N.3 Testing MSRD terminal conformance to legacy requirements

3GPP45.005GSM/EDGE Radio transmission and receptionTS

When testing the conformance of a dual antenna terminal against the single antenna requirements the following procedures shall be applied.

– For an MS that always applies MSRD, conformance to legacy requirements shall be tested by applying uncorrelated signals to the antenna connectors. This corresponds to setting and in the model shown in figure N.2.1 and thus reduces the model to the one shown in figure N.3.1.

– For an MS capable of switching between single and dual antenna reception conformance shall be tested by terminating one of the antenna connectors, as shown in figure N.3.2.

Figure N.3.1: Test setup when testing conformance to legacy requirements for MS having MSRD always enabled.

Figure N.3.2: Test setup when testing conformance to legacy requirements for MS capable of switching between single and dual antenna reception.

Here, the term legacy requirements signify any non DARP – Phase II requirements.

Annex O (normative):
Minimum Performance Requirements for Assisted Galileo and Additional Navigation Satellite Systems (A-GANSS)

This Annex defines the minimum performance requirements for A-GANSS for MSs that support A-GANSS. It includes the minimum performance requirements for both MS based and MS assisted A‑GANSS terminals. The minimum performance requirements also include combinations of A-GPS and A-GANSS.