B.5 Monitoring of Power, Energy and Environmental (PEE) parameters

32.4053GPPPerformance Management (PM)Performance measurementsRelease 17Telecommunication managementTSUniversal Terrestrial Radio Access Network (UTRAN)

Power, Energy and Environmental (PEE) parameters, combined with data volume measurements, are valuable information for operators to measure the energy efficiency (EE) of their UTRA network. Hence it is necessary to define performance measurements related to UTRAN PEE parameters such as power, energy, temperature, voltage, current, humidity.

Annex C (informative):
Change history

Change history

Date

TSG #

TSG Doc.

CR

Rev

Subject/Comment

Cat

Old

New

Sep 2007

SA_37

SP-070613

0031

Correct ISCP (Interference Signal Code Power) measurements for TDD – Align with 25.123 Requirements for support of radio resource management (TDD)

F

7.5.0

7.6.0

Sep 2007

SA_37

SP-070614

0032

Add RNC processor usage related measurements

B

7.6.0

8.0.0

Dec 2007

SA_38

SP-070734

0035

Correct measurements about the transmitted carrier power not used for HSPA transmission for TDD – Align with 25.225

A

8.0.0

8.1.0

Dec 2007

SA_38

SP-070744

0036

Add measurements related to E-DCH active set

B

8.0.0

8.1.0

Dec 2007

SA_38

SP-070744

0037

Add measurements related to serving E-DCH cell change

B

8.0.0

8.1.0

Dec 2007

SA_38

SP-070744

0038

Add measurements related to HSUPA users

B

8.0.0

8.1.0

Dec 2007

SA_38

SP-070744

0039

Add measurements related to HSUPA setup

B

8.0.0

8.1.0

Mar 2008

SP-39

SP-080069

0040

Correct measurement name for abnormal RB releases for HS-DSCH – Replace HS by HSDPA

F

8.1.0

8.2.0

Mar 2008

SP-39

SP-080069

0041

Add measurements related to channel switches between E-DCH and RACH/DCH – Channel switch success rate for HSUPA

B

8.1.0

8.2.0

Mar 2008

SP-39

SP-080069

0042

Add measurements related to MAC-e feedback decoding – HSUPA retransmission efficiency

B

8.1.0

8.2.0

Mar 2008

SP-39

SP-080069

0043

Add measurement related to octets of acknowledged MAC-e PDUs – HSUPA data volume

B

8.1.0

8.2.0

Mar 2008

SP-39

SP-080069

0044

Add measurements related to HSUPA release

B

8.1.0

8.2.0

Jun 2008

SP-40

SP-080328

0046

Correct measurements related to TDD UTRAN cell Radio Frequency Carrier

A

8.2.0

8.3.0

Sep 2008

SP-41

SP-080465

0047

Correct measurements related to Mac-d setups for HSUPA

F

8.3.0

8.4.0

Sep 2008

SP-41

SP-080465

0048

Correct measurements related to channel switch between RACH/DCH and E-DCH

F

8.3.0

8.4.0

Sep 2008

SP-41

SP-080465

0049

1

Change name and definition of measurements related to serving E-DCH cell change

F

8.3.0

8.4.0

Sep 2008

SP-41

SP-080465

0050

1

Add measurements related to serving E-DCH cell change

B

8.3.0

8.4.0

Mar 2009

SP-43

SP-090207

0051

Add Cell Unavailable Time Measurements

C

8.4.0

8.5.0

Mar 2009

SP-43

SP-090207

0052

Addition of MBMS data volume related measurements

B

8.4.0

8.5.0

Mar 2009

SP-43

SP-090207

0053

Inclusion of WB-AMR Rates

C

8.4.0

8.5.0

Jun 2009

SP-44

SP-090290

0054

Addition of MBMS session related measurements

F

8.5.0

9.0.0

Sep 2009

SP-45

SP-090627

0055

Add performance measurements for Dual-Cell HSDPA

B

9.0.0

9.1.0

Dec 2009

SP-46

SP-090719

0056

Addition of P-CCPCH RSCP related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0057

Addition of UTRAN RSCP related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0058

Addition of UE timing advance related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0059

Addition of UTRAN AOA value related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0060

Addition of UE timeslot ISCP related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0061

Addition of UTRAN timeslot ISCP related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0062

Addition of UE transmitted power related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0063

Addition of UpPTS interference related measurements

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0064

Add RAB establishment related performance measurements according to data rates

B

9.1.0

9.2.0

Dec 2009

SP-46

SP-090719

0065

Add performance measurements for hspa evolution

B

9.1.0

9.2.0

Mar 2010

SP-47

SP-100036

0066

Addition of SIR related measurements

B

9.2.0

10.0.0

Mar 2010

SP-47

SP-100036

0067

Addition of Bit Error Rate and BLER related measurements

B

9.2.0

10.0.0

May 2011

SP-52

SP-110286

0068

Addition of Iurg related performance measurements

B

10.0.0

11.0.0

Mar 2012

SP-55

SP-120056

0069

1

Add energy saving cause to UTRAN measurements

B

11.0.0

11.1.0

Dec 2012

Correction of History table (MCC)

11.1.0

11.1.1

Sep 2014

SP-65

SP-140556

0074

1

Correction of scope

A

11.1.1

11.2.0

2014-10

Update to Rel-12 version (MCC)

11.2.0

12.0.0

2015-09

SP-69

SP-150414

0077

1

Add usage of measurements supporting EE coverage KPI

C

12.0.0

13.0.0

2015-12

SP-70

SP-150785

0078

2

Add measurement on RRC connection usage per UE capability

B

13.0.0

13.1.0

2017-03

SA#75

Promotion to Release 14 without technical change

13.1.0

14.0.0

Change history

Date

Meeting

TDoc

CR

Rev

Cat

Subject/Comment

New version

2018-03

SA#79

SP-180060

0079

B

Introduction of power, energy and environment related measurements and related use case description.

15.0.0

2020-07

Update to Rel-16 version (MCC)

16.0.0

2022-04

Update to Rel-17 version (MCC)

17.0.0