A.5.7 Serving HS-DSCH cell change
25.1233GPPRelease 17Requirements for support of radio resource management (TDD)TS
A.5.7.1 Test Purpose and Environment
A.5.7.1.1 3.84Mcps TDD option
Void.
A.5.7.1.2 1.28Mcps TDD option
The purpose of this test is to verify the requirement for the delay when performing the serving HS-DSCH cell change in CELL_DCH state specified in section 5.9.
The test parameters are given in Table A.5.7.1 and A.5.7.2 below. The test consists of 3 successive time periods, with a time duration of T1, T2, T3 respectively. At the start of time duration T1 the UE have cell 1 in active set and cell 1 as the serving HS-DSCH cell.
Data shall be transmitted continuously to the UE on the HS-DSCH channel.
Table A.5.7.1: General test parameters for serving HS-DSCH cell change
Parameter |
Unit |
Value |
Comment |
|
DCH parameters |
DL and UL Reference Measurement Channel 12.2 kbps |
As specified in TS 25.102 section A.2.2.2 and A.2.1.2 |
||
Power Control |
On |
|||
Target quality value on DTCH |
BLER |
0.001 |
||
HSDPA parameters |
with QPSK modulation only |
As specified in TS 25.102 section |
||
Initial conditions |
Active cells |
Cell 1 |
||
Serving HS-DSCH cell |
Cell 1 |
|||
Final condition |
Active cell |
Cell 2 |
||
Serving HS-DSCH cell |
Cell 2 |
|||
Hysteresis |
dB |
0 |
||
O |
dB |
0 |
Cell individual offset. This value shall be used for all cells in the test. |
|
Time to Trigger |
ms |
0 |
||
Filter coefficient |
0 |
|||
Monitored cell list size |
6 TD-SCDMA neighbours on Channel 1 |
|||
T1 |
s |
5 |
||
T2 |
s |
5 |
||
T3 |
s |
5 |
Table A.5.7.2: Cell specific test parameters for serving HS-DSCH cell change
Parameter |
Unit |
Cell 1 |
||||||||||||||||||
Timeslot Number |
0 |
DwPTS |
5 |
|||||||||||||||||
T1 |
T2 |
T3 |
T1 |
T2 |
T3 |
T1 |
T2 |
T3 |
||||||||||||
UTRA RF Channel Number |
Channel 1(Note3) |
|||||||||||||||||||
PCCPCH_Ec/Ior |
dB |
-3 |
n.a. |
|||||||||||||||||
DwPCH_Ec/Ior |
n.a. |
-3 |
n.a. |
|||||||||||||||||
DPCH_Ec/Ior |
dB |
n.a. |
n.a. |
Note1 |
||||||||||||||||
HS-PDSCH_Ec/Ior |
dB |
n.a. |
n.a. |
-1 |
-inf |
|||||||||||||||
HS-SCCH_Ec/Ior |
dB |
n.a. |
n.a. |
-4 |
-inf |
|||||||||||||||
dB |
-3 |
n.a. |
Note2 |
|||||||||||||||||
dB |
10 |
7 |
10 |
7 |
10 |
7 |
||||||||||||||
dBm/1.28MHz |
-70 |
|||||||||||||||||||
PCCPCH_RSCP |
dBm |
-63 |
-66 |
n.a. |
n.a. |
|||||||||||||||
Propagation Condition |
AWGN |
|||||||||||||||||||
Parameter |
Unit |
Cell 2 |
||||||||||||||||||
Timeslot Number |
0 |
DwPTS |
5 |
|||||||||||||||||
T1 |
T2 |
T3 |
T1 |
T2 |
T3 |
T1 |
T2 |
T3 |
||||||||||||
UTRA RF Channel Number |
Channel 1(Note3) |
|||||||||||||||||||
PCCPCH_Ec/Ior |
dB |
-3 |
n.a. |
|||||||||||||||||
DwPCH_Ec/Ior |
-3 |
|||||||||||||||||||
DPCH_Ec/Ior |
dB |
n.a. |
n.a. |
Note1 |
||||||||||||||||
HS-PDSCH_Ec/Ior |
dB |
-inf. |
-1 |
n.a. |
-inf. |
-1 |
||||||||||||||
HS-SCCH_Ec/Ior |
dB |
-inf. |
-4 |
n.a |
-inf. |
-4 |
||||||||||||||
dB |
-3 |
n.a |
Note2 |
|||||||||||||||||
dB |
7 |
10 |
7 |
10 |
7 |
10 |
||||||||||||||
dBm/1.28MHz |
-70 |
|||||||||||||||||||
PCCPCH_RSCP |
dBm |
-66 |
-63 |
n.a. |
n.a. |
|||||||||||||||
Propagation Condition |
AWGN |
|||||||||||||||||||
Note1: The DPCH level is controlled by the power control loop Note2: The power of the OCNS channel that is added shall make the total power from the cell to be equal to Ior. Note3: In the multi-carrier networks, UTRA RF Channel Number is the main carrier channel number. |
1) The test is started at the beginning of T1.
2) During time period T2 an Event 1G triggered measurement report shall be sent by the UE.
3) During time period T2 UTRAN shall send a Physical Channel Configuration command with activation time now changing serving HS-DSCH from cell 1 to cell 2.
4) T3 is defined as the end of the last TTI of Physical Channel Configuration command.
A.5.7.1.3 7.68Mcps TDD option
Void.
A.5.7.2 Test Requirements
A.5.7.2.1 3.84Mcps TDD option
Void.
A.5.7.2.2 1.28Mcps TDD option
The UE shall start to transmit the CQI to cell 2 less than 175 ms from the beginning of time period T3.
The UE shall also start to receive the first HS-SCCH message from cell 2 less than 175 ms from the beginning of time period T3 and transmit the ACK or NAK which corresponds to the HS-SCCH message.
NOTE: The delay TDell change = TRRC + Tul/dl sync + Ths-sich/hs-scch interval = 80 + 80 +15 = 175ms.
TRRC RRC procedure delay is defined in TS25.331 Section 13.5.2.
Tul/dl sync Defined as Uplink and Downlink synchronisation time, specified as 80ms.
Ths-sich/hs-scch interval Defined as interval time between HS-SCCH and the corresponding HS-SICH, for 1,28Mcps option specified as 15ms.
A.5.7.2.3 7.68Mcps TDD option
Void.