Category: 8.3 Procedures for Dual Connectivity
- 8.3.18 SCG Failure Transfer
- 8.3.19 Conditional PSCell Change Cancel
- 8.3.13 Secondary RAT Data Usage Report
- 8.3.14 Trace Start
- 8.3.15 Deactivate Trace
- 8.3.16 Cell Traffic Trace
- 8.3.17 SCG Failure Information Report
- 8.3.8 S-NG-RAN node Counter Check
- 8.3.9 RRC Transfer
- 8.3.10 Notification Control Indication