A.4 SRVCC from GERAN / UTRAN to E-UTRAN / UTRAN (HSPA)
23.2163GPPRelease 16Single Radio Voice Call Continuity (SRVCC)Stage 2TS
GERAN/UTRAN may determine the NCL, as well as the need to signal a CS to PS SRVCC indication, as follows:
– If the "CS to PS SRVCC operation possible" indication is set to "true" (i.e. both the network and UE are CS to PS SRVCC capable, and a valid IMS registration via PS still exists), and the UE has indicated in Radio Access Capabilities support for CS to PS SRVCC to this RAT, then VoIP-capable cells may be included as candidate target cells in the NCL, regardless of the presence of an established TS 11 bearer for this UE. Moreover:
– if there is an established TS 11 bearer for this UE and the selected target cell is VoIP-incapable, then GERAN/UTRAN does not indicate that the handover is for CS to PS in the Handover Required message;
– if there is an established TS 11 bearer for this UE and the selected target cell is VoIP-capable, then GERAN/UTRAN indicates that the handover is for CS to PS in the Handover Required message;
– if there is no established TS 11 bearer for this UE, then GERAN/UTRAN does not indicate that the handover is for CS to PS in the Handover Required message;
– If the "CS to PS SRVCC operation possible" indication is not set (i.e. either the network or UE is not CS to PS SRVCC capable, and a valid IMS registration via PS still exists), or the UE has not indicated in Radio Access Capabilities support for CS to PS SRVCC to this RAT, then GERAN/UTRAN does not indicate that the handover for CS to PS in the Handover Required message. Moreover:
– if there is an established TS 11 bearer for this UE, then VoIP-capable cells are not be included in the NCL;
– if there is no established TS 11 bearer for this UE, then VoIP-capable cells may be included in the NCL.
Annex B (informative):
Change history
Change history |
|||||||
Date |
Meeting |
TDoc |
CR |
Rev |
Cat |
Subject/Comment |
New version |
2011-06 |
SP-52 |
SP-110342 |
0195 |
1 |
B |
Remove editor’s note for predefined codec in case of vSRVCC |
11.1.0 |
2011-06 |
SP-52 |
SP-110342 |
0196 |
1 |
F |
Remaining changes for vSRVCC |
11.1.0 |
2011-06 |
SP-52 |
SP-110342 |
0197 |
2 |
F |
Remove editor’s note on end-to-end video codec negotiation in case of vSRVCC |
11.1.0 |
2011-06 |
SP-52 |
SP-110325 |
0203 |
2 |
A |
Fix SRVCC related data transfer between MMEes/SGSNs |
11.1.0 |
2011-06 |
SP-52 |
SP-110337 |
0211 |
2 |
A |
Clarification on the MSC selection mechanism in the MME/SGSN |
11.1.0 |
2011-06 |
SP-52 |
SP-110323 |
0215 |
1 |
A |
QCI=1 usage in SRVCC |
11.1.0 |
2011-06 |
SP-52 |
SP-110337 |
0217 |
– |
A |
Aligning the error procedures for SRVCC with stage 3 |
11.1.0 |
2011-06 |
SP-52 |
SP-110325 |
0218 |
– |
A |
Correction on source SAI in UTRAN to GERAN SRVCC handover |
11.1.0 |
2011-09 |
SP-53 |
SP-110464 |
0222 |
2 |
B |
eMPS for SRVCC on EPS/MSS level |
11.2.0 |
2011-12 |
SP-54 |
SP-110745 |
0223 |
2 |
F |
vSRVCC Cleanup |
11.3.0 |
2011-12 |
SP-54 |
SP-110745 |
0224 |
1 |
F |
Clarification of vSRVCC capability indicator handling |
11.3.0 |
2011-12 |
SP-54 |
SP-110745 |
0225 |
2 |
F |
Clarification of the vSRVCC indicator handling in the PCRF |
11.3.0 |
2011-12 |
SP-54 |
SP-110745 |
0226 |
1 |
F |
Correction of the wrong usage of the PS-to-CS handover indicator |
11.3.0 |
2011-12 |
SP-54 |
SP-110745 |
0233 |
– |
F |
Clarification on codec negotiation of vSRVCC UE |
11.3.0 |
2011-12 |
SP-54 |
SP-110747 |
0235 |
2 |
B |
Introduction of SRVCC from CS to PS |
11.3.0 |
2011-12 |
SP-54 |
SP-110745 |
0236 |
2 |
F |
Remove impacts of vSRVCC in E-UTRAN |
11.3.0 |
2011-12 |
SP-54 |
SP-110737 |
0240 |
– |
A |
Correction of roaming procedures for ICS |
11.3.0 |
2012-03 |
SP-55 |
SP-120075 |
0247 |
1 |
A |
SRVCC recovery due to incomplete IMS session continuity procedure |
11.4.0 |
2012-03 |
SP-55 |
SP-120065 |
0251 |
1 |
A |
Intra-UMTS SRVCC handover correction |
11.4.0 |
2012-03 |
SP-55 |
SP-120087 |
0241 |
2 |
F |
Release resource in RAN at SRVCC procedure |
11.4.0 |
2012-03 |
SP-55 |
SP-120087 |
0253 |
1 |
F |
Timing of Suspension Procedure during SRVCC to GERAN without DTM Support |
11.4.0 |
2012-03 |
SP-55 |
SP-120084 |
0254 |
– |
F |
Reverse SRVCC and PCC |
11.4.0 |
2012-03 |
SP-55 |
SP-120087 |
0259 |
– |
F |
Clarifications on usage of CAMEL triggers during SRVCC |
11.4.0 |
2012-03 |
SP-55 |
SP-120084 |
0260 |
1 |
F |
MME selection for rSRVCC |
11.4.0 |
2012-03 |
SP-55 |
SP-120084 |
0262 |
1 |
F |
Call flow corrections for rSRVCC HO |
11.4.0 |
2012-03 |
SP-55 |
SP-120084 |
0263 |
1 |
C |
Bearer release handling in the source MME/SGSN |
11.4.0 |
2012-03 |
SP-55 |
SP-120084 |
0264 |
1 |
C |
Emergency call handling in rSRVCC |
11.4.0 |
2012-06 |
SP-56 |
SP-120245 |
0238 |
2 |
F |
vSRVCC – Update of PCRF related functionality |
11.5.0 |
2012-06 |
SP-56 |
SP-120242 |
0245 |
3 |
C |
Clarification of eMPS SRVCC for video |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0265 |
1 |
F |
rSRVCC with Gn/Gp SGSN |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0266 |
2 |
F |
Clarification for the anchor MSC Server and DTM/PS HO support |
11.5.0 |
2012-06 |
SP-56 |
SP-120245 |
0271 |
1 |
F |
Clarification on statement of vSRVCC |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0272 |
1 |
F |
Clarifications on failure scenarios for CS to PS SRVCC |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0273 |
2 |
F |
Clarifications on prerequisites for CS to PS SRVCC |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0274 |
1 |
F |
Correction on target SGSN/MME selection |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0275 |
5 |
F |
Details on the mechanism to provide Serving PS node information to the MSC Server |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0277 |
1 |
F |
Figure alignment corrections |
11.5.0 |
2012-06 |
SP-56 |
SP-120250 |
0278 |
2 |
F |
Clarification on TAU after 1xCS SRVCC |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0280 |
1 |
F |
RSRVCC Signalling Flow Corrections |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0282 |
1 |
F |
Correction of bearer setup in UTRAN (HSPA) |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0284 |
1 |
F |
Failure case using Cancel Notification for CS to PS SRVCC |
11.5.0 |
2012-06 |
SP-56 |
SP-120250 |
0285 |
1 |
F |
Correction to operator policy requirements on setting of SRVCC and vSRVCC Capabilities |
11.5.0 |
2012-06 |
SP-56 |
SP-120250 |
0290 |
1 |
F |
Impact of radio capabilities and network sharing in target cell selection and handover for SRVCC |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0292 |
– |
F |
Clarification on rSRVCC operation possible indication update |
11.5.0 |
2012-06 |
SP-56 |
SP-120237 |
0294 |
1 |
A |
Clarification on SRVCC session transfer error handling |
11.5.0 |
2012-06 |
SP-56 |
SP-120248 |
0296 |
– |
F |
UE rSRVCC capability indication and GERAN/UTRAN functions |
11.5.0 |
2012-09 |
SP-57 |
SP-120480 |
0299 |
– |
F |
CS to PS SRVCC cancellation clarification |
11.6.0 |
2012-09 |
SP-57 |
SP-120484 |
0300 |
– |
F |
Correction of references |
11.6.0 |
2012-09 |
SP-57 |
SP-120486 |
0301 |
1 |
F |
Impact of radio capabilities and network sharing in target cell selection and handover for HSPA SRVCC |
11.6.0 |
2012-09 |
SP-57 |
SP-120484 |
0303 |
2 |
F |
Clarification to SRVCC Handover Cancellation Procedure in Sec 8.1.3 |
11.6.0 |
2012-12 |
SP-58 |
SP-120714 |
0308 |
1 |
A |
SRVCC clarification of Failure after responding to PS to CS HO request |
11.7.0 |
2012-12 |
SP-58 |
SP-120724 |
0309 |
1 |
F |
Remove intra UMTS CS to PS SRVCC Handover |
11.7.0 |
2013-03 |
SP-59 |
SP-130084 |
0310 |
1 |
F |
Corrections to vSRVCC procedure from E-UTRAN to UTRAN with PS HO support |
11.8.0 |
2013-03 |
SP-59 |
SP-130088 |
0311 |
1 |
F |
Correct description of the impact on P-GW due to SRVCC |
11.8.0 |
2013-06 |
SP-60 |
SP-130214 |
0314 |
1 |
A |
SRVCC Handover Cancellation corrections |
11.9.0 |
2013-06 |
SP-60 |
SP-130309 |
0315 |
1 |
F |
PS-to-CS handover indicator for the E-UTRAN-to-1x SRVCC procedure |
11.9.0 |
2013-06 |
SP-60 |
SP-130221 |
0317 |
1 |
F |
HO restriction to E-UTRAN for rSRVCC from UTRAN |
11.9.0 |
2013-06 |
SP-60 |
SP-130309 |
0318 |
1 |
F |
Inclusion of equipment identifier in normal mode of operation |
11.9.0 |
2013-12 |
SP-62 |
SP-130521 |
0320 |
1 |
F |
Race conditions in SRVCC with PS handover |
11.10.0 |
2013-12 |
SP-62 |
SP-130533 |
0316 |
4 |
B |
Returning back to E-UTRAN after SRVCC |
12.0.0 |
2014-06 |
SP-64 |
SP-140255 |
0325 |
– |
A |
Correction on location reporting in emergency 1xSRVCC |
12.1.0 |
2014-12 |
SP-66 |
SP-140686 |
0330 |
2 |
F |
Determining ‘SRVCC Operation Possible’ with Roaming Agreement |
12.2.0 |
2015-06 |
SP-68 |
SP-150230 |
0331 |
2 |
F |
Clarification of CS user plane restoration during SRVCC HO |
12.3.0 |
2015-06 |
SP-68 |
SP-150239 |
0332 |
2 |
F |
Updating SRVCC operation possible in E-UTRAN |
13.0.0 |
2015-12 |
SP-70 |
SP-150614 |
0333 |
1 |
F |
Clarification to Location Update procedure during SRVCC |
13.1.0 |
2016-09 |
SP-73 |
SP-160644 |
0343 |
2 |
F |
SRVCC Operation for IMS emergency |
13.2.0 |
2016-09 |
SP-73 |
SP-160647 |
0341 |
– |
F |
Support of SRVCC for eCall Over IMS |
14.0.0 |
2017-09 |
SP-77 |
SP-170732 |
0344 |
1 |
C |
SRVCC HO failure for Emergency handling |
15.0.0 |
2017-12 |
SP-78 |
SP-170920 |
0346 |
1 |
C |
Secondary RAT Usage Data Reporting for SRVCC |
15.1.0 |
2018-06 |
SP-80 |
SP-180475 |
0348 |
1 |
F |
Clarification on the enabling SRVCC during 5GS to EPS connected mode mobility |
15.2.0 |
2019-03 |
SP-83 |
SP-190162 |
0352 |
1 |
B |
Adding 5G SRVCC description to scope and definition to 23.216 |
16.0.0 |
2019-03 |
SP-83 |
SP-190162 |
0354 |
5 |
B |
5G-SRVCC procedure |
16.0.0 |
2019-06 |
SP-84 |
SP-190406 |
0355 |
2 |
F |
The HSS can decide to not inform the MME / SGSN of STN-SR change |
16.1.0 |
2019-09 |
SP-85 |
SP-190601 |
0357 |
– |
A |
Enabling SRVCC for emergency call transferred to EPS |
16.2.0 |
2019-12 |
SP-86 |
SP-191072 |
0359 |
– |
F |
PDU Session release due to 5G SRVCC |
16.3.0 |
2019-12 |
SP-86 |
SP-191072 |
0360 |
– |
F |
Clarification on the interface enahncement between AMF and MME_SRVCC |
16.3.0 |
2019-12 |
SP-86 |
SP-191089 |
0362 |
1 |
F |
Alignement on support of multiple EATF instances |
16.3.0 |
2020-03 |
SP-87E |
SP-200066 |
0358 |
5 |
C |
5G-SRVCC from NG-RAN to UTRAN for emergency session |
16.4.0 |
2020-03 |
SP-87E |
SP-200066 |
0364 |
– |
F |
Clarify STN-SR update and removal by UDM |
16.4.0 |
2020-03 |
SP-87E |
SP-200066 |
0366 |
1 |
F |
Mega CR on editorial corrections for 5G_SRVCC |
16.4.0 |
2020-03 |
SP-87E |
SP-200066 |
0367 |
1 |
F |
SRVCC operation impossible indication for 5G emergency SRVCC |
16.4.0 |
2021-06 |
SP-92E |
SP-210330 |
0369 |
1 |
F |
Clarificaton on the eNB behavoir for SRVCC |
16.5.0 |
2022-03 |
SP-95E |
SP-220043 |
0371 |
– |
F |
MSC Server performing a TMSI reallocation and a MAP Update Location at 5G-SRVCC |
16.6.0 |
2022-06 |
SP-96 |
SP-220391 |
0372 |
2 |
F |
AMF interaction with GMLC at SRVCC for an Emergency session |
16.7.0 |