1 Scope
25.4213GPPRelease 17TSUTRAN Iur interface layer 1
The present document specifies the standards allowed to implement Layer 1 on the Iur interface. The specification of transmission delay requirements and O&M requirements are not in the scope of this document.
In the following ‘Layer 1’ and ‘Physical Layer’ are assumed to be synonymous.