A.4 Idle Mode

25.1233GPPRelease 17Requirements for support of radio resource management (TDD)TS

A.4.1 Cell selection

NOTE: This section is included for consistency with numbering with section 4; no test covering requirements exist.

A.4.2 Cell Re-Selection

For each of the re-selection scenarios in section 4.2 a test is proposed.

For TDD/TDD cell reselection two scenarios are considered:

Scenario 1: Single carrier case

Scenario 2: Multi carrier case

A.4.2.1 Scenario 1: Cell re-selection to intra frequency TDD cell

A.4.2.1.1 Test Purpose and Environment

This test is to verify the requirement for the cell re-selection delay in the single carrier case reported in section 4.2.2.

A.4.2.1.1.1 3.84 Mcps TDD option

This scenario implies the presence of 1 carrier and 6 cells as given in Table A.4.1and A.4.2. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.1: General test parameters for Cell Re-selection to intra-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-102

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

15

T2

s

15

Table A.4.2: Cell re-selection to intra-frequency TDD cell

Parameter

Unit

Cell 1

Cell 2

Cell 3

Timeslot Number

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

0

0

0

0

5

5

5

5

10

10

10

10

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

9

7

9

7

7

9

7

9

-1

-1

-1

-1

PCCPCH RSCP

dBm

-64

-66

-66

-64

-74

-74

Qoffset1s,n

dB

C1, C2: 0; C1, C3:0; C1,C4:0

C1, C5:0; C1,C6:0

C2, C1: 0; C2, C3:0; C2,C4:0

C2, C5: 0; C2,C6:0

C3, C1: 0; C3, C2:0; C3,C4:0

C3, C5: 0; C3,C6:0

Qhyst 1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Cell 4

Cell 5

Cell 6

Timeslot

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

15

15

15

15

20

20

20

20

25

25

25

25

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

PCCPCH RSCP

dBm

-74

-74

-74

-74

-74

-74

Qoffset1s,n

dB

C4, C1: 0; C4, C2:0; C4,C3:0 C4, C5:0; C4, C6:0

C5, C1: 0; C5, C2:0; C5,C3:0

C5, C4:0; C5, C6:0

C6, C1: 0; C6, C2:0; C6,C3:0

C6, C4:0; C6, C5:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

dBm/3,84 MHz

-70

Propagation Condition

AWGN

A.4.2.1.1.2 1.28 Mcps TDD option

This scenario implies the presence of 1 carrier and 6 cells as given in Table A.4.1A and A.4.2A. The UE is requested to monitor neighbouring cells on 1 carrier. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.1A: General test parameters for Cell Re-selection to intra-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-103

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑- Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

15

T2

s

15

Table A.4.2A: Cell re-selection to intra-frequency TDD cell

Parameter

Unit

Cell 1

Cell 2

Cell 3

Timeslot Number

0

DWPTS

0

DWPTS

0

DWPTS

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

DwPCH_Ec/Ior

dB

0

0

0

0

0

0

OCNS_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

dB

10

7

10

7

7

10

7

10

-1

-1

-1

-1

PCCPCH RSCP

dBm

-63

-66

-66

-63

-74

-74

Qoffset1s,n

dB

C1, C2: 0; C1, C3:0; C1,C4:0

C1, C5:0; C1,C6:0

C2, C1: 0; C2, C3:0; C2,C4:0

C2, C5: 0; C2, C6:0

C3, C1: 0; C3, C2:0; C3,C4:0

C3, C5: 0; C3, C6:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Cell 4

Cell 5

Cell 6

Timeslot

0

DWPTS

0

DWPTS

0

DWPTS

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

DwPCH_Ec/Ior

dB

0

0

0

0

0

0

OCNS_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

dB

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

PCCPCH RSCP

dBm

-74

-74

-74

-74

-74

-74

Qoffset1s,n

dB

C4, C1: 0; C4, C2:0; C4,C3:0 C4, C5:0; C4, C6:0

C5, C1: 0; C5, C2:0; C5,C3:0

C5, C4:0; C5, C6:0

C6, C1: 0; C6, C2:0; C6,C3:0

C6, C4:0; C6, C5:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

dBm/ 1.28 MHz

-70

Propagation Condition

AWGN

Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

A.4.2.1.1.3 7.68 Mcps TDD option

This scenario implies the presence of 1 carrier and 6 cells as given in Table A.4.1B and A.4.2B. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.1B: General test parameters for Cell Re-selection to intra-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-102

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

15

T2

s

15

Table A.4.2B: Cell re-selection to intra-frequency TDD cell

Parameter

Unit

Cell 1

Cell 2

Cell 3

Timeslot Number

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

0

0

0

0

5

5

5

5

10

10

10

10

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

9

7

9

7

7

9

7

9

-1

-1

-1

-1

PCCPCH RSCP

dBm

-64

-66

-66

-64

-74

-74

Qoffset1s,n

dB

C1, C2: 0; C1, C3:0; C1,C4:0

C1, C5:0; C1,C6:0

C2, C1: 0; C2, C3:0; C2,C4:0

C2, C5: 0; C2,C6:0

C3, C1: 0; C3, C2:0; C3,C4:0

C3, C5: 0; C3,C6:0

Qhyst 1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Cell 4

Cell 5

Cell 6

Timeslot

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

15

15

15

15

20

20

20

20

25

25

25

25

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

PCCPCH RSCP

dBm

-74

-74

-74

-74

-74

-74

Qoffset1s,n

dB

C4, C1: 0; C4, C2:0; C4,C3:0 C4, C5:0; C4, C6:0

C5, C1: 0; C5, C2:0; C5,C3:0

C5, C4:0; C5, C6:0

C6, C1: 0; C6, C2:0; C6,C3:0

C6, C4:0; C6, C5:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

dBm/7,68 MHz

-70

Propagation Condition

AWGN

A.4.2.1.2 Test Requirements

A.4.2.1.2.1 3.84 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:

TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1 in section 4.2.2.7.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.1.2.2 1.28 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateNTDD + TSI, where:

TevaluateNTDD: A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate NTDD of 6.4s according to Table 4.1A in section 4.2.

TSI: Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in 25.331 for a UTRAN cell (ms). 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.1.2.3 7.68 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:

TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1B in section 4.2.2.7.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2 Scenario 2: Cell re-selection to inter-frequency TDD cell

A.4.2.2.1 Test Purpose and Environment

This test is to verify the requirement for the cell re-selection delay in the multi carrier case reported in section 4.2.2.

A.4.2.2.1.1 3.84 Mcps TDD option

This scenario implies the presence of 2 carriers and 6 cells as given in Table A.4.3 and A.4.4. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.3: General test parameters for Cell Re-selection to inter-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-102

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

Table A.4.4: Cell re-selection to iner-frequency TDD cell

Parameter

Unit

Cell 1

Cell 2

Cell 3

Timeslot Number

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 2

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

0

0

0

0

5

5

5

5

10

10

10

10

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

6

0

6

0

0

6

0

6

-3

-3

-3

-3

PCCPCH RSCP

dBm

-67

-73

-73

-67

-76

-76

Qoffset1s,n

dB

C1, C2: 0; C1, C3:0; C1,C4:0 C1, C5:0; C1, C6:0

C2, C1: 0; C2, C3:0; C2,C4:0 C2, C5:0; C2, C6:0

C3, C1: 0; C3, C2:0; C3,C4:0

C3, C5:0; C3, C6:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Sintersearch

dB

not sent

not sent

not sent

Cell 4

Cell 5

Cell 6

Timeslot

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 2

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

15

15

15

15

20

20

20

20

25

25

25

25

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

-3

-3

-3

-3

-3

-3

-3

-3

-3

-3

-3

-3

PCCPCH RSCP

dBm

-76

-76

-76

-76

-76

-76

Qoffset1s,n

dB

C4, C1: 0; C4, C2:0; C4,C3:0

C4, C5:0; C4, C6:0

C5, C1: 0; C5, C2:0; C5,C3:0

C5, C4:0; C5, C6:0

C6, C1: 0; C6, C2:0; C6,C3:0

C6, C4:0; C6, C5:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Sintersearch

dB

not sent

not sent

not sent

dBm/3,84 MHz

-70

Propagation Condition

AWGN

A.4.2.2.1.2 1.28 Mcps TDD option

This scenario implies the presence of 2 carriers and 6 cells as given in Table A.4.3A and A.4.4A. The UE is requested to monitor neighbouring cells on 2 carriers. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.3A: General test parameters for Cell Re-selection to inter-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-103

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

Table A.4.4A: Cell re-selection to inter-frequency TDD cell

Parameter

Unit

Cell 1

Cell 2

Cell 3

Timeslot Number

0

DWPTS

0

DWPTS

0

DWPTS

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 2

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

DwPCH_Ec/Ior

dB

0

0

0

0

0

0

OCNS_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

dB

10

4

10

4

4

10

4

10

-1

-1

-1

-1

PCCPCH RSCP

dBm

-63

-69

-69

-63

-74

-74

Qoffset1s,n

dB

C1, C2: 0; C1, C3:0; C1,C4:0 C1, C5:0; C1, C6:0

C2, C1: 0; C2, C3:0; C2,C4:0C2, C5:0; C2, C6:0

C3, C1: 0; C3, C2:0; C3,C4:0

C3, C5:0; C3, C6:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Sintersearch

dB

not sent

not sent

not sent

Cell 4

Cell 5

Cell 6

Timeslot

0

DWPTS

0

DWPTS

0

DWPTS

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 2

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

DwPCH_Ec/Ior

dB

0

0

0

0

0

0

OCNS_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

dB

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

PCCPCH RSCP

dBm

-74

-74

-74

-74

-74

-74

Qoffset1s,n

dB

C4, C1: 0; C4, C2:0; C4,C3:0

C4, C5:0; C4, C6:0

C5, C1: 0; C5, C2:0; C5,C3:0

C5, C4:0; C5, C6:0

C6, C1: 0; C6, C2:0; C6,C3:0

C6, C4:0; C6, C5:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Sintersearch

dB

not sent

not sent

not sent

dBm/ 1.28 MHz

-70

Propagation Condition

AWGN

NOTE: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

A.4.2.2.1.3 7.68 Mcps TDD option

This scenario implies the presence of 2 carriers and 6 cells as given in Table A.4.3B and A.4.4B. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.3B: General test parameters for Cell Re-selection to intra-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-102

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

Table A.4.4B: Cell re-selection to inter-frequency TDD cell

Parameter

Unit

Cell 1

Cell 2

Cell 3

Timeslot Number

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 2

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

0

0

0

0

5

5

5

5

10

10

10

10

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

6

0

6

0

0

6

0

6

-3

-3

-3

-3

PCCPCH RSCP

dBm

-67

-73

-73

-67

-76

-76

Qoffset1s,n

dB

C1, C2: 0; C1, C3:0; C1,C4:0 C1, C5:0; C1, C6:0

C2, C1: 0; C2, C3:0; C2,C4:0 C2, C5:0; C2, C6:0

C3, C1: 0; C3, C2:0; C3,C4:0

C3, C5:0; C3, C6:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Sintersearch

dB

not sent

not sent

not sent

Cell 4

Cell 5

Cell 6

Timeslot

0

8

0

8

0

8

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 2

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

15

15

15

15

20

20

20

20

25

25

25

25

PICH_Ec/Ior

dB

-3

-3

-3

-3

-3

-3

OCNS

dB

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

-3

-3

-3

-3

-3

-3

-3

-3

-3

-3

-3

-3

PCCPCH RSCP

dBm

-76

-76

-76

-76

-76

-76

Qoffset1s,n

dB

C4, C1: 0; C4, C2:0; C4,C3:0

C4, C5:0; C4, C6:0

C5, C1: 0; C5, C2:0; C5,C3:0

C5, C4:0; C5, C6:0

C6, C1: 0; C6, C2:0; C6,C3:0

C6, C4:0; C6, C5:0

Qhyst1s

dB

0

0

0

Treselection

s

0

0

0

Sintrasearch

dB

not sent

not sent

not sent

Sintersearch

dB

not sent

not sent

not sent

dBm/7,68 MHz

-70

Propagation Condition

AWGN

A.4.2.2.2 Test Requirements

A.4.2.2.2.1 3.84 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:

TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1 in section 4.2.2.7.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2.2.2 1.28 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateNTDD + TSI, where:

TevaluateNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate NTDD of 6.4s according to Table 4.1A in section 4.2.

TSI Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in 25.331 for a UTRAN cell (ms). 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2.2.3 7.68 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:

TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1B in section 4.2.2.7.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2A Scenario 2A: 3.84 Mcps TDD cell re-selection for 1.28 Mcps TDD UE

A.4.2.2A.1 Test Purpose and Environment

This test is to verify the requirement for the 1.28 Mcps TDD OPTION/3.84 Mcps TDD OPTION cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 low chip rate (1.28 Mcps TDD OPTION) and 1 high chip rate (3.84 Mcps TDD OPTION)) cell as given in Table A.4.3B and A.4.4B.

The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304.

Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.3B: General test parameters for TDD low chip rate to TDD high chip rate cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

1.28 Mcps TDD OPTION cell

Neighbour cell

Cell2

3.84 Mcps TDD OPTION cell

Final condition

Active cell

Cell2

3.84 Mcps TDD OPTION cell

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1,28

The value shall be used for all cells in the test.

DRX cycle length

s

1,28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

Table A.4.4B: Test parameters for TDD low chip rate to TDD high chip rate cell re-selection

Parameter

Unit

Cell 1

Cell 2

Timeslot Number

0

DwPTS

0

8

T1

T2

T 1

T 2

T1

T2

T 1

T 2

UTRA RF Channel Number (NOTE)

Channel 1

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

DwPCH_Ec/Ior

dB

0

0

n.a.

n.a.

SCH_Ec/Ior

dB

n.a.

n.a.

-9

-9

-9

-9

SCH_toffset

n.a.

n.a.

0

0

0

0

PICH_Ec/Ior

dB

-3

-3

OCNS_Ec/Ior

dB

-3

n.a.

-3,12

-3,12

-3,12

-3,12

dB

10

7

7

10

7

10

-70 dBm/ 1.28 MHz

-70 dBm/ 3.84 MHz

PCCPCH_RSCP

dBm

-63

-66

-66

-63

Qrxlevmin

dBm

-103

-103

Qoffset1s,n

dB

C1, C2: 0

C2, C1: 0

Qhyst1s

dB

0

0

Treselection

s

0

0

Sintersearch

dB

not sent

not sent

Propagation Condition

AWGN

AWGN

NOTE: In the case of multi-frequency cell for 1.28 Mcps TDD option, the UTRA RF Channel Number is the primary frequency’s channel number.

A.4.2.2A.2 Test Requirements

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

TevaluateTDD + TSI

where:

TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1A in section 4.2.

TSI Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in [16] for a UTRAN cell (ms). 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2B Scenario 2B: 3.84 Mcps/1.28 Mcps TDD cell re-selection

A.4.2.2B.1 Test Purpose and Environment

This test is to verify the requirement for the 3.84 Mcps/1.28 Mcps TDD cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 3.84 Mcps TDD serving cell, and 1 1.28 Mcps TDD cell to be re-selected. The UE is requested to monitor neighbouring cells on 1 3.84Mcps TDD carrier and 1 1.28Mcps TDD carrier. Test parameters are given in Table A.4.3C, A4.4C, and A.4.4D. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.3C: General test parameters for 3.84 Mcps /1.28 Mcps TDD cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell 1

3.84 Mcps TDD OPTION cell

Neighbour cell

Cell 2

1.28 Mcps TDD OPTION cell

Final condition

Active cell

Cell 2

1.28 Mcps TDD OPTION cell

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-103

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1,28

The value shall be used for all cells in the test.

DRX cycle length

s

1,28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

Table A.4.4C: Cell 1 specific test parameters for 3.84 Mcps TDD/1.28 Mcps TDD cell re-selection

Parameter

Unit

Cell 1

Timeslot Number

0

8

T1

T2

T 1

T 2

UTRA RF Channel Number

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

SCH_toffset

0

PICH_Ec/Ior

dB

-3

-3

OCNS_Ec/Ior

dB

-3.12

dB

10

7

10

7

PCCPCH_RSCP

dBm

-63

-66

Qoffset1s,n

dB

C1, C2: 0

Qhyst1s

dB

0

Treselection

s

0

Sintersearch

dB

not sent

dBm/3.84 MHz

-70

Propagation Condition

AWGN

Table A.4.4D: Cell 2 specific test parameters for 3.84 Mcps TDD/1.28 Mcps TDD cell re-selection

Parameter

Unit

Cell 2

Timeslot Number

0

DwPTS

T1

T2

T 1

T 2

UTRA RF Channel Number*

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

DwPCH_Ec/Ior

dB

0

0

OCNS_Ec/Ior

dB

-3

dB

7

10

7

10

PCCPCH_RSCP

dBm

-66

-63

Qoffset1s,n

dB

C2, C1: 0

Qhyst1s

dB

0

Treselection

s

0

Sintersearch

dB

not sent

dBm/1.28 MHz

-70

Propagation Condition

AWGN

* Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

A.4.2.2B.2 Test Requirements

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

TevaluateNTDD + TSI

where:

TevaluateNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate NTDD of 6.4s according to Table 4.1 in section 4.2.

TSI Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in [16] for a UTRAN cell (ms). 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2C Scenario 2C: 3.84 Mcps TDD cell re-selection for 7.68 Mcps TDD UE

A.4.2.2C.1 Test Purpose and Environment

This test is to verify the requirement for the 7.68 Mcps TDD OPTION/3.84 Mcps TDD OPTION cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 higher chip rate (7.68 Mcps TDD OPTION) and 1 high chip rate (3.84 Mcps TDD OPTION)) cell as given in Table A.4.4E and A4.4F.

The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304.

Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.4E: General test parameters for TDD higher chip rate (7.68 Mcps) to TDD high chip rate (3.84 Mcps) cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

7.68 Mcps TDD OPTION cell

Neighbour cell

Cell2

3.84 Mcps TDD OPTION cell

Final condition

Active cell

Cell2

3.84 Mcps TDD OPTION cell

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-102

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

S

1,28

The value shall be used for all cells in the test.

DRX cycle length

S

1,28

The value shall be used for all cells in the test.

T1

S

30

T2

S

15

Table A.4.4F: Test parameters for TDD higher chip rate (7.68 Mcps) to TDD high chip rate (3.84 Mcps) cell re-selection

Parameter

Unit

Cell 1

Cell 2

Timeslot Number

0

8

0

8

T1

T2

T 1

T 2

T1

T2

T 1

T 2

UTRA RF Channel Number

Channel 1

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

0

0

0

0

5

5

5

5

PICH_Ec/Ior

dB

-3

-3

-3

-3

OCNS_Ec/Ior

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

10

7

10

7

7

10

7

10

PCCPCH_RSCP

dBm

-63

-66

-66

-63

Qoffset1s,n

dB

C1, C2: 0

C2, C1: 0

Qhyst1s

dB

0

0

Treselection

s

0

0

Sintersearch

dB

not sent

not sent

-70 dBm/7.68 MHz

-70 dBm/3.84 MHz

Propagation Condition

AWGN

A.4.2.2C.2 Test Requirements

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

TevaluateTDD + TSI

where:

TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1B in section 4.2.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.2D Scenario 2D: 3.84 Mcps/7.68 Mcps TDD cell re-selection

A.4.2.2D.1 Test Purpose and Environment

This test is to verify the requirement for the 3.84 Mcps/7.68 Mcps TDD cell re-selection delay reported in section 4.2.

This scenario implies the presence of one 3.84 Mcps TDD serving cell, and one 7.68 Mcps TDD cell to be re-selected. The UE is requested to monitor neighbouring cells on one 3.84Mcps TDD carrier and one 7.68 Mcps TDD carrier. Test parameters are given in Table A.4.4G and A.4.4H. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.4G: General test parameters for 3.84 Mcps /7.68 Mcps TDD cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell 1

3.84 Mcps TDD OPTION cell

Neighbour cell

Cell 2

7.68 Mcps TDD OPTION cell

Final condition

Active cell

Cell 2

7.68 Mcps TDD OPTION cell

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-102

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

S

1,28

The value shall be used for all cells in the test.

DRX cycle length

S

1,28

The value shall be used for all cells in the test.

T1

S

30

T2

S

15

Table A.4.4H: Cell 1 specific test parameters for 3.84 Mcps TDD/7.68 Mcps TDD cell re-selection

Parameter

Unit

Cell 1

Cell 2

Timeslot Number

0

8

0

8

T1

T2

T 1

T 2

T1

T2

T 1

T 2

UTRA RF Channel Number

Channel 1

Channel 2

PCCPCH_Ec/Ior

dB

-3

-3

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

-9

-9

-9

-9

SCH_toffset

0

0

0

0

5

5

5

5

PICH_Ec/Ior

dB

-3

-3

-3

-3

OCNS_Ec/Ior

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

-3,12

dB

10

7

10

7

7

10

7

10

PCCPCH_RSCP

dBm

-63

-66

-66

-63

Qoffset1s,n

dB

C1, C2: 0

C2, C1: 0

Qhyst1s

dB

0

0

Treselection

s

0

0

Sintersearch

dB

not sent

not sent

-70 dBm/3.84 MHz

-70 dBm/7.68 MHz

Propagation Condition

AWGN

A.4.2.2E Scenario 2E: 1.28Mcps TDD inter-band cell re-selection

A.4.2.2E.1 Test Purpose and Environment

This test is to verify the requirement for the cell re-selection delay in the inter-band reported in section 4.2.2.

This scenario implies the presence of 2 carriers and 6 cells as given in Table A.4.4J and A.4.4K. The UE is requested to monitor neighbouring cells on 2 band carriers. Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.4I: General test parameters for Cell Re-selection to inter-frequency TDD cell

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

Neighbour cells

Cell2, Cell3,Cell4, Cell5, Cell6

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Qrxlevmin

dBm

-103

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

A.4.2.2E.2 Test Requirements

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

TevaluateNTDD + TSI

where:

TevaluateNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate NTDD of 6.4s according to Table 4.1 in section 4.2.

TSI Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in [16] for a UTRAN cell (ms). 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.3 Scenario 3: TDD/FDD cell re-selection

A.4.2.3.1 Test Purpose and Environment

A.4.2.3.1.1 3.84 Mcps TDD option

This test is to verify the requirement for the TDD/FDD cell re-selection delay reported in section 4.2.2.

This scenario implies the presence of 1 UTRA TDD and 1 UTRA FDD cell as given in Table A.4.5 and A.4.6. The maximum repetition period of the relevant system information blocks that need to be received by the UE to camp on a cell shall be 1280 ms.

Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.5: General test parameters for the TDD/FDD cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

TDD cell

Neighbour cells

Cell2

FDD cell

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

During T1 cell 1 better ranked than cell 2

T2

s

15

During T2 cell 2 better ranked than cell 1

Table A.4.6: TDD/FDD cell re-selection

Parameter

Unit

Cell 1

Cell 2

Timeslot Number

0

8

n.a

n.a.

T1

T2

T 1

T 2

T 1

T 2

UTRA RF Channel Number

Channel 1

Channel 2

CPICH_Ec/Ior

dB

n.a.

n.a.

-10

-10

PCCPCH_Ec/Ior

dB

-3

-3

-12

-12

SCH_Ec/Ior

dB

-9

-9

-9

-9

-12

-12

SCH_toffset

0

0

0

0

n.a.

n.a.

PICH_Ec/Ior

dB

-3

-3

-15

-15

OCNS_EcIor

dB

-3,12

-3,12

-3,12

-3,12

-0,941

-0,941

dB

3

-2

3

-2

-2

3

dBm/3.84 MHz

-70

CPICH_RSCP

dBm

n.a.

n.a.

-82

-77

PCCPCH_RSCP

dBm

-70

-75

n.a.

n.a.

Cell_selection_and reselection_quality _measure

CPICH_RSCP

CPICH_RSCP

Qrxlevmin

dBm

-102

-115

Qoffset1s,n

dB

C1, C2: -12

C2, C1: +12

Qhyst1s

dB

0

0

Treselection

s

0

0

Propagation Condition

AWGN

AWGN

A.4.2.3.1.2 1.28 Mcps TDD option

This test is to verify the requirement for the 1.28 Mcps TDD OPTION/FDD cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 1.28Mps TDD serving cell, and 1 FDD cell to be selected. The UE is requested to monitor neighbouring cells on 1 1.28Mcps TDD carrier and 1 FDD carrier. Test parameters are given in Table A.4.5A, A4.6A, and A.4.6AA.

Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.5A: General test parameters for the TDD/FDD cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

1.28 Mcps TDD OPTION cell

Neighbour cells

Cell2

FDD cell

Final condition

Active cell

Cell2

FDD cell

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

TSI

s

1.28

The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

T2

s

15

Table A.4.6A: Cell 1 specific test parameters for 1.28 Mcps TDD/FDD cell re-selection

Parameter

Unit

Cell 1

Timeslot Number

0

DwPTS

T1

T2

T 1

T 2

UTRA RF Channel Number*

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

DwPCH_Ec/Ior

dB

0

0

OCNS_Ec/Ior

dB

-3

dB

8

2

8

2

PCCPCH_RSCP

dBm

-65

-71

Cell_selection_and_
reselection_quality_measure

CPICH RSCP

Qrxlevmin

dBm

-103

Qoffset1s,n

dB

C1, C2: -12

Qhyst1s

dB

0

Treselection

s

0

Sintersearch

dB

not sent

dBm/1.28 MHz

-70

Propagation Condition

AWGN

* Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

Table A.4.6AA: Cell 2 specific test parameters for 1.28 Mcps TDD/FDD cell re-selection

Parameter

Unit

Cell 2 (UTRA)

T1

T2

UTRA RF Channel Number

Channel 2

CPICH_Ec/Ior

dB

-10

PCCPCH_Ec/Ior

dB

-12

SCH_Ec/Ior

dB

-12

PICH_Ec/Ior

dB

-15

OCNS_Ec/Ior

dB

-0.941

dB

-3

3

CPICH_RSCP

dBm

-83

-77

Cell_selection_and_
reselection_quality_measure

CPICH RSCP

Qrxlevmin

dBm

-115

Qoffset1s, n

dB

C2, C1: +12

Qhyst1

dB

0

Treselection

s

0

Sintersearch

dB

not sent

dBm/3.84 MHz

‑70

Propagation Condition

AWGN

A.4.2.3.1.3 7.68 Mcps TDD option

This test is to verify the requirement for the TDD/FDD cell re-selection delay reported in section 4.2.2.

This scenario implies the presence of 1 UTRA TDD and 1 UTRA FDD cell as given in Table A.4.5B and A.4.6B. The maximum repetition period of the relevant system information blocks that need to be received by the UE to camp on a cell shall be 1280 ms.

Cell 1 and cell 2 shall belong to different Location Areas.

Table A.4.5B: General test parameters for the TDD/FDD cell re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

TDD cell

Neighbour cells

Cell2

FDD cell

Final condition

Active cell

Cell2

HCS

Not used

UE_TXPWR_MAX_RACH

dBm

21

The value shall be used for all cells in the test.

Access Service Class (ASC#0)
‑ Persistence value

1

Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.

DRX cycle length

s

1.28

The value shall be used for all cells in the test.

T1

s

30

During T1 cell 1 better ranked than cell 2

T2

s

15

During T2 cell 2 better ranked than cell 1

Table A.4.6B: TDD/FDD cell re-selection

Parameter

Unit

Cell 1

Cell 2

Timeslot Number

0

8

n.a

n.a.

T1

T2

T 1

T 2

T 1

T 2

UTRA RF Channel Number

Channel 1

Channel 2

CPICH_Ec/Ior

dB

n.a.

n.a.

-10

-10

PCCPCH_Ec/Ior

dB

-3

-3

-12

-12

SCH_Ec/Ior

dB

-9

-9

-9

-9

-12

-12

SCH_toffset

0

0

0

0

n.a.

n.a.

PICH_Ec/Ior

dB

-3

-3

-15

-15

OCNS_EcIor

dB

-3,12

-3,12

-3,12

-3,12

-0,941

-0,941

dB

3

-2

3

-2

-2

3

-70 dBm/7.68 MHz

-70 dBm/3.84 MHz

CPICH_RSCP

dBm

n.a.

n.a.

-82

-77

PCCPCH_RSCP

dBm

-70

-75

n.a.

n.a.

Cell_selection_and reselection_quality _measure

CPICH_RSCP

CPICH_RSCP

Qrxlevmin

dBm

-102

-115

Qoffset1s,n

dB

C1, C2: -12

C2, C1: +12

Qhyst1s

dB

0

0

Treselection

s

0

0

Propagation Condition

AWGN

AWGN

A.4.2.3.2 Test Requirements

A.4.2.3.2.1 3.84 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as: TevaluateFDD + TSI, where:

TevaluateFDD See Table 4.1 in section 4.2.2.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.3.2.2 1.28 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

TevaluateFDD + TSI

where:

TevaluateFDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate FDD of 6.4s according to Table 4.1A in section 4.2.

TSI Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in 25.331 for a UTRAN cell (ms). 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.3.2.3 7.68 Mcps TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.

The cell re-selection delay shall be less than 8 s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE:

The cell re-selection delay can be expressed as:

TevaluateFDD + TSI, where:

TevaluateFDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate FDD of 6.4s according to Table 4.1B in section 4.2.

TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.

This gives a total of 7.68 s, allow 8s in the test case.

A.4.2.4 Scenario 4: inter RAT cell re-selection

A.4.2.4.1 Test Purpose and Environment

A.4.2.4.1.1 3.84 Mcps TDD option

This test is to verify the requirement for the UTRA TDD to GSM cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 UTRA TDD serving cell, and 1 GSM cell to be re-selected. The UE is requested to monitor neighbouring cells on 1 UTRA TDD carrier and 12 GSM cells. Test parameters are given in Table, A.4.7, A.4.8, A.4.9. Cell 1 and Cell 2 shall belong to different Location Areas.

For this test environment the ranking/mapping function indicated in the broadcast of cell 1 shall be in such a way as to enable the UE to evaluate that the TDD cell 1 is better ranked as the GSM cell 2 during T1 and the GSM cell 2 is better ranked than the TDD cell 1 during T2.

Table A.4.7: General test parameters for UTRAN to GSM Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

UTRA TDD Cell

Neighbour cell

Cell2

GSM Cell

Final condition

Active cell

Cell2

HCS

Not used

DRX cycle length

s

1,28

UTRA TDD cell

T1

s

45

T2

s

35

Table A.4.8: Cell re-selection UTRA TDD to GSM cell case (cell 1)

Parameter

Unit

Cell 1 (UTRA TDD)

Timeslot Number

0

8

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

SCH_toffset

0

0

0

0

PICH_Ec/Ior

dB

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

dB

3

-2

3

-2

dBm/3,84 MHz

-70

-70

PCCPCH RSCP

dBm

-70

-75

n.a.

n.a.

Propagation Condition

AWGN

AWGN

Qrxlevmin

dBm

-102

Qoffset1s, n

dB

C1, C2: 0

Qhyst1

dB

0

Treselection

s

0

SsearchRAT

dB

not sent

Table A.4.9: Cell re-selection UTRA TDD to GSM cell case (cell 2)

Parameter

Unit

Cell 2 (GSM)

T1

T2

Absolute RF Channel Number

ARFCN 1

RXLEV

dBm

-90

-75

RXLEV_ACCESS_MIN

dBm

-104

MS_TXPWR_MAX_CCH

dBm

33

A.4.2.4.1.2 1.28 Mcps TDD option

This test is to verify the requirement for the UTRAN to GSM cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 UTRAN serving cell, and 1 GSM cell to be re-selected. Test parameters are given in Table A.4.7A, A.4.8A, A.4.9A.

The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304. Cell 1 and cell 2 shall belong to different location areas.

Table A.4.7A: General test parameters for UTRAN (1.28 Mcps TDD OPTION) to GSM Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

1.28 Mcps TDD OPTION cell

Neighbour cell

Cell2

GSM cell

Final condition

Active cell

Cell2

GSM cell

DRX cycle length

s

1,28

HCS

Not used

T1

s

45

T2

s

15

Table A.4 8A: Cell re-selection UTRAN to GSM cell case (cell 1)

Parameter

Unit

Cell 1 (UTRA)

Timeslot Number

0

DwPTS

T1

T2

T1

T2

UTRA RF Channel Number*

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

DwPCH_Ec/Ior

dB

0

0

OCNS_Ec/Ior

dB

-3

-3

dB

13

-12

13

-12

dBm/1.28 MHz

-80

PCCPCH RSCP

dBm

-70

-95

n.a.

n.a.

Propagation Condition

AWGN

AWGN

Treselection

s

0

SsearchRAT

dB

Not sent

Qrxlevmin

dBm

-103

Qoffset1s,n

dB

C1, C2: 0

Qhyst1s

dB

0

* Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

Table A.4.9A: Cell re-selection UTRAN to GSM cell case (cell 2)

Parameter

Unit

Cell 2 (GSM)

T1

T2

Absolute RF Channel Number

ARFCN 1

RXLEV

dBm

-75

-75

RXLEV_ACCESS_MIN

dBm

-104

MS_TXPWR_MAX_CCH

dBm

33

A.4.2.4.1.3 7.68 Mcps TDD option

This test is to verify the requirement for the UTRA TDD to GSM cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 UTRA TDD serving cell, and 1 GSM cell to be re-selected. The UE is requested to monitor neighbouring cells on 1 UTRA TDD carrier and 12 GSM cells. Test parameters are given in Table, A.4.7B, A.4.8B, A.4.9B. Cell 1 and Cell 2 shall belong to different Location Areas.

For this test environment the ranking/mapping function indicated in the broadcast of cell 1 shall be in such a way as to enable the UE to evaluate that the TDD cell 1 is better ranked as the GSM cell 2 during T1 and the GSM cell 2 is better ranked than the TDD cell 1 during T2.

Table A.4.7B: General test parameters for UTRAN to GSM Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

UTRA TDD Cell

Neighbour cell

Cell2

GSM Cell

Final condition

Active cell

Cell2

HCS

Not used

DRX cycle length

s

1,28

UTRA TDD cell

T1

s

45

T2

s

35

Table A.4.8B: Cell re-selection UTRA TDD to GSM cell case (cell 1)

Parameter

Unit

Cell 1 (UTRA TDD)

Timeslot Number

0

8

T1

T2

T1

T2

UTRA RF Channel Number

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

SCH_Ec/Ior

dB

-9

-9

-9

-9

SCH_toffset

0

0

0

0

PICH_Ec/Ior

dB

-3

-3

OCNS_Ec/Ior

dB

-3,12

-3,12

-3,12

-3,12

dB

3

-2

3

-2

dBm/7,68 MHz

-70

-70

PCCPCH RSCP

dBm

-70

-75

n.a.

n.a.

Propagation Condition

AWGN

AWGN

Qrxlevmin

dBm

-102

Qoffset1s, n

dB

C1, C2: 0

Qhyst1

dB

0

Treselection

s

0

SsearchRAT

dB

not sent

Table A.4.9B: Cell re-selection UTRA TDD to GSM cell case (cell 2)

Parameter

Unit

Cell 2 (GSM)

T1

T2

Absolute RF Channel Number

ARFCN 1

RXLEV

dBm

-90

-75

RXLEV_ACCESS_MIN

dBm

-104

MS_TXPWR_MAX_CCH

dBm

33

A.4.2.4.2 Test Requirements

A.4.2.4.2.1 3.84 Mpcs TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RR Channel Request message for location update to Cell 2.

The cell re-selection delay shall be less than 26 s + TBCCH, where TBCCH is the maximum time allowed to read BCCH data in the GSM cell [21].

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

4 * TmeasureGSM + TBCCH

where:

TmeasureGSM Equal to the value specified in Table 4.1 in section 4.2

TBCCH Equal to 1.9 s, i.e. the maximum time allowed to read BCCH data when synchronised to a BCCH carrier from a GSM cell [21].

This gives a total of 25.6 s + TBCCH, allow 26 s + TBCCH in the test case.

A.4.2.4.2.2 1.28 Mpcs TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send RR Channel Request message to perform a Location update.

The cell re-selection delay shall be less than 8 s + TBCCH where TBCCH is the maximum time allowed to read BCCH data from GSM cell [21].

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

Max(3*TmeasureNTDD , Tmeasure GSM +1DRX)+ TBCCH

where:

TmeasureNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a TmeasureNTDD of 1.28s according to Table 4.1A in section 4.2.

TmeasureGSM A DRX cycle length of 1280ms is assumed for this test case, this leads to a TmeasureGSM of 6.4s according to Table 4.1A in section 4.2.

DRX cycle length 1.28s is assumed, see Table A.4.1A

TBCCH Maximum time allowed to read BCCH data from GSM cell [20].

According to [21], the maximum time allowed to read the BCCH data, when being synchronized to a BCCH carrier, is 1.9 s.

This gives a total of 7.68s +TBCCH, thus allow 8s +TBCCH.

A.4.2.4.2.3 7.68 Mpcs TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the RR Channel Request message for location update to Cell 2.

The cell re-selection delay shall be less than 26 s + TBCCH, where TBCCH is the maximum time allowed to read BCCH data in the GSM cell [21].

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as:

4 * TmeasureGSM + TBCCH

where:

TmeasureGSM Equal to the value specified in Table 4.1B in section 4.2

TBCCH Equal to 1.9 s, i.e. the maximum time allowed to read BCCH data when synchronised to a BCCH carrier from a GSM cell [21].

This gives a total of 25.6 s + TBCCH, allow 26 s + TBCCH in the test case.

A.4.2.4.3 Scenario 4A Test Purpose and Environment

A.4.2.4.3.1 (void)
A.4.2.4.3.2 1.28 Mcps TDD option

This test is to verify the requirement for the UTRAN to GSM cell re-selection delay reported in section 4.2.

This scenario implies the presence of 1 UTRAN serving cell, and 1 GSM cell to be re-selected. Test parameters are given in Table A.4.10A, A.4.11A, A.4.12A.

The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304. Cell 1 and cell 2 shall belong to different location areas.

Table A.4.10A: General test parameters for UTRAN (1.28 Mcps TDD OPTION) to GSM Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

1.28 Mcps TDD OPTION cell

Neighbour cell

Cell2

GSM cell

Final condition

Active cell

Cell2

GSM cell

DRX cycle length

s

1,28

HCS

Not Used

T1

s

45

T2

s

45

Table A.4 11A: Cell re-selection UTRAN to GSM cell case (cell 1)

Parameter

Unit

Cell 1 (UTRA)

Timeslot Number

0

DwPTS

T1

T2

T1

T2

UTRA RF Channel Number (NOTE)

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

DwPCH_Ec/Ior

dB

0

0

OCNS_Ec/Ior

dB

-3

-3

dB

6

6

6

6

dBm/1.28 MHz

-80

PCCPCH RSCP

dBm

-77

-77

Propagation Condition

AWGN

AWGN

Treselection

s

0

SsearchRAT

dB

Not sent

Qrxlevmin

dBm

-103

Qoffset1s,n

dB

C1, C2: 0

Qhyst1s

dB

0

NOTE: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

Table A.4.12A: Cell re-selection UTRAN to GSM cell case (cell 2)

Parameter

Unit

Cell 2 (GSM)

T1

T2

Absolute RF Channel Number

ARFCN 1

RXLEV

dBm

-90

-70

RXLEV_ACCESS_MIN

dBm

-104

MS_TXPWR_MAX_CCH

dBm

33

A.4.2.4.4 Scenario 4A Requirements

A.4.2.4.4.1 (void)
A.4.2.4.4.2 1.28 Mpcs TDD option

The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send RR Channel Request message for location update to Cell 2.

The cell re-selection delay shall be less than 26 s+ TBCCH, where TBCCH is the maximum time allowed to read BCCH data from GSM cell [21].

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The UE shall keep a running average of 4 measurements, thus gives 4* TmeasureGSM +TBCCH, where:

TmeasureGSM A DRX cycle length of 1280ms is assumed for this test case, this leads to a TmeasureGSM of 6.4s according to Table 4.1A in section 4.2.

TBCCH Maximum time allowed to read BCCH data from GSM cell [21].

According to [21], the maximum time allowed to read the BCCH data, when being synchronized to a BCCH carrier, is 1.9 s.

This gives a total of 25.6s +TBCCH, thus allow 26s +TBCCH.

A.4.2.4.5 Scenario 4B: HCS with only UTRA level changed

A.4.2.4.5.1 Test Purpose and Environment
A.4.2.4.5.1.1 3.84 Mcps TDD option

Void.

A.4.2.4.5.1.2 1.28 Mcps TDD option

This test is to verify the requirement for the UTRAN to GSM cell re-selection delay reported in section 4.2 when measurement rules according to HCS is used.

This scenario implies the presence of 1 UTRAN serving cell, and 1 GSM cell to be re-selected. Test parameters are given in Table A.4.13B, A.4.14B, A.4.15B.

Cell 1 and cell 2 shall belong to different location areas.

Table A.4.13B: General test parameters for UTRAN (1.28 Mcps TDD option) to GSM Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell1

1.28 Mcps TDD option cell

Neighbour cell

Cell2

GSM cell

Final condition

Active cell

Cell2

GSM cell

DRX cycle length

s

1,28

HCS

Used

T1

s

45

T2

s

45

Table A.4 14B: Cell re-selection UTRAN to GSM cell case (cell 1)

Parameter

Unit

Cell 1 (UTRA)

Timeslot Number

0

DwPTS

T1

T2

T1

T2

UTRA RF Channel Number (NOTE)

Channel 1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

DwPCH_Ec/Ior

dB

0

0

OCNS_Ec/Ior

dB

-3

-3

dB

13

-12

13

-12

dBm/1.28 MHz

-80

PCCPCH RSCP

dBm

-70

-95

Propagation Condition

AWGN

AWGN

Treselection

s

0

SsearchRAT

dB

Not sent

Qrxlevmin

dBm

-103

Qoffset1s,n

dB

C1, C2: 0

Qhyst1s

dB

0

Treselection

s

0

SsearchRAT

dB

0

Penalty_time

s

0 (default value)

HCS_PRIO

0 (default value)

Qhcs

0 (default value)

TCrmax

s

not used (default value)

NOTE: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

Table A.4.15B: Cell re-selection UTRAN to GSM cell case (cell 2)

Parameter

Unit

Cell 2 (GSM)

T1

T2

Absolute RF Channel Number

ARFCN 1

RXLEV

dBm

-80

-80

RXLEV_ACCESS_MIN

dBm

-104

MS_TXPWR_MAX_CCH

dBm

33

Qsearch_I

always

A.4.2.4.5.1.3 7.68 Mcps TDD option

Void.

A.4.2.4.5.2 Requirements
A.4.2.4.5.2.1 3.84 Mcps TDD option

Void.

A.4.2.4.5.2.2 1.28 Mcps TDD option

The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a cell, and starts to send LOCATION UPDATING REQUEST message to perform a Location update to the new cell.

The cell re-selection delay shall be less than 37.7 s+ TBCCH, where TBCCH is the maximum time allowed to read BCCH data from GSM cell.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay can be expressed as: 30 s + TmeasureGSM + DRX cycle length + TBCCH, where::

TmeasureGSM A DRX cycle length of 1280ms is assumed for this test case, this leads to a TmeasureGSM of 6.4s according to Table 4.1A in section 4.2.

DRX cycle length A DRX cycle length of 1280ms is assumed for this test case.

TBCCH Maximum time allowed to read BCCH data from GSM cell.

The maximum time allowed to read the BCCH data, when being synchronized to a BCCH carrier, is 1.9 s.

This gives a total of 37.68 s +TBCCH, thus allow 37.7 s +TBCCH.

A.4.2.4.5.2.3 7.68 Mcps TDD option

Void.

A.4.2.5 Scenario 5: TDD/E-UTRA cell re-selection

A.4.2.5.1 UTRA to E-UTRA TDD cell re-selection: E-UTRA is of higher priority

A.4.2.5.1.1 Test Purpose and Environment
A.4.2.5.1.1.1 3.84 Mcps TDD option
A.4.2.5.1.1.2 1.28 Mcps TDD option

This test is to verify the requirement for the UTRA TDD to E-UTRA TDD inter-RAT cell re-selection requirements specified in section 4.2.2.5a when the E-UTRA cell is of higher priority.

This test scenario comprised of 1 UTRA TDD serving cell, and 1 E-UTRA TDD cell to be re-selected. Test parameters are given in table A.4.2.5.1.1.2-1, A.4.2.5.1.1.2-2, and A.4.2.5.1.1.2-3. The test consists of three successive time periods, with time duration of T1, T2 and T3 respectively. UTRA cell 1 is already identified by the UE prior to the start of the test. At T1 the UE is camped on to cell 1. Cell 2 is of higher priority than cell 1.

The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304.

Table A.4.2.5.1.1.2-1: General test parameters for UTRAN (1.28 Mcps TDD OPTION) to E-UTRAN TDD Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell 1

UE is on cell 1 in the initialisation phase, so that reselection to cell 2 occurs during the first T2 phase

T2 end condition

Active cell

Cell 2

UE shall perform reselection to cell 2 during T2

Neighbour cell

Cell 1

UTRA 1.28 Mcps TDD option cell

T3 end condition

Active cell

Cell 1

UE shall perform reselection to cell 1 during T3

Neighbour cell

Cell 2

E-UTRA TDD cell

Uplink-downlink configuration of cell 2

1

As specified in table 4.2.2 in TS 36.211

Special subframe configuration of cell 2

6

As specified in table 4.2.1 in TS 36.211

PRACH configuration of cell 2

53

As specified in table 4.7.1-3 in TS 36.211

CP length of cell 2

Normal

Time offset between cells

3 ms

Asynchronous cells

Access Barring Information

Not sent

No additional delays in random access procedure.

Treselection

s

0

DRX cycle length

s

1,28

HCS

Not used

T1

s

>20

During T1, cell 2 shall be powered off, and during the off time the physical layer cell identity shall be changed, The intention is to ensure that cell 2 has not been detected by the UE prior to the start of period T2

T2

s

85

T2 need to be defined so that cell re-selection reaction time is taken into account.

T3

s

25

T3 need to be defined so that cell re-selection reaction time is taken into account.

Table A.4.2.5.1.1.2-2: Cell specific test parameters for cell re-selection UTRA TDD to E-UTRA TDD test case (cell 1)

Parameter

Unit

Cell 1 (UTRA)

Timeslot Number

0

DwPTS

T1

T2

T3

T1

T2

T3

UTRA RF Channel Number Note1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

-3

DwPCH_Ec/Ior

dB

0

0

0

OCNS_Ec/Ior

dB

-3

-3

-3

dB

11

11

11

11

11

11

dBm/1.28 MHz

-80

PCCPCH RSCP

dBm

-72

-72

-72

n.a.

Propagation Condition

AWGN

Qrxlevmin

dBm

-103

Qoffset1s,n

dB

C1, C2: 0

Qhyst1s

dB

0

Threshx, high Note2

dB

46 (-94dBm)

Sprioritysearch1

dB

24 (-79dBm)

Sprioritysearch2

dB

0

SsearchE-UTRA

dB

Not send

Note1: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

Note2: This refers to the value of Threshx, high which is included in UTRA system information, and is a threshold for the E-UTRA target cell

Table A.4.2.5.1.1.2-3: Cell specific test parameters for cell re-selection UTRA TDD to E-UTRA TDD test case (cell 2)

Parameter

Unit

Cell 2

T1

T2

T3

E-UTRA RF Channel Number

2

BWchannel

MHz

10

PBCH_RA

dB

0

0

0

PBCH_RB

dB

PSS_RB

dB

SSS_RB

dB

PCFICH_PA

dB

PHICH_PA

dB

PHICH_PB

dB

PDCCH_PA

dB

PDCCH_PB

dB

PDSCH_PA

dB

PDSCH_PB

dB

OCNG_RANote 1

dB

OCNG_RBNote 1

dB

Qrxlevmin

dBm/15kHz

-140

-140

-140

dBm/15kHz

-98

RSRP

dBm/15kHz

-inf

-87

-101

dB

-inf

11

-3

Snonintrasearch

dB

Not sent

Threshserving, low

dB

46 (-94dBm)

Threshx, low Note2

dB

24 (-79dBm)

Propagation Condition

AWGN

Note 1: OCNG shall be used such that cell is fully allocated and a constant total transmitted power spectral density is achieved for all OFDM symbols.

Note2: This refers to the value of Threshx, low which is included in E-UTRA system information, and is a threshold for the UTRA target cell

A.4.2.5.1.1.3 7.68 Mcps TDD option
A.4.2.5.1.2 Test Requirements
A.4.2.5.1.2.1 3.84 Mpcs TDD option
A.4.2.5.1.2.2 1.28 Mpcs TDD option

The cell reselection delay to higher priority is defined as the time from the beginning of time period T2, to the moment when the UE camps on cell 2, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message on cell 2.

The cell re-selection delay to higher priority shall be less than 81s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay to higher priority cell can be expressed as: Thigher_priority_search + TevaluateE-UTRA + TSI,

Where:

Thigher_priority_search 60s, See section 4.2.2.5a

TevaluateE-UTRA 19.2s, See Table 4.2A in section 4.2.2.7

TSI Maximum repetition period of relevant system info blocks that needs to be received by the UE to camp on a cell; 1280 ms is assumed in this test case.

This gives a total of 80.48 s, allow 81 s for higher priority cell reselection in the test case.

A.4.2.5.1.2.3 7.68 Mpcs TDD option

A.4.2.5.2 UTRA to E-UTRA TDD cell re-selection: E-UTRA is of lower priority

A.4.2.5.2.1 Test Purpose and Environment
A.4.2.5.2.1.1 3.84 Mcps TDD option
A.4.2.5.2.1.2 1.28 Mcps TDD option

This test is to verify the requirement for the UTRA TDD to E-UTRA TDD inter-RAT cell re-selection requirements specified in section 4.2.2.5a when the E-UTRA cell is of lower priority.

This test scenario comprised of 1 UTRA TDD serving cell, and 1 E-UTRA TDD cell to be re-selected. Test parameters are given in table A.4.2.5.2.1.2-1, A.4.2.5.2.1.2-2, and A.4.2.5.2.1.2-3. The test consists of two successive time periods, with time duration of T1 and T2 respectively. At T1 the UE is camped on to cell 1. Cell 2 is of lower priority than cell 1.

The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304.

Table A.4.2.5.2.1.2-1: General test parameters for UTRAN (1.28 Mcps TDD OPTION) to E-UTRAN TDD Cell Re-selection

Parameter

Unit

Value

Comment

Initial condition

Active cell

Cell 1

UTRA 1.28 Mcps TDD option cell

T1 end condition

Active cell

Cell1

UE shall perform reselection to cell 1 during T1 for subsequent iterations of the test.

Neighbour cell

Cell2

E-UTRA TDD cell

T2 end condition

Active cell

Cell2

UE shall perform reselection to cell 2 during T2

Neighbour cell

Cell1

UTRA 1.28 Mcps TDD option cell

Uplink-downlink configuration of cell 2

1

As specified in table 4.2.2 in TS 36.211

Special subframe configuration of cell 2

6

As specified in table 4.2.1 in TS 36.211

PRACH configuration of cell 2

53

As specified in table 4.7.1-3 in TS 36.211

CP length of cell 2

Normal

Time offset between cells

3 ms

Asynchronous cells

Access Barring Information

Not sent

No additional delays in random access procedure.

Treselection

s

0

DRX cycle length

s

1,28

HCS

Not used

T1

s

85

T1 need to be defined so that cell re-selection reaction time is taken into account.

T2

s

25

T2 need to be defined so that cell re-selection reaction time is taken into account.

Table A.4.2.5.2.1.2-2: Cell specific test parameters for cell re-selection UTRA TDD to E-UTRA TDD test case (cell 1)

Parameter

Unit

Cell 1 (UTRA)

Timeslot Number

0

DwPTS

T1

T2

T1

T2

UTRA RF Channel Number Note1

Channel 1

PCCPCH_Ec/Ior

dB

-3

-3

DwPCH_Ec/Ior

dB

0

0

OCNS_Ec/Ior

dB

-3

-3

dB

11

-3

11

-3

dBm/1.28 MHz

-80

PCCPCH RSCP

dBm

-72

-86

n.a.

n.a.

Propagation Condition

AWGN

Qrxlevmin

dBm

-103

Qoffset1s,n

dB

C1, C2: 0

Qhyst1s

dB

0

Threshserving, low

dB

24 (-79dBm)

Threshx, low Note2

dB

46 (-94dBm)

Sprioritysearch1

dB

62

Sprioritysearch2

dB

0

SsearchE-UTRA

dB

Not send

Note1: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.

Note2: This refers to the value of Threshx, low which is included in UTRA system information, and is a threshold for the E-UTRA target cell

Table A.4.2.5.2.1.2-3: Cell specific test parameters for cell re-selection UTRA TDD to E-UTRA TDD test case (cell 2)

Parameter

Unit

Cell 2

T1

T2

E-UTRA RF Channel Number

2

BWchannel

MHz

10

PBCH_RA

dB

0

0

PBCH_RB

dB

PSS_RB

dB

SSS_RB

dB

PCFICH_PA

dB

PHICH_PA

dB

PHICH_PB

dB

PDCCH_PA

dB

PDCCH_PB

dB

PDSCH_PA

dB

PDSCH_PB

dB

OCNG_RANote1

dB

OCNG_RBNote1

dB

Qrxlevmin

dBm/15kHz

-140

-140

dBm/15kHz

-98

RSRP

dBm/15kHz

-87

-87

dB

11

11

Threshx, high Note2

dB

24(-79dBm)

Snonintrasearch

dB

46

Propagation Condition

AWGN

Note1: OCNG shall be used such that cell is fully allocated and a constant total transmitted power spectral density is achieved for all OFDM symbols.

Note2: This refers to the value of Threshx, high which is included in E-UTRA system information, and is a threshold for the UTRA target cell

A.4.2.5.2.1.3 7.68 Mcps TDD option
A.4.2.5.2.2 Test Requirements
A.4.2.5.2.2.1 3.84 Mpcs TDD option
A.4.2.5.2.2.2 1.28 Mpcs TDD option

The cell reselection delay to lower priority is defined as the time from the beginning of time period T2, to the moment when the UE camps on cell 2, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message on cell 2.

The cell re-selection delay to lower priority shall be less than 21s.

The rate of correct cell reselections observed during repeated tests shall be at least 90%.

NOTE: The cell re-selection delay to lower priority cell can be expressed as: TevaluateE-UTRA + TSI,

Where:

TevaluateE-UTRA 19.2s, See Table 4.2A in section 4.2.2.7

TSI Maximum repetition period of relevant system info blocks that needs to be received by the UE to camp on a cell; 1280 ms is assumed in this test case.

This gives a total of 20.48 s, allow 21 s for lower priority cell reselection in the test case.

A.4.2.5.2.2.3 7.68 Mpcs TDD option