Skip to content
TechSpec

Category: 8.4 Multi-Connectivity operation

  • 8.4.3 SCG suspend/resume in RRC_INACTIVE
  • 8.4.4 SCG Deactivation and Activation
  • 8.4.1 Secondary Node Addition
  • 8.4.2 Secondary Node Release (MN/SN initiated)