1 Scope
28.3063GPPControl and monitoring of Power, Energy and Environmental (PEE) parameters Integration Reference Point (IRP)Release 17Solution Set (SS) definitionsTS
The present document specifies the Solution Set definitions for the control and monitoring of Power, Energy and Environmental (PEE) parameters Integration Reference Point (IRP).
The Solution Set definitions are related to 3GPP TS 28.305 V15.0.X [2].