Skip to content
TechSpec
  • Foreword
  • 1 Scope
  • 2 References
  • 3 Definitions and abbreviations
  • 4 Concepts and overview
  • 5 Specification level requirements
  • 6. Performance assurance specific operations and notifications
  • 7. Performance assurance services components
  • 8 RESTful HTTP-based solution set of performance measurement job control service specific operations and notifications
  • 9 Void
  • B.1 NF measurement job creation
  • B.2 NSSI measurement job creation
  • B.3 NSI measurement job creation
  • B.4 Network measurement job creation
  • B.5 NF measurement job termination
  • B.6 NSSI measurement job termination
  • B.7 NSI measurement job termination
  • B.8 Network measurement job termination
  • D.1 Performance data streaming for starting measurement collection
  • D.2 Performance data streaming for stopping measurement collection
  • E.3 Void
  • F.1 Threshold crossing notifications triggering for cumulative counters
  • F.2 Threshold crossing notifications triggering for measurements that are not cumulative counters
  • H.1 General
  • H.2 Procedure of NSI and NSSI performance assurance
  • I.1 Performance Data Stream Units (GPB) schema

E.3 Void

28.5503GPPManagement and orchestrationPerformance assuranceRelease 18TS

Tools: ARFCN - Frequency Conversion for 5G NR/LTE/UMTS/GSM

Annex F (normative):
Threshold crossing notifications triggering