Category: 8.9 Overall procedures involving E1 and F1
- 8.9.13 IP Address Allocation for IAB-nodes
- 8.9.8 BH RLC channel establishment procedure
- 8.9.9 Traffic Mapping
- 8.9.10 IAB-node release
- 8.9.11 IAB-node OAM
- 8.9.12 Handling of IAB-MTs in INACTIVE State
- 8.9.7 Trace activation/deactivation over F1 and E1
- 8.9.3 Bearer context release over F1-U
- 8.9.4 Inter-gNB handover involving gNB-CU-UP change
- 8.9.5 Change of gNB-CU-UP