11.1.3a MO MMTEL enhanced voice service call setup from NR RRC_CONNECTED / EPS Fallback with handover / Single registration mode with N26 interface / Success
38.523-13GPP5GSPart 1: ProtocolRelease 17TSUser Equipment (UE) conformance specification
11.1.3a.1 Test Purpose (TP)
(1)
with { UE supporting both S1 mode and N1 mode and configured to use preconditions and configured to use the EVS default configuration and the UE is in NR RRC_CONNECTED state }
ensure that {
when { User initiates a MMTEL call, the MO IMS voice call has been initiated and the UE receives a MobilityFromNRCommand message which includes targetRAT-Type set to eutra an RRCRelease message which includes redirectedCarrierInfo indicating redirection to E-UTRA }
then { UE performs a handover to the E-UTRA including a TAU procedure, and, successfully completes the voice call setup in EPS using EVS}
}
11.1.3a.2 Conformance requirements
References: The conformance requirements covered in the present TC are specified in: TS 38.331 clause 5.4.3.3, 5.4.3.4 and TS 26.114 clause 5.2.1.1.
[TS 38.331, clause 5.4.3.3]
The UE shall:
1> if T390 is running:
2> stop timer T390 for all access categories;
2> perform the actions as specified in 5.3.14.4;
1> if the targetRAT-Type is set to eutra:
2> consider inter-RAT mobility as initiated towards E-UTRA;
2> forward the nas-SecurityParamFromNR to the upper layers, if included;
1> access the target cell indicated in the inter-RAT message in accordance with the specifications of the target RAT.
[TS 38.331, clause 5.4.3.4]
Upon successfully completing the handover, at the source side the UE shall:
1> reset MAC;
1> stop all timers that are running;
1> release ran-NotificationAreaInfo, if stored;
1> release the AS security context including the KRRCenc key, the KRRCint key, the KUPint key and the KUPenc key, if stored;
1> release all radio resources, including release of the RLC entity and the MAC configuration;
1> if the E-UTRA RRCConnectionReconfiguration message included in the received MobilityFromNRCommand does not include fullConfig:
2> maintain source RAT configuration of PDCP and SDAP for applicable RBs which is used for target RAT RBs;
1> else:
2> release the associated PDCP entity and SDAP entity for all established RBs;
1> indicate the release of the RRC connection to upper layers together with the release cause ‘other’.
[TS 26.114, clause 5.2.1.1]
MTSI clients in terminals offering speech communication shall support narrowband, wideband and super-wideband communication.
…
MTSI clients in terminals offering super-wideband or fullband speech communication shall support:
– EVS codec …
11.1.3a.3 Test Description
11.1.3a.3.1 Pre-test conditions
System Simulator:
– NR Cell 1, E-UTRA Cell 1.
– System information for the NR Cell 1 in accordance with combination NR-6 in TS 38.508-1 [4] sub-clause 4.4.3.1.2, and, for the E-UTRA Cell 1 in accordance with system information combination 31 as defined in TS 36.508 [7], subclause 4.4.3.1.1.
– Power levels are constant and as defined in Tables 11.1.3a.3.1-1/2.
Table 11.1.3a.3.1-1: Time instances of cell power level and parameter changes for FR1
Parameter name |
Unit |
NR Cell 1 |
E-UTRA Cell 1 |
Remark |
|
T0 |
SS/PBCH SSS EPRE |
dBm/SCS |
-88 |
||
RS EPRE |
dBm/15kHz |
-85 |
Table 11.1.3a.3.1-2: Time instances of cell power level and parameter changes for FR2
Parameter name |
Unit |
NR Cell 1 |
E-UTRA Cell 1 |
Remark |
|
T0 |
SS/PBCH SSS EPRE |
dBm/SCS |
-82 |
– |
|
RS EPRE |
dBm/15kHz |
– |
-85 |
UE:
– The UE is configured to use preconditions.
Preamble:
– With E-UTRA Cell 1 "Serving cell" and NR Cell 1 "Non-suitable "Off" cell" in accordance with TS 38.508-1 [4], Table 6.2.2.1-3, the UE is brought to state RRC_IDLE using generic procedure parameters Connectivity (E-UTRA/EPC) and Unrestricted nr PDN (On) in accordance with the procedure described in TS 38.508-1 [4], clause 4.5.2. 4G GUTI and eKSI are assigned and security context established.
– the UE is switched-off.
– With E-UTRA Cell 1 "Non-suitable "Off" cell" and NR Cell 1 "Serving cell" in accordance with TS 38.508-1 [4], Table 6.2.2.1-3, the UE is brought to state 1N-A, RRC_IDLE Connectivity (NR), in accordance with the procedure described in TS 38.508-1 [4], Table 4.5.2.2-2. 5G-GUTI and ngKSI are assigned and security context established.
11.1.3a.3.2 Test procedure sequence
Table 11.1.3a.3.2-1: Main behaviour
St |
Procedure |
Message Sequence |
TP |
Verdict |
|
U – S |
Message |
||||
– |
The following messages are to be observed on NR Cell 1 unless explicitly stated otherwise. |
– |
– |
– |
– |
1 |
The SS transmits a Paging message. |
<– |
NR RRC: Paging |
– |
– |
2 |
The UE transmits an RRCSetupRequest message. |
–> |
NR RRC: RRCSetupRequest |
– |
– |
3-7 |
Steps 3 to 8 of the NR RRC_CONNECTED procedure in TS 38.508-1 [4] Table 4.5.4.2-3 are executed to successfully complete the service request procedure. |
– |
– |
– |
– |
8 |
Set the power levels according to “T0” as per Table 11.1.3a.3.1-1/2. |
– |
– |
– |
– |
9 |
Make the UE attempt an IMS voice call. |
– |
– |
– |
– |
10-14 |
Steps 1-5 of expected sequence from A.4.1a as defined in TS 34.229-5 [41] are performed for initiating an MTSI MO speech call. |
– |
– |
– |
– |
15 |
The SS transmits a MobilityFromNRCommand message which includes targetRAT-Type set to eutra according to 38.508-1 [4] Table 4.6.1-8. |
<– |
NR RRC: MobilityFromNRCommand |
– |
– |
– |
The following messages are to be observed on E-UTRA Cell 1 unless explicitly stated otherwise. |
– |
– |
– |
– |
16 |
Check: Does the UE transmit an RRCConnectionReconfigurationComplete message to confirm the successful completion of handover? |
–> |
RRC: RRCConnectionReconfigurationComplete |
1 |
P |
17 |
The UE transmits an ULInformationTransfer message on the cell specified in the test case. This message includes a TRACKING AREA UPDATE REQUEST message. |
–> |
RRC: ULInformationTransfer NAS: TRACKING AREA UPDATE REQUEST |
1 |
P |
18-21 |
Steps 4a1-6 of the generic test procedure in TS 38.508-1 [4] Table 4.9.7.2.2-1 for N1 to S1 Inter mode change with condition ‘connected without release’ & ‘mapped 5G security context’ are performed to make sure successfully camped on E-UTRAN cell upon mobility from NR. |
– |
– |
– |
– |
22 |
The SS configures a new RLC-UM data radio bearer with condition DRB (0,1), associated with the dedicated EPS bearer context. RRCConnectionReconfiguration message contains the ACTIVATE DEDICATED EPS BEARER CONTEXT REQUEST message. EPS bearer context #4 (QCI 1) according to TS 36.508 [7] Table 6.6.2-1: Reference dedicated EPS bearer contexts. Reference dedicated EPS bearer contexts is to establish the dedicated EPS bearer context on IMS PDN. |
<– |
RRC: RRCConnectionReconfiguration NAS: ACTIVATE DEDICATED EPS BEARER CONTEXT REQUEST |
– |
– |
– |
EXCEPTION: In parallel to the events described in steps 23-24 the steps specified in table 11.1.3a.3.2-2 will take place. |
– |
– |
– |
– |
23 |
The UE transmits an RRCConnectionReconfigurationComplete message. |
–> |
RRC: RRCConnectionReconfigurationComplete |
– |
– |
24 |
The UE transmits an ULInformationTransfer message including the ACTIVATE DEDICATED EPS BEARER CONTEXT ACCEPT message. |
–> |
RRC: ULInformationTransfer NAS: ACTIVATE DEDICATED EPS BEARER CONTEXT ACCEPT |
– |
– |
24A |
The SS waits 1 second for call duration. |
– |
– |
– |
– |
25 |
Release IMS Call as specified in the generic procedure in TS 34.229-1 [35] subclause C.32. |
– |
– |
– |
– |
Table 11.1.3a.3.2-2: Parallel behaviour
St |
Procedure |
Message Sequence |
TP |
Verdict |
|
U – S |
Message |
||||
1-6 |
Steps 6-11 of expected sequence from A.4.1a as defined in TS 34.229-5 [41] are performed for initiating an MTSI MO speech call. |
– |
– |
– |
– |
7 |
Step 12 of expected sequence from A.4.1a as defined in TS 34.229-5 [41] is performed for initiating an MTSI MO speech call. |
– |
– |
1 |
P |
11.1.3a.3.3 Specific message contents
Table 11.1.3a.3.3-1: REGISTRATION REQUEST (preamble, Table 11.1.3a.3.2-1)
Derivation path: TS 38.508-1 [4] Table 4.7.1-6 |
|||
Information Element |
Value/remark |
Comment |
Condition |
5GMM capability |
|||
S1 mode |
‘1’B |
S1 mode supported |
|
S1 UE network capability |
Present but contents not checked |
Table 11.1.3a.3.3-2: REGISTRATION ACCEPT (preamble, Table 11.1.3a.3.2-1)
Derivation path: TS 38.508-1 [4] Table 4.7.1-7 |
|||
Information Element |
Value/remark |
Comment |
Condition |
5GS network feature support |
|||
IMS- VoPS-3GPP |
‘1’B |
IMS voice over PS session supported over 3GPP access |
|
IWK N26 |
‘0’B |
Interworking without N26 interface not supported |
Table 11.1.3a.3.3-3: PDU SESSION ESTABLISHMENT ACCEPT (preamble for PDU Session for PS data, Table 11.1.3a.3.2-1)
Derivation path: TS 38.508-1 [4] Table 4.7.2-2, condition Interworking_with_EPS |
Table 11.1.3a.3.3-4: PDU SESSION ESTABLISHMENT ACCEPT (preamble for IMS PDU Session, Table 11.1.3a.3.2-1)
Derivation path: TS 38.508-1 [4] Table 4.7.2-2, condition Interworking_with_EPS, IMS_DNN_ Requested |
Table 11.1.3a.3.3-5: MobilityFromNRCommand (step 15, Table 11.1.3a.3.2-1)
Derivation path: TS 38.508-1 [4] Table 4.6.1-8 |
|||
Information Element |
Value/remark |
Comment |
Condition |
MobilityFromNRCommand::= SEQUENCE { |
|||
rrc-TransactionIdentifier |
RRC-TransactionIdentifier |
||
criticalExtensions CHOICE { |
|||
mobilityFromNRCommand SEQUENCE { |
|||
targetRAT-Type |
eutra |
||
targetRAT-MessageContainer |
RRCConnectionReconfig uration |
||
nas-SecurityParamFromNR |
8 LSB of the downlink NAS COUNT |
||
} |
|||
} |
|||
} |
|||
} |
Table 11.1.3a.3.3-6: RRCConnectionReconfiguration (Table 11.1.3a.3.3-5)
Derivation path: TS 36.508-1 [4], Table 4.6.1-8 condition HO-TO-EUTRA(n,0) |
Table 11.1.3a.3.3-7: MobilityControlInfo (Table 11.1.3a.3.3-6)
Derivation path: TS 36.508 [7], Table 4.6.5-1 |
|||
Information Element |
Value/remark |
Comment |
Condition |
MobilityControlInfo ::= SEQUENCE { |
|||
targetPhysCellId |
PhysicalCellIdentity of E-UTRA Cell 1 |
||
carrierFreq SEQUENCE { |
|||
dl-CarrierFreq |
Same downlink EARFCN as used for E-UTRA Cell 1 |
||
} |
|||
carrierFreq |
Not present |
Band > 64 |
|
carrierBandwidth SEQUENCE { |
|||
dl-Bandwidth |
Downlink system bandwidth under test. |
||
ul-Bandwidth |
Uplink Bandwidth under test. |
FDD |
|
ul-Bandwidth |
Not present |
TDD |
|
} |
|||
additionalSpectrumEmission |
1 |
HO-to-EUTRA |
|
carrierFreq-v9e0 SEQUENCE { |
Band > 64 |
||
dl-CarrierFreq-v9e0 |
Same downlink EARFCN as used for E-UTRA Cell 1 |
||
} |
|||
} |
Condition |
Explanation |
FDD |
FDD cell environment |
TDD |
TDD cell environment |
Band > 64 |
If band > 64 is selected |
Table 11.1.3a.3.3-8: TRACKING AREA UPDATE REQUEST (step 17, Table 11.1.3a.3.2-1)
Derivation Path: TS 38.508-1 [4] Table 4.9.7.2.3-1. |
|||
Information Element |
Value/remark |
Comment |
Condition |
EPS update type |
|||
"Active" flag |
AnyValue |
||
EPS bearer context status |
Not checked |
EBI corresponding to active PDU Sessions need to be set to 1 |