance requirements
Same as test case 17.4.3.
17.4.3a.3 Test description
17.4.3a.3.1 Pre-test conditions
Same as test case 17.4.3 with the following differences:
– Cells configuration: Cell 10 replaces Cell 3
17.4.3a.3.2 Test procedure sequence
Same as test case 17.4.3 with the following differences:
– Cells configuration: Cell 10 replaces Cell 3
17.4.3a.3.3 Specific message contents
Same as test case 17.4.3 with the following differences:
– Cells configuration: Cell 10 replaces Cell 3