Skip to content
TechSpec
Category:
8 Overall procedures in gNB-CU/gNB-DU Architecture
8.4.2 Secondary Node Release (MN/SN initiated)
8.2.1 Intra-NR Mobility
8.2.2 EN-DC Mobility
8.2.3 Intra-CU topology adaptation procedure
8.2.4 Intra-CU topological redundancy procedure
8.1 UE Initial Access
Posts navigation
Newer posts