Category: 8 Overall procedures in gNB-CU/gNB-DU Architecture
- 8.9.10 IAB-node release
- 8.9.11 IAB-node OAM
- 8.9.12 Handling of IAB-MTs in INACTIVE State
- 8.9.5 Change of gNB-CU-UP
- 8.9.6 RRC State transition
- 8.9.7 Trace activation/deactivation over F1 and E1
- 8.9.3 Bearer context release over F1-U
- 8.9.4 Inter-gNB handover involving gNB-CU-UP change
- 8.8 Multiple TNLAs for F1-C
- 8.9 Overall procedures involving E1 and F1